PROBLEM TO BE SOLVED: To provide a contamination reducing capable of satisfying sedimentation accelerating function of a contaminant and water purifying function at normal flow, and also reducing increase of flow rate and also flowing water preventing ratio (flowing water…
Sanshin Corp
<P>PROBLEM TO BE SOLVED: To fill the large depth and a long section, with improved work efficiency and reduced drilled hole diameter, in a ground filling construction method of the ground having a risk of liquefaction, particularly, an existing structure lower part hard to…
PROBLEM TO BE SOLVED: To provide a method and a device for monitoring a cutting state of soil in a high pressure jet agitation method, capable of easily confirming the diameter of a soil improvement body which is about to be constructed by recognizing the cutting state of…
PROBLEM TO BE SOLVED: To obviate switching/positioning, and improve the working efficiency by boring a hole by a boring mechanism arranged on a bolter head, injecting cement milk through the boring mechanism, and then, replacing a driving rod with a boring rod. SOLUTION: In a…
PROBLEM TO BE SOLVED: To provide a method for efficiently measuring residual tensile force of a bonded type anchor.SOLUTION: When monitoring the residual tensile force of a bonded type anchor that has grout 5filled in a tensile part 2 and a tendon 4 constrained after tensioning…
The invention provides a panel grinding device which adopts a pair of grinding belts arranging the panel at the edge and configured up and down, to clamp the surface and back of the panel, such that two faces of the panel can be grinded and washed simultaneously. The panel…
PROBLEM TO BE SOLVED: To provide a reinforcement body and a reinforcement structure of a concrete structure, capable of efficiently reinforcing the concrete structure which is difficult to reconstruct.SOLUTION: A reinforcement body 2 of the concrete structure (dam body C of a…
PROBLEM TO BE SOLVED: To increase the reliability of the cutoff of a cable to be used for the reinforcement application of a concrete structure, and to prevent the intrusion of a corrosion factor to the inside by performing highly reliable cutoff even when a longitudinal anchor…
PROBLEM TO BE SOLVED: To facilitate the treatment of excess sludge having needed much labor in the maintenance and control in catalytic oxidation in a water purifying system combining a catalytic oxidation process and a wetland process. SOLUTION: A filamentous microorganism…
<P>PROBLEM TO BE SOLVED: To provide a construction method for the dismantlement and removal of underground structures having foundation piles and can safely and reliably dismantle and safely remove an underground structure having foundation piles constructed adjacently to…
PROBLEM TO BE SOLVED: To provide a compaction method which is high in protrusion restraining effects.SOLUTION: A ground improvement material is press-fit via an injection pipe into the ground so that an improvement body whose peripheral ground is compacted can be established in…
<P>PROBLEM TO BE SOLVED: To provide a tunnel repairing work vehicle wherein the cost of work for repairing an inner wall surface of a tunnel is reduced. <P>SOLUTION: A hoisting and lowering mechanism 39 makes an ascending/descending body 33 ascendably/descendably…
<P>PROBLEM TO BE SOLVED: To provide anchor structure capable of exhibiting a high extraction yield strength, while restraining an anchor length to a length as short as possible. <P>SOLUTION: An anchor preparation part is used for fixing earth retaining tension wires…
<P>PROBLEM TO BE SOLVED: To provide a stirring device of opening and closing type including a stirring blade being openable and closable without requiring a large-scale device such as a hydraulic cylinder and having a simple and compact structure. <P>SOLUTION: This…
PROBLEM TO BE SOLVED: To solve the problems that, since there is no means to confirm the arrival of a jet flow of a hardening material or the like to a prescribed part in a conventional injection method and longer excavation time and injection time are needed depending on an…
PROBLEM TO BE SOLVED: To surely pressurize and inject grout materials into all bags and to sufficiently expand the grout materials when serially arranging a plurality of bags in a pipe axis direction of a grout injection pipe.SOLUTION: A rock mass reinforcement 1 comprises bags…
PROBLEM TO BE SOLVED: To provide a method for setting a construction specification by which an improvement diameter and an improvement body strength in a high-pressure injection stirring method can be respectively controlled and the improvement body of a high-quality can be…
PROBLEM TO BE SOLVED: To prevent bank breakage due to piping by reinforcing a bank itself and the foundation ground by performing at least one of reinforcing soil and fiber mixing reinforcing soil and its embankment. SOLUTION: Counterweight filling is performed by fiber mixing…
<P>PROBLEM TO BE SOLVED: To provide a bottom ground reinforcing device for a shaft provided with a consolidation body having no through passage allowing underground water to ooze out in a soil retaining wall and having higher water cut-off property than a conventional…
<P>PROBLEM TO BE SOLVED: To provide a mud pressure dehydration device for pressure-dehydrating mud such as sludge generated in the jet grout construction method which is capable of conducting the dehydration treatment of mud by relatively simple device, of efficiently…
<P>PROBLEM TO BE SOLVED: To obtain a satisfactory sideways flow preventive effect by effectively reinforcing the banking support ground by improving soil having a low improvement rate. <P>SOLUTION: A soil improvement body 3 supporting at least the peripheral edge…
<P>PROBLEM TO BE SOLVED: To prevent horizontal displacement of a sideways flow or the like by stably supporting a structure in soft natural ground using simple artificial ground without a pile, and stabilizing the natural ground. <P>SOLUTION: A floor slab 2 for…
To provide a construction method of a compaction method capable of determining a construction specification in advance.SOLUTION: A construction method of a compaction method includes: a process of injecting soil improvement material into the ground through a filling pipe to…
<P>PROBLEM TO BE SOLVED: To improve working efficiency of a ground improvement and injection efficiency of chemicals by a further simple device and a construction method, while setting a universal excavating construction method as the basis. <P>SOLUTION: The inside…
<P>PROBLEM TO BE SOLVED: To treat fungo or highly concentrated electrolyte-containing waste slurry generated in a civil construction site like soil improvement, more efficiently and more inexpensively than the conventional method. <P>SOLUTION: The slurry produced in…