<P>PROBLEM TO BE SOLVED: To effectively carry out the work on an exterior wall part by operating a gondola and conveying a material independently from each other. <P>SOLUTION: A gondola 3 is supported in a hanging manner from a temporary supporting frame 2 installed…
Koshihara Kk
PURPOSE: To sandwich and fix a rail by way of preventing flotation by means of holding a head part of the rail by a pair of clamp pieces by fixing the head part of the rail by a pair of clamp or releasing it under pressure by a pair of the clamp pieces by way of vertically…
<P>PROBLEM TO BE SOLVED: To provide a jib crane convertible into a traveling type by removing a support steel tower on the uppermost floor of a skeleton of a structure after used for lifting work as a climbing crane and integrating travel structures into a support base,…
<P>PROBLEM TO BE SOLVED: To prepare a safety device of a lift for construction for the unexpected contingency by preventing dropping off of a conveying unit when tension force applied to a suspension rope of the conveying unit is removed. <P>SOLUTION: Oblong holes 20…
<P>PROBLEM TO BE SOLVED: To prevent danger by quickly stopping the run of a crane when it starts running off along a slope due to brake failure in unexpected situation. <P>SOLUTION: The crane is provided with a travel base 4 movable on a track installed with a gentle…
<P>PROBLEM TO BE SOLVED: To provide a tower crane comprising a climbing means that functions rationally while being reduced in weight without being limited by the shape of a crane mast by constructing a climbing apparatus compactly. <P>SOLUTION: The tower crane has…
PURPOSE:To form the compact structure and prevent the occurrence of biting of a hoisting wire due to the winding under the no-load condition, and to wind a hoisting wire at a high speed without degrading the winding condition even in the case of no-load. CONSTITUTION:A support…
<P>PROBLEM TO BE SOLVED: To provide a jib crane also usable as a traveling low-floor jib crane by converting by removing a support tower at the uppermost floor of a skeleton of a structure and assembling a traveling carriage under the crane body after it is used as a…
<P>PROBLEM TO BE SOLVED: To provide a lift for a self-climbing construction simplified in constitution to rationally and efficiently enforce a replacement work of a material such as a mold at a construction site of a high-rise RC building, for the most part.…
PURPOSE: To organically freely move a crane girder within a wide carrying range of lifting matter, and move it to an optional position without transshipment in the course to perform a cargo handling work. CONSTITUTION: At least one set of two-in-a-set traveling rails 2, 2 fixed…
PROBLEM TO BE SOLVED: To provide a floor crane which can achieve a high lift while assuring a predetermined working radius.SOLUTION: A floor crane 1 is equipped with a carriage 3 movable on a floor 2 so as to perform a lifting work for a load at an arbitrary position on the…
PROBLEM TO BE SOLVED: To efficiently and easily carry out delivery work of a counterweight suspending rope upon extension work of a head. SOLUTION: A carrier 5 is made to rise to an upper part of a steel tower 2 before extension and stop there, a counterweight 10 is installed at…
<P>PROBLEM TO BE SOLVED: To provide a cable guide device capable of miniaturizing the whole structure, reducing its weight, and guiding a cable rationally. <P>SOLUTION: This guide device 10 guides the cable 8 for signal and supplying electric power to equipment in an…
PROBLEM TO BE SOLVED: To provide a construction elevator equipped with reasonable functions such as a bearing function to a structure for rising and falling bearing bodies and a guide function in the case of climbing. SOLUTION: A construction elevator is equipped with liftable…
PROBLEM TO BE SOLVED: To provide a counterweight device for a disassembly type crane free to be disassembled into as small pieces as each of protions on the disassembly type crane, easy to handle and free to rationalize work. SOLUTION: A suspended rail 4a is provided on a rear…
PURPOSE:To provide a jib crane having a boom which is a long part and can be folded simply for its disassembling work in such a manner as to stay within a working radius of a small-size jib crane for the purpose of disassembly by utilizing the own operating function at the time…
PURPOSE:To provide a change-over mechanism for changing the number of wire ropes necessary for the weight of an object to be lifted, in a jib crane. CONSTITUTION:A locking means 15 having locking pawl pieces 16 is provided in a guide part 12 of a hook unit 1. A pulley 22 on…
PROBLEM TO BE SOLVED: To stop a lift without giving shock to a carriage by actuating an engaging mechanism when a carriage rising/falling speed exceeding a set value is sensed by a speed sensor, also actuating a shock absorbing mechanism, and thereby absorbing shocks resulting…
<P>PROBLEM TO BE SOLVED: To provide a lifting/lowering warning device of a counterweight in elevating machines capable of surely preventing such an accident that a worker is caught at lifting and lowering the counter weight without having a disadvantage of pulling a wire…
PURPOSE:To perform simple correction of displacement of two hoist cables through an operation control part even when displacement occurs to a movement amount of a cable, in a crane using the two hoisting cables. CONSTITUTION:In a jib crane having an endless type winder, hoisting…
PROBLEM TO BE SOLVED: To demolish a tower structure such as a smokestack in a relatively easy and extremely efficient manner without being subject to restriction due to its height or making an operator contaminated with dust and dioxin, by utilzing a backhoe and the like, which…
PROBLEM TO BE SOLVED: To provide a climbing method and a climbing device, capable of reducing climbing time.SOLUTION: The climbing device 5 includes: a first lifting support 31 provided on a mast 3 so as to be liftable with a crane body 4; a second lifting support 32 and a third…
PROBLEM TO BE SOLVED: To remove the storage space of a lining material on a ground section, and to rationalize the supply operation of the lining material by automating operation so that the lining material carried in from the outside in the lining- material receiving yard of…
PROBLEM TO BE SOLVED: To provide a support device for the steel tower of a hoisting device that can be attached to the vertical member of the steel tower at a certain position and support the steel tower without being made structurally complex. SOLUTION: This support device for…
PROBLEM TO BE SOLVED: To provide a level luffing jib crane which can be horizontally drawn in and out with high accuracy by eliminating an attached element in a mechanical structural part. SOLUTION: In this jib crane 1, provided with a boom derricking machine 6 operating a boom…