PROBLEM TO BE SOLVED: To provide the treating method of a concrete structure, by which an alkali substance is removed at an early stage from the concrete structure after placing and the aging period of concrete can be shortened largely and in which an expensive air cleaner,…
Toda Construction
PROBLEM TO BE SOLVED: To provide a vertically movable bracket scaffold capable of adjusting the height of ledger boards without removing the bracket scaffold from an erection frame. SOLUTION: This bracket scaffold 21 fitted to the studs 23 of the erection frame 29 comprises…
PROBLEM TO BE SOLVED: To provide a shield machine, the cost of which can be reduced and in which a space in the machine can be kept wide. SOLUTION: In the shield machine 1 composed of a ring-shaped outer- circumferential shield 2 and an inner-circumferential shield 3 mounted on…
<P>PROBLEM TO BE SOLVED: To provide a composite underground wall for reducing the wall thickness, and rationalizing underground work even when the wall thickness is determined by in-plane shearing. <P>SOLUTION: In this composite underground wall, a soil cement column…
<P>PROBLEM TO BE SOLVED: To provide a sound insulating structure selecting apparatus, capable of providing presence feeling by considering reflecting sound of a room, and also, realistic feeling by considering influence of a ventilation opening. <P>SOLUTION: The…
PROBLEM TO BE SOLVED: To solve the problem with a conventional noise reducing apparatus, wherein an enlarged speaker diameter prevents approaching to a noise source, regarding the noise reducing apparatus using a reducer.SOLUTION: The noise reducing apparatus 1 emits sound of a…
PROBLEM TO BE SOLVED: To provide a vibration control device of a building, which enhances a vibration control effect by increasing attenuation in comparison with a conventional vibration control device.SOLUTION: A vibration control device of a building includes a wire 6, and an…
PROBLEM TO BE SOLVED: To solve the problem that time and labor is required and a nurse forgets to sterilize hands and fingers in emergency situations because the nurse restore a representative corridor light by oneself in a conventional method for restoring the nurse call…
PROBLEM TO BE SOLVED: To provide a beam joint jig for automatic work in iron frame construction capable of saving labor of construction workers in beam joint work in a conventional iron frame construction.SOLUTION: The beam joint jig for automatic work in iron frame construction…
PROBLEM TO BE SOLVED: To survey even a natural ground of which pore wall is prone to collapse, directly acquire a situation of the natural ground, and perform survey by simple work.SOLUTION: The geological survey method in front of a tunnel working face, includes: in a process…
To provide a communication system by a waveguide antenna that reliably transmits monitoring information or the like on construction site with a simple configuration to a monitoring center or the like, can be freely attached and detached, and is repeatedly usable.SOLUTION: A…
To ensure traveling safety of a vehicle, and improve the efficiency of construction.SOLUTION: An invert pier 1 includes a vehicle traveling portion 2 on which a vehicle travels, and a pair of left and right leg portions 3 provided on a lower side of the vehicle traveling portion…
To provide a working face evaluation apparatus that collects and analyzes a hitting sound generated by hitting a working surface and improves an evaluation accuracy of a stability in the working face based on a dispersion degree of a frequency distribution of a sound pressure of…
To provide a joint structure of a steel shell element that can sufficiently accommodate construction errors of the steel shell element, makes it difficult for adjacent steel shell elements to be separated from each other, and prevents deformation of the steel shell…
To make it easy to connect corner portions of temporary handrails, to eliminate the need for curing, and to prevent workers from being injured at the corner portions.SOLUTION: There provided is a corner joint 2 used to connect corner portions of a temporary handrail 1, in which…
To provide an ultra-high-strength reinforced concrete segment which is more economical than conventional strength concrete segments and composite segments, is rich in durability, and is suitable for high-speed construction by applying ultra-high-strength concrete.SOLUTION: In an…
To provide a fireproof structure or the like which is excellent in workability and fire resistance performance.SOLUTION: A fireproof structure 1 has a lath sheet 11, a reinforcing member 12, a sprayed rock wool RW, and the like. The lath sheet 11 is fixed below the reinforcing…
PURPOSE:To improve the efficiency of execution of a work by a method wherein a target mounted to an automatic slinging device for a pillar intended to be driven is irradiated with laser beams from the lower end of a pillar member, and perpendicularity of a pillar steel frame is…
PURPOSE:To eliminate damage from wind to a building and, at the same time, to utilize energy of the wind. CONSTITUTION:Openings 2, 3, 4 and 5 are provided to the surface of a wall of a lower floor or a middle floor of a building 1 and, at the same time, openings 8a and 8b are…
PURPOSE:To provide a method wherein a floor indicating button to indicate each floor is provided in the vicinity of the inlet of an elevator and arrival to a target floor is practicable through one action through which an elevator is stopped to an indication floor in response to…
PURPOSE:To prevent destruction of nature, by providing an escalator with pallets on the inclined surface of a hill or a mountain, on each of which pallets a vehicle is placed and is horizontally kept while being raised or lowered on the inclined surface. CONSTITUTION:On the flat…
PURPOSE:To facilitate the connection in a panel zone by providing a connecting panel on the top end of a steel beam having a long span, inserting a cross beam to the horizontal insert part of the connecting panel, and inserting a counter beam to a cut groove. CONSTITUTION:Hollow…
PURPOSE:To confirm leakage and conduct cut-off easily and give sufficient strength at the time of the penetration of shield segments even in shield excavation. CONSTITUTION:A reinforcing iron plate 20, to which a piping 22 for cut-off combining the confirmation of leakage, which…
PURPOSE: To perform excavation and the fabrication of lining material abreast with each other by connecting a front body provided with a cutter device, and a rear body from which a shaft provided with an erector device and a reaction supporting frame projects backward, to each…
PURPOSE: To prevent the water leakage to the inside of a room without making partial loss of area in an underground beam. CONSTITUTION: A draining runner 10 is provided to the lower end of a form 16 to place a concrete wall 14. After the solidification of the concrete wall 14,…