JP S63308110 A#483760 Most Cited · 71 citations1.9/yr · PR 3.79ExpiredJP · Utility
Measurement of degree of compacting ground

PURPOSE:To judge the degree of compaction of the ground immediately by a method in which a weight is collided with the ground, the impact force and the responding speed of the ground are detected, and the compacting degree of the ground is measured on the basis of the ratio of…

JP H06193058 A#872928 Most Cited · 52 citations1.6/yr · PR 6.51ExpiredJP · Utility
Lap driving confirmation method for compaction pile

PURPOSE:To enable the lap driving of new and old compaction piles to be instantaneously confirmed at a construction stage in laying the piles for connection to each other, using a multiple spindle compaction pile driving machine. CONSTITUTION:When a triaxial compaction pile…

US 4,676,693 A#3535874 Most Cited · 23 citations0.6/yr · PR 1.88ExpiredUS · Utility
Method of confirming position of drain material left and apparatus for confirming same in drain engineering method
Inventors: Hiroshima Toshio, Tamura Mamoru, Sakaizumi MikioAssignee: Kajima Corp S, Fudo Construction CoFiled 1984-11-30 · Granted 1987-06-30

A method and apparatus is provided to embed paper drain material in water-laden soil by means of a mandrel driven into the soil by power means. The paper drain material is intermittently treated with a substance detectable by a signal emitted electronic sensing means secured to…

JP 2005030073 A#3854380 Most Cited · 21 citations1.0/yr · PR 4.91ExpiredJP · Utility
Compaction quality control method

<P>PROBLEM TO BE SOLVED: To highly accurately control a compaction degree of a vast compaction constructing area in real time. <P>SOLUTION: A CCV specified value is determined by inputting a CCV measured value when performing test work execution by a compaction…

JP H08144682 A#4499770 Most Cited · 19 citations0.6/yr · PR 3.74ExpiredJP · Utility
Survey system of tunnel ground

PURPOSE: To increase the survey accuracy, by finding the average drilling speed and rotary pressure from the measured data by a hydraulically driven drill bit and obtaining a converted elastic wave speed from the correlation thereof with the elastic wave speed of the ground.…

JP 2000303466 A#4734041 Most Cited · 18 citations0.7/yr · PR 6.35ExpiredJP · Utility
Earth retaining method
Inventors: Sugiyama KatsuhideAssignee: Fudo Construction CoFiled 1999-04-20

PROBLEM TO BE SOLVED: To narrow a soil improvement scope obtained by earth retaining piles by mixing excavated soil, surplus soil except excavated soil, a hardener, and lightweight material and forming an earth retaining wall having a specified unit volume weight, in the ground…

JP 2000096521 A#5202730 Most Cited · 17 citations0.7/yr · PR 3.90ExpiredJP · Utility
Earthquake-resistant reinforcing construction method for down-stepped bar-arrangement prefabricated wall type pier

PROBLEM TO BE SOLVED: To improve a construction method, in which a prefabricated wall type pier, in which a vertical main reinforcement in a building frame is arranged in a down-stepped manner, is reinforced to resist earthquake with a carbon-fiber sheet. SOLUTION: Carbon-fiber…

JP 2000290993 A#5718931 Most Cited · 16 citations0.6/yr · PR 3.18ExpiredJP · Utility
Method and device for soil mixing process

PROBLEM TO BE SOLVED: To enhance uniform mixing and to enable the amount of solidifying fluid used to be more or less reduced accordingly. SOLUTION: This method for a soil mixing process involves a rotating shaft 1, agitating blades 3A, 3B, a supply line 2 provided along the…

JP 2002327429 A#6029434 Most Cited · 15 citations0.6/yr · PR 5.66ExpiredJP · Utility
Compaction controlling method

PROBLEM TO BE SOLVED: To provide a compaction controlling method capable of controlling the extent of compaction in a wide compaction working area in real-time and with high degree of accuracy. SOLUTION: The compaction controlling method includes a step (S21) dividing the…

