PROBLEM TO BE SOLVED: To allow a sampling port to be opened and closed even when the sample to be sampled is soft, to make sampling from a sampling port smooth irrespective of the hardness of the hole bottom of a drilling hole or the circumference ground, and to allow reliable…
Tenox Kk
<P>PROBLEM TO BE SOLVED: To provide a construction method for a road which can be inexpensively constructed in a relatively short construction period, suppresses consolidation settlement caused by a dynamic load in the use of the road constructed on soft ground by filling,…
PROBLEM TO BE SOLVED: To suppress the consolidation settlement of a road by constructing multiple columnar bodies in the soft ground at the length not reaching a bearing stratum and at the improvement factor of a specific ratio, installing a reinforcing net-like body on the…
<P>PROBLEM TO BE SOLVED: To provide a soil cement composite pile with flights which can be used widely as a foundation pile for civil engineering and construction of a structure, since the pile has a large horizontal resistance against a horizontal load on a pile head even…
PURPOSE:To easily and exactly attain construction work by using an auger head provided to the tip of an auger rod, consisting of an excavation blade whose outside diameter is smaller than the inside diameter of a hollow tube, a jet port for a hardener, and a reversely turning…
PURPOSE:To make improved soil affinitive to a lower layer and a side wall excellently by allowing improved soil to permeate in agrid and enhance a ground improvement effect by wrapping improved soil with a geotextile between the lower layer and an upper layer, in which…
PROBLEM TO BE SOLVED: To surely collect a sample in a wide viscosity range from low viscosity to high viscosity and at a prescribed depth by a simple configuration.SOLUTION: An opening 16 for collecting a sample is formed on a side face of a collection cylinder 15, and a slide…
PURPOSE:To promote improvement in kneadability, reduction in power consumption and shortening in drilling time by forming a soil cement composite pile in the lower part of a drilling blade with an auger provided with a small diametral precedence drilling blade. CONSTITUTION:A…
PROBLEM TO BE SOLVED: To prevent a stream of subterranean water from being interrupted while keeping a rational shape with respect to the underground stress and horizontal force by making the lower end depth of one improving body shallower than that of the other improving body…
PURPOSE:To make sheathing work by the use of only a mechanical agitating device by executing the works in the condition that a sheath wall as a consolidation of soil cement pillars made by mechanical agitation and reinforcing core is enwrapped before the outermost improving…
PROBLEM TO BE SOLVED: To provide a stirring/mixing device capable of detecting double rotation of excavated soil in real time. SOLUTION: A stirring/mixing device is equipped with a stirring wing 2 for stirring/mixing excavated soil and hardener by rotating together with a…
PROBLEM TO BE SOLVED: To easily and surely sample an improved soil at a predetermined position as it remains intact without being compressed, even if highly viscose, during sampling the soil in an improved ground, and to quickly sample the improved soil in the state of being not…
PURPOSE:To create a combined foundation formed coninuously with ground solidification, integrally. CONSTITUTION:By mixing hardening material and ground earth with each other, ground improving columns 1, 2 are continuously created to be put together. Besides, the tips of the most…
PROBLEM TO BE SOLVED: To respond to changes in stratum originally not predicted by making the control easier by reducing the control items thereby instantly judging whether good work execution is being performed accurately in the control of foundation improvement. SOLUTION: In…
PROBLEM TO BE SOLVED: To provide a foundation structure for constructing a new building on an existing basement capable of surely transmitting a load of the new building to a foundation slab of an existing building left by breaking up from a column, and easily constructible by a…
<P>PROBLEM TO BE SOLVED: To efficiently perform an upper side recovery operation for an H-steel positioned on the underground upper side by an easy and simple operation. <P>SOLUTION: This connection fitting is used to releasably connect upper and lower stage H-steels…
PROBLEM TO BE SOLVED: To provide a reinforcing structure for an embankment which enhances the strength of an embankment such as an embankment for a track bed or the like and elinimates such a laborious work as conventional ballast and further, which is effective for…
PROBLEM TO BE SOLVED: To allow a hermetically sealed space to exhibit cutoff effect by increasing the whole strength of a steel pipe sheet pile compared with that of the conventional steel pipe sheet pile, to contribute to environment protecting measures by reducing water…
<P>PROBLEM TO BE SOLVED: To provide a method of constructing a soil cement underground continuous wall which is formed with a female joint and a male joint of a sealing panel engaging each other in a non-tight manner without causing defects in a soil cement portion during…
This invention relates to a multi-rods type of ground improvement apparatus to be used in ground improvement work. There are provided plural rods in parallel, excavation blades are mounted to the ends of the rods, the rods are provided with injection openings for a solidifying…
A novel method to construct a reinforcing block in an embankment is provided, wherein a core rod to which a protrusion is molded on the tip, is preset inside a hollow rotating shaft with drilling and agitating blades affixed around its circumference, but with the protrusion on…
PROBLEM TO BE SOLVED: To enable a site representative to collectively perform centralized management for execution control, quality control, labor control, etc., accurately and rapidly in a construction site where a ground improving way using the deep mixing stabilization method…
PURPOSE:To make a soil cement composite pile that is highly reliable and excellent in bearing capacity and is in a diameter larger than that of a hollow pipe driven into earth easily, but certainly without noise and vibration. CONSTITUTION:An auger rod 2, inserted into a hollow…
PURPOSE:To secure opening and closing of a sampling door by comparatively simple constitution at the time of sampling sample soil at specified depth by a sampling device and easily filling a cavity on a passing trace by a drilling shaft and the sampling device at the time of…
PROBLEM TO BE SOLVED: To achieve the shortening of a work period, cost reduction and the enhancement of reliability in ground improving construction by simply and inexpensively performing the evaluation of planning strength of improved soil constructed by a ground improving…