<P>PROBLEM TO BE SOLVED: To provide a ground improving body forming method the construction period of which is shortened by simultaneously executing insertion of a steel pipe and formation of a ground improving body and which is excellent in economical effect, and a ground…
Nit Kk
<P>PROBLEM TO BE SOLVED: To solve the problem that a ground hardener force-fed is bent at a substantially right angle at a nozzle since a conventional injection nozzle for injecting the ground hardener at high pressure is arranged on the side wall of an injection rod by…
PROBLEM TO BE SOLVED: To solve the problems that, since there is no means to confirm the arrival of a jet flow of a hardening material or the like to a prescribed part in a conventional injection method and longer excavation time and injection time are needed depending on an…
<P>PROBLEM TO BE SOLVED: To provide a method for controlling a direction in horizontal drilling which is available in a soil improving method depending on high-pressure injection. <P>SOLUTION: In implementing the method for controlling the direction in horizontal…
<P>PROBLEM TO BE SOLVED: To solve the following problems: a driving head for agitating and mixing soil by the go-around drive of a drive chain by laying the drive chain in a tensioned state on a driving wheel is inefficient because an agitation and mixing range is limited…
<P>PROBLEM TO BE SOLVED: To solve the problem of an abrasion loss of the part and increased consumption of energy when an injection material supplied under high pressure receives resistance by acute angle bending of a flow passage since the flow passage formed of a…
<P>PROBLEM TO BE SOLVED: To solve the following problems: in hardening layer formation using direct agitation by an agitation blade, fluid agitation by a jet flow of a hardening material, and hardening material injection together, horizontal injection is mainly used…
PROBLEM TO BE SOLVED: To solve the problem in which a method of generating vortex flow and cavitation by installing conventional nozzles in close proximity to each other and causing mutual interference of jet flows in close proximity to each other causes shake of a rod during…
PROBLEM TO BE SOLVED: To solve the problem that, to prevent the flotation of a manhole due to earthquake, etc., there are means for providing such a physical structure as to connect a plate to a manhole body as well as a method using a strainer filling pipe for filling hardening…
<P>PROBLEM TO BE SOLVED: To provide a self-drilling monitor improving drilling efficiency and reducing loss of drilling water by eliminating useless discharge of drilling water from a solidifying material liquid jet nozzle in drilling, and a high-pressure jet mixing…
PROBLEM TO BE SOLVED: To provide a nursing relative information output system which is favorably used for supporting the interaction of information between a user such as a parent and a provider such as a nursing facility which provides nursing relative information about child…
<P>PROBLEM TO BE SOLVED: To solve the problem that conventionally a retaining wall is constructed around polluted soil to excavate and remove the polluted soil when land polluted in the past is cleaned and restored and thereafter, the excavated space is filled with a…
<P>PROBLEM TO BE SOLVED: To provide a method for measuring the drilling direction of a horizontal drillhole in the ground. <P>SOLUTION: The method for measuring the drilling direction for the horizontal drillhole in the ground includes providing a drill rod having a…
<P>PROBLEM TO BE SOLVED: To provide a ground hardening layer formation method and a device capable of solving such a problem that a hardener injection is conventionally protected by covering a hardener jet with air by polymerized jet nozzle consisting of a core nozzle and…
<P>PROBLEM TO BE SOLVED: To provide a ground hardening material with which a uniform hardened ground layer having a large enough diameter is created in the ground and ground stabilization and water cut-off are achieved reliably and effectively and a method of construction…
<P>PROBLEM TO BE SOLVED: To solve the problems of producing waste that a specially injected hardening material is discharged as slime, and thinning a built-up hardening material layer, since excessive suction may be caused, when ground internal pressure of the object…
<P>PROBLEM TO BE SOLVED: To solve a problem wherein it is impossible to cope with crack in a hardened layer and liquefaction phenomenon due to load applied from many directions such as earthquake and vibration in construction work by merely grouting ground hardener at the…
<P>PROBLEM TO BE SOLVED: To provide a compatibilizer for high pressure jetting stirring construction for stably obtaining a curing material provided with high flowability and a bleeding ratio. <P>SOLUTION: The compatibilizer for high pressure jetting stirring…
<P>PROBLEM TO BE SOLVED: To solve the following inconvenience: in a soil hardener injecting device, conventionally a lower injection channel is blocked by charging therein a spherical blocking body as a means for switching a mode from downward injection to side injection,…
<P>PROBLEM TO BE SOLVED: To provide a polluted ground water recovery method for solving the points at issue that a retaining wall is constructed in the periphery of a polluted water stagnation layer when ground water polluted with a chemical substance stagnates in the…
PROBLEM TO BE SOLVED: To solve the problems in using a spiral screw blade as a mixed agitating blade of an injection rod that: because the outer peripheral surface of a rod body and a screw blade surface are in close contact with each other between which there is no gap space,…
<P>PROBLEM TO BE SOLVED: To solve the problem that, although PCBs are regulated to store it in an owner office, the PCBs being lost by a bankruptcy and a movement of the office are much and are allowed to stand on a ground and is buried underground to contaminated soil and…
<P>PROBLEM TO BE SOLVED: To solve the problem of conventional injection of hardening material wherein the necessary amount of discharge cannot be secured because the hardening agent cannot be placed on injection pressure even if the injection pressure is increased; and…
<P>PROBLEM TO BE SOLVED: To overcome the following problem of a conventional soil hardener injecting method: conventionally at the time of injection of a hardener, a pair of nozzles are provided for an injection rod such that their injection ports are arranged back to back…
<P>PROBLEM TO BE SOLVED: To solve the following problem that, conventionally when a hardener is diagonally or horizontally injected, a pump of standard performance cannot exert sufficient injection pressure and a discharge amount, resulting in insufficient injection, and…