Patents
Assignee / Organization

Culling Ian

209Total Forward Citations
9Indexed Patents
23Avg Citations / Patent
8Portfolio H-Index
US 8,418,147 B1#1555264 Most Cited · 38 citations2.9/yr · PR 3.36ActiveUS · Utility
Methods and systems for reporting on build runs in software development
Inventors: Odenwelder Jerry, Holler Robert, Culling Ian, Delwadia Rajiv, Mamut PavelAssignee: Odenwelder Jerry, Holler RobertFiled 2009-05-08 · Granted 2013-04-09

A computer-implemented method of developing software includes receiving successive code changes for a software product. Input is received specifying that one or more code changes involve a work item associated with development of the software product. A plurality of build runs…

US 8,370,803 B1#1712353 Most Cited · 36 citations2.8/yr · PR 2.65ActiveUS · Utility
Asset templates for agile software development
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Versionone Inc, Holler RobertFiled 2008-01-17 · Granted 2013-02-05

A method of creating assets for agile software development includes detecting selection of an asset type for an asset template, receiving values of one or more attributes for the asset template, and creating the asset template. Upon detecting an action to select the asset…

US 8,875,088 B1#2078067 Most Cited · 32 citations2.7/yr · PR 3.24ActiveUS · Utility
Methods and systems for performing project schedule forecasting
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Holler Robert, Culling IanFiled 2009-01-21 · Granted 2014-10-28

A computer-implemented method of performing project schedule forecasting based on stored project data includes receiving a first user input selecting a first plurality of work items in a project. Respective work items of the first plurality have respective work estimates. A…

US 8,561,012 B1#2751245 Most Cited · 27 citations2.1/yr · PR 2.33ActiveUS · Utility
Transitioning between iterations in agile software development
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Holler Robert, Culling IanFiled 2008-10-08 · Granted 2013-10-15

A computer-implemented method of managing work items associated with agile software development includes displaying a first group of incomplete work items associated with a current iteration of an agile software development project. In response to a first user input, a first…

US 8,739,047 B1#2907196 Most Cited · 26 citations2.2/yr · PR 2.78ActiveUS · Utility
Integrated planning environment for agile software development
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Holler Robert, Culling IanFiled 2008-01-17 · Granted 2014-05-27

A method of managing agile software development includes displaying assets associated with an agile software development process. Selection of a first link corresponding to a respective asset of the displayed assets is detected; in response, one or more related assets associated…

US 9,501,751 B1#3288409 Most Cited · 24 citations2.4/yr · PR 2.71ActiveUS · Utility
Virtual interactive taskboard for tracking agile software development
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Holler Robert, Culling IanFiled 2008-04-10 · Granted 2016-11-22

A method of managing tasks during agile software development includes detecting selection of a level in a project hierarchy. In response to said selection of the level, a table is displayed listing a plurality of assets associated with the level and showing tasks associated with…

US 8,453,067 B1#6498541 Most Cited · 15 citations1.1/yr · PR 1.84ActiveUS · Utility
Multiple display modes for a pane in a graphical user interface
Inventors: Holler Robert, Culling Ian, Delwadia Rajiv, Mamut Pavel, Crowe MarkAssignee: Holler Robert, Culling IanFiled 2008-10-08 · Granted 2013-05-28

A computer-implemented method of displaying a pane in a user interface includes two display modes. In the first display mode, the pane is displayed in the user interface, wherein display of the pane persists regardless of a position of a pointer icon in the user interface, and…

US 2013339932 A1#10825940 Most Cited · 10 citations0.8/yr · PR 1.58PendingUS · Application
Methods and Systems for Reporting on Build Runs in Software Development

A method for reporting build runs includes: obtaining code changes for a software product; identifying the code change as affecting a work item of a software product under development, the work item specifies a feature to be added to or a defect to be removed from the software…

US 2013246966 A1#60347274 Most Cited · 1 citations0.1/yr · PR 0.76PendingUS · Application
Multiple Display Modes for a Pane in a Graphical User Interface

Systems and methods for providing multiple display modes for a pane in a graphical user interface are provided. In some implementations, a computer-implemented method for displaying a pane in a user interface, includes: in a first display mode: displaying the pane in the user…