Patents
US 8,418,147 B1#1555264 Most Cited · 38 citations2.9/yr · PR 3.36ActiveUS · Utility
Methods and systems for reporting on build runs in software development
Inventors: Odenwelder Jerry, Holler Robert, Culling Ian, Delwadia Rajiv, Mamut PavelAssignee: Odenwelder Jerry, Holler RobertFiled 2009-05-08 · Granted 2013-04-09

A computer-implemented method of developing software includes receiving successive code changes for a software product. Input is received specifying that one or more code changes involve a work item associated with development of the software product. A plurality of build runs…

US 5,320,313 A#1617470 Most Cited · 37 citations1.2/yr · PR 4.23ExpiredUS · Utility
Pivoting joystick and keyboard support stand
Inventors: Crowe Mark AAssignee: Crowe Mark AFiled 1992-10-29 · Granted 1994-06-14

The invention is a support stand for a joysticks and a keyboard to be used in connection with the joystick. A support base includes a clamping plate and top knobs for securing the base of the apparatus to a planar surface e.g. a desk. A support tray is held in pivotal connection…

US 8,370,803 B1#1712353 Most Cited · 36 citations2.8/yr · PR 2.65ActiveUS · Utility
Asset templates for agile software development
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Versionone Inc, Holler RobertFiled 2008-01-17 · Granted 2013-02-05

A method of creating assets for agile software development includes detecting selection of an asset type for an asset template, receiving values of one or more attributes for the asset template, and creating the asset template. Upon detecting an action to select the asset…

US 8,875,088 B1#2078067 Most Cited · 32 citations2.7/yr · PR 3.24ActiveUS · Utility
Methods and systems for performing project schedule forecasting
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Holler Robert, Culling IanFiled 2009-01-21 · Granted 2014-10-28

A computer-implemented method of performing project schedule forecasting based on stored project data includes receiving a first user input selecting a first plurality of work items in a project. Respective work items of the first plurality have respective work estimates. A…

US 8,561,012 B1#2751245 Most Cited · 27 citations2.1/yr · PR 2.33ActiveUS · Utility
Transitioning between iterations in agile software development
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Holler Robert, Culling IanFiled 2008-10-08 · Granted 2013-10-15

A computer-implemented method of managing work items associated with agile software development includes displaying a first group of incomplete work items associated with a current iteration of an agile software development project. In response to a first user input, a first…

US 8,739,047 B1#2907196 Most Cited · 26 citations2.2/yr · PR 2.78ActiveUS · Utility
Integrated planning environment for agile software development
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Holler Robert, Culling IanFiled 2008-01-17 · Granted 2014-05-27

A method of managing agile software development includes displaying assets associated with an agile software development process. Selection of a first link corresponding to a respective asset of the displayed assets is detected; in response, one or more related assets associated…

US 9,501,751 B1#3288409 Most Cited · 24 citations2.4/yr · PR 2.71ActiveUS · Utility
Virtual interactive taskboard for tracking agile software development
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Holler Robert, Culling IanFiled 2008-04-10 · Granted 2016-11-22

A method of managing tasks during agile software development includes detecting selection of a level in a project hierarchy. In response to said selection of the level, a table is displayed listing a plurality of assets associated with the level and showing tasks associated with…

US 8,701,078 B1#5041546 Most Cited · 18 citations1.5/yr · PR 2.14ActiveUS · Utility
Customized settings for viewing and editing assets in agile software development
Inventors: Holler Robert, Crowe Mark, Delwadia Rajiv, Gilkerson Dan, Mamut PavelAssignee: Holler Robert, Crowe MarkFiled 2008-10-03 · Granted 2014-04-15

A method of managing agile software development includes displaying a group of assets associated with an agile software development process. The group has a particular type and the assets include a first set of attributes selected for display. In response to detecting a request…

US 8,453,067 B1#6498541 Most Cited · 15 citations1.1/yr · PR 1.84ActiveUS · Utility
Multiple display modes for a pane in a graphical user interface
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Holler Robert, Culling IanFiled 2008-10-08 · Granted 2013-05-28

A computer-implemented method of displaying a pane in a user interface includes two display modes. In the first display mode, the pane is displayed in the user interface, wherein display of the pane persists regardless of a position of a pointer icon in the user interface, and…

US 9,690,461 B2#8695511 Most Cited · 12 citations1.3/yr · PR 1.61ActiveUS · Utility
Integrated planning environment for agile software development
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Versionone IncFiled 2014-05-27 · Granted 2017-06-27

Systems and method for presenting and enabling editing of project management data for agile software development are provided. In some implementations, a method includes, in a software development application: identifying a first plurality of assets associated with a software…

US 2013339932 A1#10825940 Most Cited · 10 citations0.8/yr · PR 1.58PendingUS · Application
Methods and Systems for Reporting on Build Runs in Software Development

