<P>PROBLEM TO BE SOLVED: To shorten a construction period of a corrugated steel plate web bridge without a large increase in erection cost in a cantilever overhang erection method of the corrugated steel plate web bridge using a mobile working vehicle. <P>SOLUTION:…
Zenitaka Corp
<P>PROBLEM TO BE SOLVED: To provide a dust reducing agent for dust grinding which does not bring about a large sewage and sludge, and can prevent dust from flying about; and a dust dry removing method. <P>SOLUTION: The dust reducing agent for dust grinding is…
In a sludge treatment tank, members made of a glass long-fiber reinforced foamed plastic composite material are used as formworks in construction and then left as an inside wall member. The composite material functions as formworks in a construction method as well as applies an…
<P>PROBLEM TO BE SOLVED: To reduce risk of damaging an isolator protective device itself by its tensile force, while inexpensively realizing the isolator protective device for protecting an isolator by reducing the tensile force in the vertical direction acting on the…
PURPOSE:To obtain a small-sized, lightweight permanent ground anchor which is sufficiently strong, yet requiring small diameter for drilling by employing stranded wires made of new material. CONSTITUTION:A head anchorage body section 4 in which stranded wires 7 made of new…
PROBLEM TO BE SOLVED: To provide a method for efficiently constructing a large-sectional tunnel like an underground parking, for instance. SOLUTION: There is provided a shield tunneling method, according to which the natural ground is excavated by a shield machine 100 and…
<P>PROBLEM TO BE SOLVED: To provide a plastic grouting material and a grouting method thereof, which make effective use of a coal ash in large quantities, and which can utilize effectively for the back-filling to a hollow stopping on a constructional structure, for…
To provide an information management system capable of appropriately monitoring the condition of workers and a heavy machine in a construction area at a position away from the construction area.SOLUTION: An information management system in a construction area in which at least…
PROBLEM TO BE SOLVED: To provide a groundwater environmental preservation method in a bypassing system of natural flow of a groundwater system, which can preserve the volume of groundwater system, can prevent degradation of water quality, and can positively improve the water…
PROBLEM TO BE SOLVED: To provide an in-tunnel construction state detecting method which can easily measure inner-cavity displacement and an inner-cavity sectional shape and picks up a face image by one device and gather surface information on the cavity of a tunnel. SOLUTION:…
<P>PROBLEM TO BE SOLVED: To provide an apparatus for cleaning the inside of a vertical cylindrical body, with which an attachment layer contaminated with dioxins inside a chimney is removed without using water while preventing the surrounding environment from being…
<P>PROBLEM TO BE SOLVED: To provide a rejoined segment rejoinable after releasing joining of the once assembled segment. <P>SOLUTION: The rejoined segment forming the outer shell of a tunnel comprises a rejoined end 51 rejoinable in the circumferential direction of…
To provide a slab supporting structure capable of suppressing a lateral buckling even when a steel beam is attached to only one side of a floor slab.SOLUTION: A slab support structure for supporting a floor slab by means of a steel beam comprises: a first steel beam extending in…
PURPOSE:To facilitate the discharge of excavated earth to be discharged in a process which bores a drilling hole and the transportation of the soil based on a force feed process for the formation of improved soil in a mixing plant when forming a soil cement column in the ground.…
PROBLEM TO BE SOLVED: To measure the gas concentration of a bed at real time during excavation so as to be able to predict a danger to be confronted with in an abnormal gas concentration bed by feeding hot water to a mud sample to produce a mixed gas, and measuring the…
PROBLEM TO BE SOLVED: To provide an earth retaining wall structural member wherein joining strength between H-steels and a composite is ensured with a simple structure. SOLUTION: The present earth retaining wall structural member 20 is used for an earth retaining wall that…
PROBLEM TO BE SOLVED: To provide an inspection gallery in a fill-type dam and a construction method of the inspection gallery in the fill-type dam, shortening a construction period, improving workability through the decrease of work processes and reducing the total cost.…
<P>PROBLEM TO BE SOLVED: To provide a strain measuring method and a current stress measuring method, which enable more precise calculation of the stress acting on a concrete structural member, which has taken into consideration the effect by the temperature difference,…
<P>PROBLEM TO BE SOLVED: To provide concrete installation structure for a laser distance measurement device for use in measurement of the settlement of a road surface or the like, and to permit accurate and stable measurement. <P>SOLUTION: In the road surface…
<P>PROBLEM TO BE SOLVED: To provide a pipe joint for drainage and ventilation, which enables an insertion portion to be surely inserted into a vent pipe without reference to a construction error of the length of the protrusion of the vent pipe, the degree of the…
<P>PROBLEM TO BE SOLVED: To provide a curing system and a curing method for a grout material, in construction in cold weather even of a high pier long-span bridge or the like using prestressed concrete, for inexpensively and easily preventing freezing of the grout material…
PURPOSE:To obtain a segment for lining a tunnel, which has high strength, high rigidity, and light weight and which facilitates handling. CONSTITUTION:A hollow space 7 is provided in the section of a composite segment 1 composed of steel and cement. The external steel shell…
In a sludge treatment tank, members made of a glass long-fiber reinforced foamed plastic composite material are used as formworks in construction and then left as an inside wall member. The composite material functions as formworks in a construction method as well as applies an…
PROBLEM TO BE SOLVED: To augment the bearing power in the vertical direction and the horizontal direction of the foundation of an existing structure and increase the reliability of aseismatic reinforcement. SOLUTION: A composite column 10 is formed in the ground 3 around…
<P>PROBLEM TO BE SOLVED: To provide a construction method of a concrete bridge which can contribute to the reduction of a construction period while eliminating a reduction in connection strength of a reinforcement in the axial direction between each blocks of the…