<P>PROBLEM TO BE SOLVED: To provide a test apparatus simultaneously measuring the water permeability and consolidation properties of hardly permeable soil. <P>SOLUTION: The consolidation and water permeability test apparatus is provided with: a triaxial cell 10; a…
Tobishima Construct Co Ltd
PROBLEM TO BE SOLVED: To attain the feedback of analytic information and the safety, efficiency, and high precision of a work by using a sense of virtual reality for operation support in a construction work. SOLUTION: This system is constituted of a reflection prism 21 for…
Cutter spokes are disposed on a cutterhead of a tunnel-excavating machine. Movable blocks, each having a roller cutter, are movably supported by each of the cutter spokes while being connected one another by means of a connection link. A gate mechanism is attached to an end…
PROBLEM TO BE SOLVED: To provide a nondestructive inspection system for structures using tomography that does not require oscillation means for a worker to hit a floor surface or the like of an expressway on scaffolding after going to a predetermined point of a structure using…
PROBLEM TO BE SOLVED: To produce a damping effect in a small earthquake without producing bending stresses on a frame by enabling a device to be efficiently placed without being affected by the size of the frame. SOLUTION: When a frame 16 is displaced by 61 in the rightward…
<P>PROBLEM TO BE SOLVED: To provide a distortion detecting device which forms a strain body being not made of so-called metal and resisting corrosion, without the need to protect the strain body by using an exterior material, brings the strain body to directly come in…
PROBLEM TO BE SOLVED: To suppress occurrence of dust and secure sufficient long period strength by merging and mixing set accelerating agent slurry to kneading concrete, and discharging it from the nozzle of a concrete supply pipe route end at prescribed pressure. SOLUTION: The…
PURPOSE: To gradually increase or decrease the excavating diameter while excavating, by widening a part or the outer shell plate constituting the shell from the inside of an excavating machine and closing the peripheral clearances with the expanded plate and flange.…
A domed structure having a retractable roof comprises an inside field area, a ringed structure vertically provided around said field area, two tracks laid out on the top of said ringed structure and two movable semi-vaults travelling separately on said two annular tracks, which…
<P>PROBLEM TO BE SOLVED: To provide a gas hydrate drilling and collecting method and its device directly drilling a gas hydrate layer, efficiently collecting gas while controlling gas decomposition within a drilling area, and capable of filling a void after collecting gas.…
PROBLEM TO BE SOLVED: To provide a damper which can be easily installed in expensively and built in a building and is capable of turning the building into an earthquake resistant construction. SOLUTION: The damper 10 is attached to a brace 16 placed diagonally into a framework…
PROBLEM TO BE SOLVED: To perform excavation direction control of a shield machine by obtaining necessary total thrust and bending moment from propulsion jacks in operation in a simultaneous excavation/assembling method.SOLUTION: When a group of propulsion jacks (J9 to J12)…
<P>PROBLEM TO BE SOLVED: To provide a grinding and sweeping apparatus uniformly grinding and sweeping a wall surface having a pollutant attached thereto, and preventing splash of waste water containing the pollutant caused by grinding and sweeping. <P>SOLUTION: This…
<P>PROBLEM TO BE SOLVED: To provide a shield jacking and assembly simultaneous construction method for controlling attitude of a shield machine during simultaneous construction easily and preventing the shield machine from requiring a special structure to perform…
<P>PROBLEM TO BE SOLVED: To provide a method and a device for determining the degree of damage in a structure by AE (Acoustic Emission) sound from a secondary origination capable of monitoring damage, which has occurred due to large earthquakes and impacts, and determining…
PROBLEM TO BE SOLVED: To prevent bad influence on the ground surface in excavating in either of the lower part and the upper part of a tunnel. SOLUTION: This device is provided with a large-diameter shield machine 2 arranged in the lower part and a plurality of small-diameter…
<P>PROBLEM TO BE SOLVED: To provide a displacement measurement device and a displacement measurement system inexpensively constructible and capable of accurately measuring three-dimensional displacement of an optional point in the ground, for example, only by an optical…
<P>PROBLEM TO BE SOLVED: To provide a system capable of measuring as required the settlement of a construction ground with an optical fiber sensor to solve such problems that in reclamation work especially in the work on the seabed, although the settlement of original…
<P>PROBLEM TO BE SOLVED: To provide a construction management system for enabling each department to effectively use various kinds of a plurality of construction management data according to an occasion. <P>SOLUTION: A construction management system 10 is provided…
PURPOSE:To increase the horizontal resistance of a pile by driving it, on the periphery of it a ground stirring body is installed, in a ground where liquefaction is produced to increase the shear elastic strength of the ground around the pile utilizing the deformation of the…
PROBLEM TO BE SOLVED: To provide an image system for supporting three-dimensional survey for displaying a precise three-dimensional position in survey work by composite reality on a notebook-sized or portable personal computer (herein after referred as a PC) and a stereoscopic…
<P>PROBLEM TO BE SOLVED: To provide a detecting sensor for cutter abrasion of a shield machine, which dispenses with a special transmitter and power supply, is simple in structure, low in cost, small in size, and high in detection accuracy (measuring accuracy) and…
<P>PROBLEM TO BE SOLVED: To provide a method for determining the degree of damage in structures through the use of Acoustic Emission (AE) sound of the secondary cause and determining the degree of damage in the structures by improved b-values acquired on the basis of a…
<P>PROBLEM TO BE SOLVED: To provide a concrete structure diagnostic unit, which is fixed to a concrete structure being an object to be evaluated and arranges an accelerometer for automatically collecting automatic drilling/resistance index information at a fixed reaction…
<P>PROBLEM TO BE SOLVED: To provide a tunnel face surface measuring system for simply, accurately, and inexpensively, performing discontinuous surface detection on the face surface of a tunnel, and the like, and geological boundary detection, and the like, on the face…