PROBLEM TO BE SOLVED: To allow a hermetically sealed space to exhibit cutoff effect by increasing the whole strength of a steel pipe sheet pile compared with that of the conventional steel pipe sheet pile, to contribute to environment protecting measures by reducing water…
Data Tou Kk
<P>PROBLEM TO BE SOLVED: To increase the strength of a steel pipe sheet pile compared with a conventional steel pipe sheet pile and as a result to exhibit a cut-off effect of a closed space, to reduce water quality pollution caused by cut-off works and to increase an…
<P>PROBLEM TO BE SOLVED: To increase the whole strength as a steel pipe sheet pile compared with a conventional steel pipe sheet pile, which results in exhibiting the cut-off effect of a closed space, reducing water quality pollution caused by cut-off works and increasing…
<P>PROBLEM TO BE SOLVED: To provide a steel pipe sheet pile, a steel pipe sheet pile wall, a steel pipe for a pipe roof and the pipe roof, for providing higher yield strength in a joint part, while restraining an increase of cost. <P>SOLUTION: This steel pipe sheet…
<P>PROBLEM TO BE SOLVED: To provide a pipe roof, an excavating device and a pipe roof method improving workability by smoothly jacking joint parts into the ground, not to mention steel pipes constituting the pipe roof. <P>SOLUTION: In the pipe roof used in a pipe…
<P>PROBLEM TO BE SOLVED: To provide a construction method for a shaft, which enables safety and rapid construction, which enables simple construction without the need for an auxiliary construction method for grout etc., and which can bring about the shaft with high…
<P>PROBLEM TO BE SOLVED: To provide a pipe roof capable of sufficiently coping with deviation when jacking a roof pipe and ensuring reliability in strength. <P>SOLUTION: In a pipe roof construction method of lining up roof pipes and inserting them in the natural…
<P>PROBLEM TO BE SOLVED: To establish high bearing capacity and horizontal resistance, increase economical effects and contribute to environmental protection by preventing water pollution and facilitating installation even in foundation work under a special underwater…
PROBLEM TO BE SOLVED: To efficiently and accurately build up a steel pipe sheet pile to be used for a steel pipe sheet pile method for disposing a joint 3 having a slit 2 extended in a longitudinal direction on the side face of a steel pipe sheet pile main pipe 1, and for…
PROBLEM TO BE SOLVED: To provide a method for constructing a steel pipe sheet pile foundation such that a steel pipe sheet pile provided with a male joint and a female joint of H steel as joints is used as a steel pipe sheet pile to have larger joint strength than a conventional…
PROBLEM TO BE SOLVED: To provide a non-excavation drain pipe burying method that may be executed readily in an urban area or a road with a heavy traffic at a low cost, at the same time facilitating maintenance and management.SOLUTION: A starting shaft 1 and an arrival shaft 2…
PROBLEM TO BE SOLVED: To provide a method and apparatus for erecting a low-strength pipe in which the low-strength pipe such as a polyvinyl chloride pipe or a thin steel pipe can be buried simultaneously with excavation without applying a rotational force or a compression force…
<P>PROBLEM TO BE SOLVED: To provide a chuck technology suitable for the case where a connected steel pipe 6 constituted by integrally welding two parallel steel pipes 5a to each other via H-shaped steel 6b is used as a pile. <P>SOLUTION: A line, which connects the…
<P>PROBLEM TO BE SOLVED: To provide a steel pipe for a pipe roof, which enables the two steel pipes to be connected together at an optional spacing, which enables a reduction in construction cost and the shortening of a construction period by virtue of a reduction in the…
<P>PROBLEM TO BE SOLVED: To provide a continuous steel-pipe earth retaining construction method being capable of being built by a construction machine for a steel pipe having a small bore, in which a technique is established, inhibiting the generation of an industrial…
<P>PROBLEM TO BE SOLVED: To provide a pipe-roof construction method and a steel pipe for the pipe-roof construction method which can reduce the number of steel pipes to be inserted, which can be inserted by two at a time, which do not disturb a periphery, which can…
PROBLEM TO BE SOLVED: To reduce labor and shorten the term of works because a plurality of steel-pipe-sheet piles can be set at a time while lowering resistance in the case of the pitching of the piles by joint sections and improving cutoff properties because the number of…
<P>PROBLEM TO BE SOLVED: To provide a steel sheet pile capable of improving sealability of joint loose joint and preventing the rigid force from deteriorating. <P>SOLUTION: In the steel pipe sheet pile 1 in which a joint mutual steel pipes 2 are connected to both…
PROBLEM TO BE SOLVED: To dissolve inconvenience of a conventional example, to smoothly embed a drainage material inside a casing together with a head just by single drilling by simultaneously erecting the casing and disposing the drainage material, to allow acceleration and cost…
To provide a double sheath pipe for drain pipe installation capable of being easily pulled out to a departure shaft side while preventing soil from penetrating a space between a drain pipe and itself when excavation of an arrival shaft is impossible.SOLUTION: A double sheath…
PROBLEM TO BE SOLVED: To provide a non-excavation drain pipe burying method that may be executed readily in an urban area or a road with a heavy traffic at a low cost, at the same time facilitating maintenance and management.SOLUTION: A starting shaft 1 and an arrival shaft 2…