Patents
US 9,129,240 B2#34002944 Most CitedActiveUnited States (USPTO)Utility

Transitioning between iterations in agile software development

3Forward Citations (#34002944 Global)
0.3/yrCitation Velocity (#27850149 Global)
0.97Citation PageRank (#43550721 Global)
50Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A computer-implemented method of managing work items associated with agile software development includes displaying a first group of incomplete work items associated with a current iteration of an agile software development project. In response to a first user input, a first incomplete work item of the first group is transferred from the current iteration to a subsequent iteration of the agile software development project. A determination is made that no incomplete work items remain associated with the current iteration. The current iteration is closed and the subsequent iteration is activated.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 3.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer-implemented method of transitioning between iterations of agile software development, wherein agile development management software executed on one or more computers associates work items with iterations, the method comprising: displaying a first group of incomplete work items associated with a current iteration of agile software development; in response to a first user input, transferring a first incomplete work item of the first group from the current iteration to a subsequent iteration of agile software development; in response to a second user input: dividing a second incomplete

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (50)

PatentTitleYearCitations
US 5,544,300 AUser interface for dynamically converting between a single top level window and multiple top level windows199695
US 5,714,971 ASplit bar and input/output window control icons for interactive user interface1998249
US 5,874,958 AMethod and apparatus for accessing information and items across workspaces1999193
US 5,943,053 AMethod and apparatus for expanding and contracting a window panel199995
US 5,956,030 AComputer system with graphical user interface including windows having an identifier within a control region on the display199957
US 6,175,364 B1Framework and method for interfacing a GUI, container with a GUI component200183
US 6,239,798 B1Methods and apparatus for a window access panel2001155
US 2002062367 A1Opportunity tracking information system—78
US 2002089526 A1Infocenter user interface for applets and components—50
US 2002091732 A1Displaying forms and content in a browser—60
US 2003033589 A1System and method for utilization of a command structure representation—44
US 2003046282 A1Managing reusable software assets—160
US 2003061330 A1Web-based collaborative project and process management solution—102
US 2003103079 A1Media resource manager/player—65
US 2003158845 A1Integrated management database—19
US 2003163404 A1Method of evaluating security trading capacity—58
US 2003160815 A1Method and apparatus for accessing information, computer programs and electronic communications across multiple computing devices using a graphical user interface—168
US 2003172020 A1Integrated intellectual asset management system and method—191
US 2003182470 A1Generating reusable software assets from distributed artifacts—59
US 2003182652 A1Software building and deployment system and method—199
US 2003188290 A1Method and system for a quality software management process—110
US 2003204644 A1System and method for developing, deploying, and debugging software agents—55
US 6,694,009 B1Estimation of a work item's wait-time from the present stages of processing of preceding work items200453
US 6,698,013 B1Real time monitoring system for tracking and documenting changes made by programmer's during maintenance or development of computer readable code on a line by line basis and/or by point of focus2004182
US 2004081951 A1Work/training using an electronic infrastructure—75
US 2004186762 A1System for performing collaborative tasks—164
US 2004243457 A1Project estimating system and method—36

Non-Patent Literature (5)

  • Akerman, Using Ontology to Support Development of Software Architectures, 2006, 13 pgs.
  • Ayewah, Evaluating Status Analysis Defect Warnings on Production Software, 2007, 7 pgs.
  • Barton, Reporting Scrum Project Progress to Executive Management Through Metrics, Jan. 2005, 9 pgs.
  • Boehm, A View of 20th and 21st Century Software Engineering, 2006, 18 pgs.
  • Cause, Delivering Real Business Value Using FDD, Winter 2004, 13 pgs.