JP 2010222943 A#5134498 Most Cited · 17 citations1.1/yr · PR 5.22ActiveJP · Utility
Connection fitting for wall member and continuous underground wall construction method

<P>PROBLEM TO BE SOLVED: To efficiently perform an upper side recovery operation for an H-steel positioned on the underground upper side by an easy and simple operation. <P>SOLUTION: This connection fitting is used to releasably connect upper and lower stage H-steels…

JP 2001336144 A#19976076 Most Cited · 5 citations0.2/yr · PR 1.73ExpiredJP · Utility
Double structural cured pile with cylindrical steel member inserted therein and construction method therefor

PROBLEM TO BE SOLVED: To provide a composite cured pile having a strong vertical support force and high resistance against horizontal stress such as bending stress or shearing stress and further to provide an economical and efficient construction method of the above composite…

JP 2000319872 A#27869604 Most Cited · 3 citations0.1/yr · PR 1.84ExpiredJP · Utility
Underground intercepting-plate construction method

PROBLEM TO BE SOLVED: To provide an underground intercepting-plate construction method in which high impervious performance is maintained stably even when there is the defective filling of a sealing material or even when external force such as vibrations is applied while an…

JP 2000303452 A#42484308 Most Cited · 2 citations0.1/yr · PR 0.95ExpiredJP · Utility
Method for forming solidified pile

PROBLEM TO BE SOLVED: To construct a solidified pile in which reinforcing members are buried by using one construction machine without decreasing workability and increasing the number of processes. SOLUTION: Soil in a construction place and a liquid hardener are agitated and…

JP 2003027458 A#42191123 Most Cited · 2 citations0.1/yr · PR 0.96ExpiredJP · Utility
Method for soil improvement

PROBLEM TO BE SOLVED: To provide a method for soil improvement, which can reduce the number of created underground consolidated bodies while maintaining accuracy and strength, which are required for the underground consolidated body. SOLUTION: This method comprises: a crossing…

JP 2003027459 A#39559148 Most Cited · 2 citations0.1/yr · PR 1.02ExpiredJP · Utility
Method for soil improvement and device for use in the same

PROBLEM TO BE SOLVED: To provide a method for soil improvement and a device for use in the same, which can simplify process control and process management, can reduce costs, can cope with variations in ground, and can prevent occurrence of an area lacking in a…

JP 2006291702 A#42209726 Most Cited · 2 citations0.1/yr · PR 0.96ActiveJP · Utility
Ground improving device

<P>PROBLEM TO BE SOLVED: To provide a ground improving device capable of simplifying process control/process management, reducing cost, coping with unevenness of the ground, and preventing occurrence of a region causing shortage of a solidifying material.…

JP 2001087732 A#153118101 Most Cited · 0 citations0.0/yr · PR 0.56ExpiredJP · Utility
Impervious sheet for corner part

PROBLEM TO BE SOLVED: To provide an impervious sheet capable of obtaining a sharp corner part. SOLUTION: At least one of a 1st joining part A and a 2nd joining part B is attached at a prescribed angle to the horizontal longitudinal direction of a sheet body 2 and the sharp…

JP 2001087733 A#102288768 Most Cited · 0 citations0.0/yr · PR 0.56ExpiredJP · Utility
Impervious sheet

PROBLEM TO BE SOLVED: To provide an impervious sheet capable of preventing the breaking. SOLUTION: Because a protective sheet 4 is joined to a sheet body 2, there is no fear that the impervious sheet 1 is broken even by being in contact with a projecting material such as rock in…