Patents
Assignee / Organization

Zenitaka Corp

160Total Forward Citations
32Indexed Patents
5Avg Citations / Patent
8Portfolio H-Index
JP 2008088782 A#1744557 Most Cited · 35 citations1.9/yr · PR 6.47ActiveJP · Utility
Cantilever overhang erection method of corrugated steel plate web bridge

<P>PROBLEM TO BE SOLVED: To shorten a construction period of a corrugated steel plate web bridge without a large increase in erection cost in a cantilever overhang erection method of the corrugated steel plate web bridge using a mobile working vehicle. <P>SOLUTION:…

JP 2006199837 A#1805237 Most Cited · 34 citations1.7/yr · PR 13.31ExpiredJP · Utility
Dust reducing agent for dust grinding and dust dry removing method

<P>PROBLEM TO BE SOLVED: To provide a dust reducing agent for dust grinding which does not bring about a large sewage and sludge, and can prevent dust from flying about; and a dust dry removing method. <P>SOLUTION: The dust reducing agent for dust grinding is…

US 5,672,506 A#3283675 Most Cited · 24 citations0.8/yr · PR 2.81ExpiredUS · Utility
Sludge treatment tank and construction method thereof
Inventors: Aoyagi Keitaro, Niibe Sadao, Umegae Toshitomi, Iwai Hideo, Oshima YoshituguAssignee: Zenitaka Corp, Sekisui Chemical Co LtdFiled 1996-03-04 · Granted 1997-09-30

In a sludge treatment tank, members made of a glass long-fiber reinforced foamed plastic composite material are used as formworks in construction and then left as an inside wall member. The composite material functions as formworks in a construction method as well as applies an…

JP 2008215442 A#5663326 Most Cited · 16 citations0.9/yr · PR 3.56ActiveJP · Utility
Isolator protective device and base isolation device

<P>PROBLEM TO BE SOLVED: To reduce risk of damaging an isolator protective device itself by its tensile force, while inexpensively realizing the isolator protective device for protecting an isolator by reducing the tensile force in the vertical direction acting on the…

JP H0533336 A#6055685 Most Cited · 15 citations0.5/yr · PR 4.76ExpiredJP · Utility
Permanent ground anchor made of new material

PURPOSE:To obtain a small-sized, lightweight permanent ground anchor which is sufficiently strong, yet requiring small diameter for drilling by employing stranded wires made of new material. CONSTITUTION:A head anchorage body section 4 in which stranded wires 7 made of new…

JP 2002266598 A#6551055 Most Cited · 14 citations0.6/yr · PR 8.22ExpiredJP · Utility
Shield tunneling method, large-sectional tunnel, method for constructing the same, and shield machine
Inventors: Ida Takahisa, Saito Masaru, Kosaka FumioAssignee: Zenitaka Corp, Kosaka FumioFiled 2001-03-07

PROBLEM TO BE SOLVED: To provide a method for efficiently constructing a large-sectional tunnel like an underground parking, for instance. SOLUTION: There is provided a shield tunneling method, according to which the natural ground is excavated by a shield machine 100 and…

JP 2007002100 A#6717542 Most Cited · 14 citations0.7/yr · PR 3.38ExpiredJP · Utility
Plastic grouting material using coal ash and method for grouting the plastic grouting material

<P>PROBLEM TO BE SOLVED: To provide a plastic grouting material and a grouting method thereof, which make effective use of a coal ash in large quantities, and which can utilize effectively for the back-filling to a hollow stopping on a constructional structure, for…

JP 2019027049 A#6820951 Most Cited · 14 citations2.0/yr · PR 2.88ActiveJP · Utility
Alarm method and information management system for heavy machine operation and worker approach detection
Inventors: Shiraishi Masatsugu, Kasamizukami MitsuhiroAssignee: Zenitaka CorpFiled 2017-07-26

To provide an information management system capable of appropriately monitoring the condition of workers and a heavy machine in a construction area at a position away from the construction area.SOLUTION: An information management system in a construction area in which at least…

JP 2000186336 A#7359056 Most Cited · 13 citations0.5/yr · PR 3.29ExpiredJP · Utility
Ground water environmental preservation method

PROBLEM TO BE SOLVED: To provide a groundwater environmental preservation method in a bypassing system of natural flow of a groundwater system, which can preserve the volume of groundwater system, can prevent degradation of water quality, and can positively improve the water…

JP 2001289620 A#7187913 Most Cited · 13 citations0.5/yr · PR 7.07ExpiredJP · Utility
Method for detecting construction state in tunnel

PROBLEM TO BE SOLVED: To provide an in-tunnel construction state detecting method which can easily measure inner-cavity displacement and an inner-cavity sectional shape and picks up a face image by one device and gather surface information on the cavity of a tunnel. SOLUTION:…

JP 2005324163 A#7433172 Most Cited · 13 citations0.6/yr · PR 2.95ExpiredJP · Utility
Apparatus for cleaning inside of vertically cylindrical body

<P>PROBLEM TO BE SOLVED: To provide an apparatus for cleaning the inside of a vertical cylindrical body, with which an attachment layer contaminated with dioxins inside a chimney is removed without using water while preventing the surrounding environment from being…

JP 2007182696 A#7380200 Most Cited · 13 citations0.7/yr · PR 3.18ActiveJP · Utility
Rejoined segment and construction method of connected tunnel