JP 2005290869 A#6031772 Most Cited · 15 citations0.7/yr · PR 5.55ExpiredJP · Utility
Reinforcing structure of structure on water

<P>PROBLEM TO BE SOLVED: To provide a reinforcing structure of a structure on the water, which causes no problem even if it is subjected to rescouring. <P>SOLUTION: In this reinforcing structure of the structure 10 on the water, an existing footing 11 is borne on…

JP 2005330712 A#6269789 Most Cited · 15 citations0.7/yr · PR 2.87ExpiredJP · Utility
Classifying device and method

<P>PROBLEM TO BE SOLVED: To provide a slurry classifying device and method comprising a simple structure without lowering dehydration efficiency even under long-term use in classifying/dehydrating slurry containing a solidifying material, by a filter and facilitating…

JP 2002276071 A#6866135 Most Cited · 14 citations0.6/yr · PR 2.72ExpiredJP · Utility
Heat insulating pc concrete panel and its manufacturing method

PROBLEM TO BE SOLVED: To provide a concrete panel with a built-in heat insulating material having simple construction permitting resistance against vertical force due to the deadweight of a the PC panel and horizontal force during an earthquake and causing no dewing, and its…

JP 2004332230 A#6752778 Most Cited · 14 citations0.6/yr · PR 3.18ExpiredJP · Utility
Method for force-feeding fine grain material
Inventors: Otsuka Makoto, Isotani Shuji, Fukada HisashiAssignee: Fudo Construction CoFiled 2003-04-30

<P>PROBLEM TO BE SOLVED: To provide a method for force-feeding a fine grain material, in which the separation of the fine grain material is prevented while a fluid resistance can be lowered and the mixing ratio of a thickener can be reduced when the inside of a ground is…

JP 2005054375 A#6845378 Most Cited · 14 citations0.7/yr · PR 2.80ExpiredJP · Utility
Mixing processing device and method
Inventors: Otsuka Makoto, Isotani ShujiAssignee: Fudo Construction CoFiled 2003-08-05

<P>PROBLEM TO BE SOLVED: To provide a mixing processing device and a method capable of being usefully utilized as a correcting technology when a single shaft member is inclined and as a technology enlarging the degree of the freedom in terms of construction work.…

JP 2005180079 A#6817107 Most Cited · 14 citations0.7/yr · PR 2.90ExpiredJP · Utility
Aseismatic reinforcement structure of construction

<P>PROBLEM TO BE SOLVED: To provide an aseismatic reinforcement structure of a construction which enables cost reduction and shortening of a construction period and is easily executed even at a narrow work site. <P>SOLUTION: In the aseismatic reinforcement structure…

US 5,353,987 A#6725819 Most Cited · 14 citations0.4/yr · PR 3.33ExpiredUS · Utility
Railroad track system having vertically adjustable railroad tie and method of construction therefor
Inventors: Kusakabe Yoshio, Doi ToshiakiAssignee: Fudo Construction Co, Tokai Ryokaku Tetsudo KkFiled 1992-08-11 · Granted 1994-10-11

A railroad track has a roadbed made of concrete and a pair of track beams of precast concrete mounted to the roadbed. Main bodies of the track beams have at the tops thereof a plurality of protrusions serving as ties and a plurality of recesses for receiving adjusting ties. The…

JP 2006225940 A#7312377 Most Cited · 13 citations0.7/yr · PR 3.61ExpiredJP · Utility
Construction method of foundation making lime ground as supporting layer

<P>PROBLEM TO BE SOLVED: To provide a construction method of a foundation structure capable of remarkably reducing a construction scale, a construction period of time and a manufacturing cost by supporting the foundation structure on a lime ground. <P>SOLUTION: A…

