PROBLEM TO BE SOLVED: To drill the natural ground, inject a fixing material and insert a lock bolt continuously quickly and safely by machine execution by providing a drill jumbo with a device for storing, positioning, gripping and connecting a drilling rod and a lock bolt and a…
Numaguchi Eisuke
PROBLEM TO BE SOLVED: To perform improvement and reinforcement on earth and mountain obtaining necessary jacking reaction by slidably mounting a rock excavation device turnably and inclinably supporting a multi-function rock drill in the tunnel axis direction to a main beam or…
PROBLEM TO BE SOLVED: To demolish a tower structure such as a smokestack in a relatively easy and extremely efficient manner without being subject to restriction due to its height or making an operator contaminated with dust and dioxin, by utilzing a backhoe and the like, which…
PURPOSE:To reduce the vibration noise in real time momentarily corresponding to variation of the vibration pattern of the vibrating equipment even when the vibration pattern varies and to prevent an extremely low frequency sound from being generated. CONSTITUTION:A vibrating…
PROBLEM TO BE SOLVED: To provide a bedrock cleaning machine which can contribute to large reductions in working cost and process by increasing the efficiency of bedrock cleaning after the finish excavation of a bedrock in dam construction, and greatly enhancing construction…
PURPOSE:To prevent the incursion of back filling impregnation compound into a facing from an outbreak section and to make it possible to form a lining section or vibration isolation layer even in the outbreak section by excavating the ground with a diameter larger than an…
PURPOSE:To simply execute the continuous measurement without scarcely causing an error by displacing a differential pressure movable body in accordance with a difference of the water head of a liquid tank. CONSTITUTION:In a reference side unit 3 side, opening and closing of…
PROBLEM TO BE SOLVED: To enable a common control of driving and to obtain the strength of a main beam by arranging two driving units of the same structure where beam driving jacks are provided between wall pressers and the main beam. SOLUTION: A main beam 14 is extended behind a…
PROBLEM TO BE SOLVED: To excavate to lay an new sewer simultaneously with removal of an obsolete sewer. SOLUTION: A cut-through circular piping 5 for cutting through sewage in an existing old seer 1 to drain it is installed almost concentrically in the old sewer 1. A sewer…
<P>PROBLEM TO BE SOLVED: To provide a stack inner cylinder demolishing device which reduces high-place work, efficiently separates demolished waste pieces from each other, and contributes to drastic shortening of a demolishing work period. <P>SOLUTION: The stack…
<P>PROBLEM TO BE SOLVED: To provide treatment method and treatment apparatus of wastes such as asbestos-containing construction materials or the like by which asbestos-containing construction materials are safely treated at a low cost. <P>SOLUTION: The treatment…
PURPOSE: To facilitate cleaning and scraping operations, and make the operations efficient by letting a guide mast be tilted in parallel with an objective surface for cleaning and scraping, and letting a brush body to be pressed onto the objective surface be moved while being…
PURPOSE: To improve workability by mounting an auger to the boom of a running base machine through a leader, connecting a down-the-hole-hammer received in a casing steel pipe to the auger, and inserting the steel pipe into the natural ground while drilling with the hammer.…
PURPOSE:To prevent the incursion of water or earth by fixing an inner skin plate to the inside of a tail seal provided to the inside of a skin plate of a shield tail section, and providing a second tail seal to the entire surface of the inside thereof. CONSTITUTION:An inner skin…
<P>PROBLEM TO BE SOLVED: To provide a dust suppression method capable of efficiently suppressing the scattering of the dust and, at the same time, preventing the degradation of working efficiency and the deterioration of working environment and surrounding environment.…
PURPOSE:To automate measurement and thereby to enable execution of an effective control by a method wherein the amount of change in a tail clearance is converted into an electric signal and computed. CONSTITUTION:A detecting mechanism unit A is fitted to a skin plate 2 of a…
PURPOSE:To enable judgement to be easily and accurately made about the boundary of a natural ground section and a collapsed section even for poor subsoil, and evaluation to be properly made about a collapsed natural ground amount after the confirmation of a change, if any, in a…
PURPOSE: To prevent the collapse of the natural ground at an expanded outbreak section by efficiently taking in excavated sediment under the formation of the section for preventing a flow of a back filling material to a cutting blade therefrom, and forming a lining section and a…
PROBLEM TO BE SOLVED: To eliminate a difference in steps between a front barrel and a rear barrel to prevent the deformation of natural ground by providing a plurality of slits in an external crust of a boring machine and providing a plurality of projection parts in a gripper of…
<P>PROBLEM TO BE SOLVED: To provide a seismic control device capable of surely suppressing vibrations generated in an existing building, without the generation of bending moment unnecessary for a corner member. <P>SOLUTION: The corner member 19 of the seismic control…
PURPOSE:To effectively perform laitance disposal by a structure wherein a brush mounting base plate, to which disc-like brushes are oscillatingly mounted, is horizontally and slidably mounted to a hanging base plate, which has the required degrees of freedom in vertical…
PURPOSE:To make it possible to exactly execute laitance disposal by a method wherein concrete surface is vertically cut with a cylindrical brush so as to scrape off laitance and sweep the concrete surface and, at the same time, washing water is sprayed over the resultant…
PURPOSE:To automatically conduct a work requiring high skillfulness by installing a front laitance processing device and a rear laitance processing device on a self-running machine frame, sucking formed laitance, and sending and receiving it into a vacuum tank. CONSTITUTION:A…
PURPOSE:To land a walking leg always in the vertical direction to the landing surface even if the landing surface is an inclined surface, and to control the landing of the walking leg easily and correctly in a simple structure. CONSTITUTION:A landing control device is adapted to…