A method for reporting build runs includes: obtaining code changes for a software product; identifying the code change as affecting a work item of a software product under development, the work item specifies a feature to be added to or a defect to be removed from the software…

US 8,813,040 B2#10816444 Most Cited · 10 citations0.8/yr · PR 1.60ActiveUS · Utility
Methods and systems for reporting on build runs in software development
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Versionone IncFiled 2013-04-08 · Granted 2014-08-19

A method for reporting build runs includes: obtaining code changes for a software product; identifying the code change as affecting a work item of a software product under development, the work item specifies a feature to be added to or a defect to be removed from the software…

US 2016231999 A1#16193556 Most Cited · 7 citations0.7/yr · PR 1.20PendingUS · Application
Transitioning Between Iterations in Agile Software Development

A computer-implemented method of managing work items associated with agile software development includes displaying a first group of incomplete work items associated with a current iteration of an agile software development project. In response to a first user input, a first…

US 2014115557 A1#18789345 Most Cited · 6 citations0.5/yr · PR 1.27PendingUS · Application
Transitioning Between Iterations in Agile Software Development

A computer-implemented method of managing work items associated with agile software development includes displaying a first group of incomplete work items associated with a current iteration of an agile software development project. In response to a first user input, a first…

US 2014331172 A1#17237092 Most Cited · 6 citations0.5/yr · PR 1.80PendingUS · Application
Integrated Planning Environment for Agile Software Development

Systems and method for presenting and enabling editing of project management data for agile software development are provided. In some implementations, a method includes, in a software development application: identifying a first plurality of assets associated with a software…

US 2014359555 A1#18903586 Most Cited · 6 citations0.5/yr · PR 1.18PendingUS · Application
Methods and Systems for Reporting on Build Runs in Software Development

A method for reporting build runs includes: obtaining code changes for a software product; identifying the code change as affecting a work item of a software product under development, the work item specifies a feature to be added to or a defect to be removed from the software…

US 9,129,240 B2#34002944 Most Cited · 3 citations0.3/yr · PR 0.97ActiveUS · Utility
Transitioning between iterations in agile software development
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Versionone IncFiled 2013-10-15 · Granted 2015-09-08

A computer-implemented method of managing work items associated with agile software development includes displaying a first group of incomplete work items associated with a current iteration of an agile software development project. In response to a first user input, a first…

US 2013246966 A1#60347274 Most Cited · 1 citations0.1/yr · PR 0.76PendingUS · Application
Multiple Display Modes for a Pane in a Graphical User Interface

Systems and methods for providing multiple display modes for a pane in a graphical user interface are provided. In some implementations, a computer-implemented method for displaying a pane in a user interface, includes: in a first display mode: displaying the pane in the user…

US 2014223409 A1#51782999 Most Cited · 1 citations0.1/yr · PR 0.84PendingUS · Application
Customized Settings for Viewing and Editing Assets in Agile Software Development

A method includes, in a project management application, identifying a group of software assets being managed using the project management application (the group includes: a first set of attributes and a corresponding first set of values), responsive to a de-selection of an…

US 9,582,135 B2#61824354 Most Cited · 1 citations0.1/yr · PR 0.74ActiveUS · Utility
Multiple display modes for a pane in a graphical user interface
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Versionone IncFiled 2013-05-08 · Granted 2017-02-28

Systems and methods for providing multiple display modes for a pane in a graphical user interface are provided. In some implementations, a computer-implemented method for displaying a pane in a user interface, includes: in a first display mode: displaying the pane in the user…

US 9,858,069 B2#62075403 Most Cited · 1 citations0.1/yr · PR 0.74ActiveUS · Utility
Transitioning between iterations in agile software development
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Versionone IncFiled 2015-09-08 · Granted 2018-01-02

A computer-implemented method of managing work items associated with agile software development includes displaying a first group of incomplete work items associated with a current iteration of an agile software development project. In response to a first user input, a first…

GB 2,546,194 A#140921041 Most Cited · 0 citations0.0/yr · PR 0.56ActiveGB · Utility
Exercise class apparatus and method

Exercise class systems and methods may include a plurality of pieces of exercise equipment and/or a plurality of sensing systems adapted to be worn on people in the class, each piece of equipment or sensing system outputting plural exercise signals relating to exercise…

US 9,292,809 B2#128302366 Most Cited · 0 citations0.0/yr · PR 0.56ActiveUS · Utility
Customized settings for viewing and editing assets in agile software development
Inventors: Holler Robert, Crowe Mark, Delwadia Rajiv, Gilkerson Dan, Mamut PavelAssignee: Versionone IncFiled 2014-04-04 · Granted 2016-03-22

A method includes, in a project management application, identifying a group of software assets being managed using the project management application (the group includes: a first set of attributes and a corresponding first set of values), responsive to a de-selection of an…