<P>PROBLEM TO BE SOLVED: To provide a rejoined segment rejoinable after releasing joining of the once assembled segment. <P>SOLUTION: The rejoined segment forming the outer shell of a tunnel comprises a rejoined end 51 rejoinable in the circumferential direction of…

JP 2019206812 A#7503550 Most Cited · 13 citations1.9/yr · PR 2.72ActiveJP · Utility
Slab support structure

To provide a slab supporting structure capable of suppressing a lateral buckling even when a steel beam is attached to only one side of a floor slab.SOLUTION: A slab support structure for supporting a floor slab by means of a steel beam comprises: a first steel beam extending in…

JP H0633447 A#7254071 Most Cited · 13 citations0.4/yr · PR 4.30ExpiredJP · Utility
Ground improvement method

PURPOSE:To facilitate the discharge of excavated earth to be discharged in a process which bores a drilling hole and the transportation of the soil based on a force feed process for the formation of improved soil in a mixing plant when forming a soil cement column in the ground.…

JP H09166525 A#7632545 Most Cited · 13 citations0.5/yr · PR 2.38ExpiredJP · Utility
Gas detecting method for shield excavation and device therefor

PROBLEM TO BE SOLVED: To measure the gas concentration of a bed at real time during excavation so as to be able to predict a danger to be confronted with in an abnormal gas concentration bed by feeding hot water to a mud sample to produce a mixed gas, and measuring the…

JP 2000027590 A#8126552 Most Cited · 12 citations0.5/yr · PR 3.06ExpiredJP · Utility
Earth retaining wall structural member

PROBLEM TO BE SOLVED: To provide an earth retaining wall structural member wherein joining strength between H-steels and a composite is ensured with a simple structure. SOLUTION: The present earth retaining wall structural member 20 is used for an earth retaining wall that…

JP 2000073339 A#8110812 Most Cited · 12 citations0.5/yr · PR 3.13ExpiredJP · Utility
Inspection gallery in fill-type dam and construction method of inspection gallery in fill-type dam

PROBLEM TO BE SOLVED: To provide an inspection gallery in a fill-type dam and a construction method of the inspection gallery in the fill-type dam, shortening a construction period, improving workability through the decrease of work processes and reducing the total cost.…

JP 2004101322 A#8201510 Most Cited · 12 citations0.6/yr · PR 2.79ExpiredJP · Utility
Method for measuring strain and current stress of concrete structural member

<P>PROBLEM TO BE SOLVED: To provide a strain measuring method and a current stress measuring method, which enable more precise calculation of the stress acting on a concrete structural member, which has taken into consideration the effect by the temperature difference,…

JP 2004108775 A#8237431 Most Cited · 12 citations0.6/yr · PR 2.69ExpiredJP · Utility
Road surface measurement device

<P>PROBLEM TO BE SOLVED: To provide concrete installation structure for a laser distance measurement device for use in measurement of the settlement of a road surface or the like, and to permit accurate and stable measurement. <P>SOLUTION: In the road surface…

JP 2008308824 A#8415030 Most Cited · 12 citations0.7/yr · PR 2.31ActiveJP · Utility
Pipe joint for drainage and ventilation

<P>PROBLEM TO BE SOLVED: To provide a pipe joint for drainage and ventilation, which enables an insertion portion to be surely inserted into a vent pipe without reference to a construction error of the length of the protrusion of the vent pipe, the degree of the…

JP 2011032843 A#8075681 Most Cited · 12 citations0.8/yr · PR 3.31ActiveJP · Utility
Cold weather curing construction system and construction method for pc grout material
Inventors: Nonaga Kenji, Sakurai NaohisaAssignee: Zenitaka CorpFiled 2009-08-06

<P>PROBLEM TO BE SOLVED: To provide a curing system and a curing method for a grout material, in construction in cold weather even of a high pier long-span bridge or the like using prestressed concrete, for inexpensively and easily preventing freezing of the grout material…

JP H0742494 A#8479503 Most Cited · 12 citations0.4/yr · PR 2.19ExpiredJP · Utility
Segment for lining tunnel

PURPOSE:To obtain a segment for lining a tunnel, which has high strength, high rigidity, and light weight and which facilitates handling. CONSTITUTION:A hollow space 7 is provided in the section of a composite segment 1 composed of steel and cement. The external steel shell…

EP 0,732,308 A1#9186387 Most Cited · 11 citations0.4/yr · PR 2.46PendingEP · Application
Sludge treatment tank and construction method thereof

In a sludge treatment tank, members made of a glass long-fiber reinforced foamed plastic composite material are used as formworks in construction and then left as an inside wall member. The composite material functions as formworks in a construction method as well as applies an…

JP 2002188157 A#8959243 Most Cited · 11 citations0.5/yr · PR 3.08ExpiredJP · Utility
Aseismatic reinforcing method for foundation of existing structure

PROBLEM TO BE SOLVED: To augment the bearing power in the vertical direction and the horizontal direction of the foundation of an existing structure and increase the reliability of aseismatic reinforcement. SOLUTION: A composite column 10 is formed in the ground 3 around…

JP 2011032841 A#9075924 Most Cited · 11 citations0.7/yr · PR 2.70ActiveJP · Utility
Construction method of concrete bridge and moving working device used by method of construction

<P>PROBLEM TO BE SOLVED: To provide a construction method of a concrete bridge which can contribute to the reduction of a construction period while eliminating a reduction in connection strength of a reinforcement in the axial direction between each blocks of the…