<P>PROBLEM TO BE SOLVED: To reduce construction periods, and to improve execution precision by easily measuring sections, and evaluating and managing excavation sections and lining sections without complicating work in tunnel excavation constructions. <P>SOLUTION: An…
Sooki Kk
<P>PROBLEM TO BE SOLVED: To reduce construction periods, and to improve execution precision by easily measuring sections, and evaluating and managing excavation sections and lining sections without complicating work in tunnel excavation constructions. <P>SOLUTION: A…
PROBLEM TO BE SOLVED: To provide a crack displacement measuring system suited for measuring the displacement of cracks of concrete structure such as tunnels and bridges, at a relatively low price.SOLUTION: This crack displacement measuring system comprises: a plurality of sensor…
<P>PROBLEM TO BE SOLVED: To provide a method and an apparatus for measuring the rebound amount and penetration amount of a pile, which secure safety without depending on manual measurement, and which enable long-distance measurement from a land side. <P>SOLUTION: In…
<P>PROBLEM TO BE SOLVED: To provide a simply structured wall surface degradation diagnostic system, diagnosing a wall surface of a building with a high accuracy and greatly reducing a time and labor required for processing diagnostic results in a simple system…
<P>PROBLEM TO BE SOLVED: To provide an asphalt finisher which enables the management and control of height of a construction finished surface, using a pavement material, to be simply and accurately performed by a simple constitution. <P>SOLUTION: A reflector 11 is…
PROBLEM TO BE SOLVED: To provide a method for smoothly guiding a support to a prescribed position and improving position accuracy of support building-up while improving work efficiency of the support building-up.SOLUTION: A tunnel support guiding and building method is for…
PROBLEM TO BE SOLVED: To provide an inner space displacement measurement method that finds tunnel inner space displacement at countless points, and is improved in measurement precision.SOLUTION: The inner space displacement measurement method includes: attaching a target to a…
PROBLEM TO BE SOLVED: To provide a tunnel construction method which can suppress tunnel construction cost.SOLUTION: A tunnel construction method comprises the steps of: irradiating a first irradiation point (P) on a face plane by laser irradiation of a total station (20);…
<P>PROBLEM TO BE SOLVED: To guide the placement of an inclined pile, to confirm a location, and to manage the placement based on image information and survey information. <P>SOLUTION: This inclined pile placement management method uses at least two survey apparatuses…
PROBLEM TO BE SOLVED: To provide a tunnel construction information projection method capable of increasing an information amount to be displayed on a face surface when constructing a tunnel and largely contributing to the support of tunnel construction.SOLUTION: By using a…
PROBLEM TO BE SOLVED: To provide a tunnel construction information projection system capable of increasing the amount of information displayed a cutting face during construction of a tunnel and capable of largely contributing to supporting of the construction of the…
<P>PROBLEM TO BE SOLVED: To provide a three-dimensional image photographic function added to total station provided, using motor drive functions. <P>SOLUTION: In this imaging system, at least two imaging means, for outputting image information, are arranged with a…
PROBLEM TO BE SOLVED: To provide an installation device of an underwater structure capable of accurately guiding and installing an underwater structure.SOLUTION: The installation device of an underwater structure includes: a plurality of total stations 2A, 2B and 2C having an…
<P>PROBLEM TO BE SOLVED: To provide a support erection method by which the support can be erected with excellent accuracy. <P>SOLUTION: When a support 1 is erected at a support erection position, a right material 1A and a left material 1B of the support 1 are…
PROBLEM TO BE SOLVED: To display an outbreak, a scaling amount, positions thereof, to be got easily and accurately, based on an observed result of an excavation wall face, at the time of tunnel excavation work, to easily evaluate and manage the excavation wall face, without…
<P>PROBLEM TO BE SOLVED: To manipulate the direction of collimation, while confirming an image in the collimation direction of a surveying device, even if no operators are arranged at a point where the surveying device is installed. <P>SOLUTION: The surveying device…
PROBLEM TO BE SOLVED: To provide a method and system for inspection which identifies whether an object has a defect, such as, for example, a connection failure, a cavity, or the like, at a connection interface in a structure or molding formed by joining dissimilar materials…
PROBLEM TO BE SOLVED: To provide a surveying device capable of efficiently realizing highly precise surveying, and suitable to be used for a pipe jacking method. SOLUTION: This surveying device S is provided with a device main body 10 arranged so as to be freely revolvable in a…
<P>PROBLEM TO BE SOLVED: To provide a measuring method of duct line having small bore diameter with that offers no visibility and makes entering of workers difficult. <P>SOLUTION: An imaging means for the imaging forward side is provided in the base point of a…
<P>PROBLEM TO BE SOLVED: To provide a device and a method for allowing an operator at a separate place to confirm an image in the direction of collimation of the surveying device by viewing a display, or the like without disposing the operator at a place where the…
PROBLEM TO BE SOLVED: To measure the exact displacement amount even when the position of a laser ranging means shifts from the last position, when the displacement amount such as settlement or the like of a road surface is measured using the laser ranging means.SOLUTION: In this…
PROBLEM TO BE SOLVED: To provide a tunnel construction management system that provides support so that primary invert construction can safely be carried out near a face.SOLUTION: The tunnel construction management system comprises: face data acquiring means for acquiring, by…
PROBLEM TO BE SOLVED: To provide a rotary steel pipe driving construction management system capable of measuring information on a steel pipe and capable of storing and managing the information.SOLUTION: A rotary steel pipe driving construction management system of the invention,…
<P>PROBLEM TO BE SOLVED: To prevent displacement of a target image even if a propulsion pipe is rolled. <P>SOLUTION: A measuring device 16 installed on the propulsion pipe 12 connected to a propulsion machine 10 for transferring information on an included angle θi…