PROBLEM TO BE SOLVED: To shorten the term of works by taking exterior-wall PCa slab construction works into the cycle of rise skeleton works, to ensure safety without the installation of a safety net or the like while works can be reduced by also eliminating the need for the…
Kajima Corp
PROBLEM TO BE SOLVED: To lightly open/close a vertical sheet door which is vertically folded and elevated/lowered by using constant load springs, by which a person enters and comes out at a prescribed position in the lower part of a roll-in fireproof sheet shutter. SOLUTION: A…
PROBLEM TO BE SOLVED: To provide an external wall capable of corresponding to crack to ensure and maintain the water stop property satisfactorily, providing acid resis tance and excellent durability and providing excellent construction property and reducing construction cost.…
PROBLEM TO BE SOLVED: To provide a magnetic shielding direct-current power facility with reduced magnetic flux density around it. SOLUTION: Specified portions of the go cable 1 from and the return cable 2 to the direct-current power facility are placed in proximity to each other…
PROBLEM TO BE SOLVED: To provide a filler for coating capable of attaining homogeneous flatting effect with little addition, a method for manufacturing the same and a coating containing the filler. SOLUTION: The filler for coating is constituted with waterworks-sludge powder…
<P>PROBLEM TO BE SOLVED: To provide a sound level adjustment system 21 wherein sound volume adjustment of a talker and sound volume adjustment of a loudspeaking sound with respect to a dark noise are optimally performed to enhance the articulation of a reproduction sound.…
<P>PROBLEM TO BE SOLVED: To provide a method of surely oscillating an S wave inside any one of the ground surface or a boring hole. <P>SOLUTION: An oscillator 1 with a pressure-fit part 5, mounted on a rod 9 projected from a vibrator 3, is put in the boring hole 23…
<P>PROBLEM TO BE SOLVED: To provide a method for constructing an underwater structure capable of being installed even on the uneven bottom of the water, without forming a gap between the underwater structure and the bottom of the water, in the installation of the…
<P>PROBLEM TO BE SOLVED: To provide a truss composite floor slab which is easy for handling during storage or transportation or the like, and is ready for assembling after being carried in the site. <P>SOLUTION: The truss composite floor slab includes a PCa floor…
PROBLEM TO BE SOLVED: To ensure structure safety compatibly with shortening a construction period by performing integral construction of a structure, facilities and finishing for completing work from disassembly to new installation within an extremely short period by…
PROBLEM TO BE SOLVED: To provide a concrete placement system capable of suitably placing concrete underwater.SOLUTION: The concrete placement system 1 includes: a concrete transferring pump 7; piping for concrete placement 9; shutter valves 21, 23; a pressure measurement unit…
PROBLEM TO BE SOLVED: To provide a ventilation system and a ventilation method that enable reduction in a carbon dioxide concentration in an activity space regardless of a state of outside air and reduction in ventilation frequency in a conventional ventilation method.SOLUTION:…
PROBLEM TO BE SOLVED: To provide a ground strength determination method that enables quantitative assessment of a declined amount of the ground strength after excavation, along with a tunnel excavation method that utilizes the determination method.SOLUTION: In a ground strength…
To provide a technique capable of surely discharging bentonite into a drilling hole without leaving an organic impurity in the drilling hole and blocking the drilling hole.SOLUTION: A backfilling method of a drilling hole for backfilling a drilling hole using bentonite comprises…
To provide a sensor module that protects a power supply unit and a communication unit against an external factor such as water, a pressure and the like.SOLUTION: A sensor module 3 comprises: an electric type sensor 3d; a power supply unit 3b that converts light received from an…
PURPOSE:To expand the function of water collection by a method in which a fitting part is thrust from the back side to the drain hole of a concrete structure and a draining face is projectionally provided almost horizontally to the back face. CONSTITUTION:A back-fill and…
PURPOSE:To save labor during build-up of a die frame at a job site, by sing a cylindrical die frame formed from a corrugated hollow panel which can facilitate curving and drilling. CONSTITUTION:The inside space of a hollow panel 4 made of a polymer compound such as…
PURPOSE:To display not only current weather status but also its future tendency by providing an operation control device for calculating, rain-fall status, etc., and weather tendency intruding the output of a rain-fall meter, a barometer etc. CONSTITUTION:Outdoor rain-fall meter…
PURPOSE:To shorten the term of work by using art expanded metal with a reinforcement as the skeleton member of the wall and roof of a pegion house and binding the peripheral reinforcement of the skeleton member for the wall and the intermediate reinforcement of the skeleton…
PURPOSE:To reduce the amount of reinforcing bars, and to enhance economical efficiency by controlling the occurrence of cracks of concrete in a base plate wall. CONSTITUTION:Induced joints 5 are provided to a base plate 3 at several places in the circumferential direction by…
PURPOSE: To surely hold the proper stress transfer state to a bearing body from a PC steel wire and enhance the quality of the whole anchor part. CONSTITUTION: In order to make sure of perpendicularity between a bearing body 3 and a PC steel wire 2, a binding grip 4 of the PC…
PROBLEM TO BE SOLVED: To provide an earthquake resistant element capable of simultaneously yielding all beams in the same layer to suppress the radical increase of layer deformation attributed to the standardization of members when a structure having equal span or story height…
PROBLEM TO BE SOLVED: To prevent the separation and fall of a segment by locating the segment and a reinforcing cage formed of main reinforcements, then providing a tie reinforcement with one end formed in semicircular shape and with the other end formed in L-shape, across an…
PROBLEM TO BE SOLVED: To raise in the air at the load pick up place of a truck, not requiring a hang change by providing a gate shape framework for running on a rail in a shape striding the load pick up space of a truck and providing a hang up device on the horizontal beam of…
PURPOSE: An apparatus for cutting large-diametered pipes piled into the water or ground, said apparatus being capable of performing the cutting operation reliably even when the steel pipes to be cut are not of a true circle or even when the cutter has bit into the pipe wall due…