<P>PROBLEM TO BE SOLVED: To surely carry out soil improvement of a desired range in a short time. <P>SOLUTION: A soil agitating apparatus is provided with a supporter 1 moved in a vertical directional state together with movement of a moving body moved in at least…
Tomec Corp
<P>PROBLEM TO BE SOLVED: To increase the tip bearing force and peripheral surface friction force of a pile by jointly using a steel pipe having a projection, a vibro-hammer, a water jet, and a flowing solidifying material. <P>SOLUTION: This construction method of the…
PROBLEM TO BE SOLVED: To provide a method and a device for monitoring a cutting state of soil in a high pressure jet agitation method, capable of easily confirming the diameter of a soil improvement body which is about to be constructed by recognizing the cutting state of…
PROBLEM TO BE SOLVED: To press piles in using a hydraulic pile presser and drawer while adjusting the top ends of the piles to the ground level GL (or level of trench excavation and so forth) without performing trench excavation. SOLUTION: To place eight piles from no. 1 to no.…
<P>PROBLEM TO BE SOLVED: To provide a technology effective in reusing moisture-containing fluid waste. <P>SOLUTION: A fluid raw material is adjusted on a specific gravity by adding or removing moisture by a specific gravity adjusting device 1. Next, a solidification…
PROBLEM TO BE SOLVED: To provide a construction method for a driven pile, jointly using vibrations and pressure water injection, having an execution management method for enabling the reliable acquirement of a prescribed bearing capacity while allowing for an influence on a…
<P>PROBLEM TO BE SOLVED: To provide a soil cement underground continuous wall construction method by one-path excavation without requiring retreat excavation, reducing a waste sludge quantity, without being influenced by a boring advance speed, in a construction method,…
<P>PROBLEM TO BE SOLVED: To provide a washing apparatus for a cylindrical structure constituted so as to remove a pollutant efficiently and certainly at a low cost in a short time. <P>SOLUTION: The washing apparatus for the cylindrical structure has a first expansion…
<P>PROBLEM TO BE SOLVED: To provide a mud pressure dehydration device for pressure-dehydrating mud such as sludge generated in the jet grout construction method which is capable of conducting the dehydration treatment of mud by relatively simple device, of efficiently…
<P>PROBLEM TO BE SOLVED: To solve a problem in a conventional back hoe wherein agitation depth is digitally displayed in real time when improving soil, and it is difficult to acquire as an image which part in the ground is agitated only from the agitation depth.…
PROBLEM TO BE SOLVED: To provide a deposit removing device capable of securely and efficiently removing deposit adhered to a pile and a sheet pile. SOLUTION: The deposit removing device 10 is provided with a body part 20 formed into a substantially circular arc shape when viewed…
PROBLEM TO BE SOLVED: To protect a sheet pile main body lower end part and a nozzle so as to efficiently build a sheet pile by arranging a water guiding tube on one side face of the sheet pile main body, installing a drilling body shaped in an inverted triangle in lateral cross…
<P>PROBLEM TO BE SOLVED: To provide a ground improvement system and a construction method incorporated with respective advantageous characteristics of an injection agitating simultaneously using type mechanical agitating construction method and an abrasive jet construction…
PROBLEM TO BE SOLVED: To solve a problem with a conventional backhoe that although the current and past positions of the passing tip of a ground stirring part are displayed, the degree of ground improvement in the ground cannot be confirmed sufficiently.SOLUTION: With a…
To provide an open pit method that does not interfere with an installation work of an underground burial structure by the fact that the ground sinks by the weight of the underground burial structure and that prevents surrounding houses from being tilted due to the ground…
PROBLEM TO BE SOLVED: To provide a washing apparatus capable of stable, efficient, and extensive washing work while effectively eliminating a manual operation. SOLUTION: This washing apparatus comprises high-pressure water jetting means (a washing attachment 1) provided on an…
PROBLEM TO BE SOLVED: To provide a dehydration system for performing dehydration so that slurry can be recycled, a muddy water-treating system using it, and a dehydration method. SOLUTION: By providing a filter-pressing device with a filtering chamber 17 that can be opened and…
PROBLEM TO BE SOLVED: To provide a solidifying material which is safe for organisms and vegetations in a neutral region, preferentially improves the strength of soil in a weakly alkaline region, and can be used in wide uses, to provide a method for producing improved soil with…
PROBLEM TO BE SOLVED: To prevent the reduction in stirring efficiency even when reducing a torque in a ground improving body creating device. SOLUTION: A passage for high-pressure fluid is formed in an injection rod 11, and a high-pressure fluid is injected from injection…
<P>PROBLEM TO BE SOLVED: To provide a conveying apparatus suited for laying work using a messer shield, the apparatus being versatile and capable of securing and traveling on a path of travel within the boring width of the shield whether the subject to be conveyed is of…
PROBLEM TO BE SOLVED: To enable pile driving work to be performed in a low-height space on a narrow site and the like, without making the height of a pile driver deteriorate workability of a work space.SOLUTION: A low-height pile driver for use in work for driving piles…
PROBLEM TO BE SOLVED: To solve such a problem that when waste is solidified by adding/mixing a solidifying material such as cement thereto/therewith and the solidified waste is used as a land formation material such as a sea level reclamation material, a part (such as a toxic…
PROBLEM TO BE SOLVED: To solve the problem that, since higher harmonic waves of a primary power source are reduced by connecting two three-phase bridge rectifiers and connecting loads of equal capacity to both terminals in a conventional twelve-pulse rectifier circuit, if one…
<P>PROBLEM TO BE SOLVED: To enable efficient and economical improvement of a place hard to be soil-improved such as the part under an existing structure or the like without limitation of locational conditions. <P>SOLUTION: The ground 4 is bored from the ground…
<P>PROBLEM TO BE SOLVED: To provide a ground improvement body creating device and its construction method for preventing excessive agitation of a hardener, and improving agitating efficiency. <P>SOLUTION: This ground improvement body creating device 10 has a rod part…