JP 2000319865 A#8090863 Most Cited · 12 citations0.5/yr · PR 3.23ExpiredJP · Utility
Soil reinforcing complex method
Inventors: Endo Shigeru, Yamaguchi HirohisaAssignee: Fudo Construction CoFiled 1999-05-11

PROBLEM TO BE SOLVED: To provide a soil reinforcing complex method which is optimum for a support force of the filled ground and for a liquefaction measure, and can reduce the amount of preloading (filling), to thereby contribute to resource saving. SOLUTION: There is provided a…

JP 2001040648 A#8077525 Most Cited · 12 citations0.5/yr · PR 3.30ExpiredJP · Utility
Positioning and guiding system for soil improving machine using gps
Inventors: Deguchi Toshihiro, Katsuhara NorioAssignee: Fudo Construction CoFiled 1999-08-03

PROBLEM TO BE SOLVED: To decrease the number of GPSs to be installed, and to reduce the equipment cost of a system, in which the position of a soil-improvement land- formation device is detected and guided to an aimed position, in a construction method in which mobile stations…

JP H0742494 A#8479503 Most Cited · 12 citations0.4/yr · PR 2.19ExpiredJP · Utility
Segment for lining tunnel

PURPOSE:To obtain a segment for lining a tunnel, which has high strength, high rigidity, and light weight and which facilitates handling. CONSTITUTION:A hollow space 7 is provided in the section of a composite segment 1 composed of steel and cement. The external steel shell…

US 4,487,524 A#8517665 Most Cited · 12 citations0.3/yr · PR 2.11ExpiredUS · Utility
Method and apparatus of forming sand piles for improving a soft ground
Inventors: Shono Masaru, Kawakami Takahiro, Matsumoto Toshiyuki, Tamura Thoru, Matsumoto HidekiAssignee: Fudo Construction CoFiled 1982-09-17 · Granted 1984-12-11

A method for uniformly improving a soft ground is proposed. It includes the steps of driving a pipe into the ground, putting sand thereinto and pulling up the pipe gradually while discharging and compacting the sand. In forming the sand piles, the diameter and/or strength of the…

JP H09183646 A#8765121 Most Cited · 11 citations0.4/yr · PR 6.37ExpiredJP · Utility
Composition for spray mortar

PROBLEM TO BE SOLVED: To produce the subject composition having good spraying performance and cured body performance by incorporating an org. short fiber in a composition obtd. by blending a high performance water reducing agent and a fine aggregate with a cement consisting of a…

JP S5567399 A#9525352 Most Cited · 11 citations0.2/yr · PR 1.93ExpiredJP · Utility
Sludge treatment process for spill water treatment thereof and early dewatering stabilization of dredged sludge
Inventors: Nagamune Kaoru, Tsuru SeiichirouAssignee: Fudo Construction Co, Fudo GikenFiled 1978-11-13

PURPOSE: To treat a great amount of generated effluent water by a most economical and simplified method by discharging water separated from dredged sludge thrown away in a reclaiming site to a predetermined position through a drain pipe provided in the reclaiming site.…

US 3,648,467 A#9082080 Most Cited · 11 citations0.2/yr · PR 2.68ExpiredUS · Utility
Machines for continuously forming sand piles
Inventors: Ogawa MitsuroAssignee: Fudo Construction CoFiled 1970-04-23 · Granted 1972-03-14

A machine for continuously forming sand piles comprises a casing with a hopper connected thereto near its upper end. A vibratory pile driver is mounted at the upper end of the casing above the hopper and a ram is mounted in the casing for undergoing reciprocatory movement…

JP 2002013131 A#10348456 Most Cited · 10 citations0.4/yr · PR 2.21ExpiredJP · Utility
Method and device for ground mixing treatment construction

PROBLEM TO BE SOLVED: To shorten a working time by accelerated penetration, improve uniform mixing, reduce a amount of solidifying fluid matter thereby, and increase an inputted amount of the fluid matter into the in-situ soil. SOLUTION: This method for ground mixing treatment…