Penta Ocean Construction
PROBLEM TO BE SOLVED: To simplify a device, and reduce manufacturing costs by picking up the images of a plurality of points of measurement on a slip form with cameras provided at points with known three-dimensional coordinates on a floating dock and computing their…
PROBLEM TO BE SOLVED: To solve the problem of impossibility of accurately grasping the position of a moving body in the case the moving body under satellite positioning gets into a satellite positioning disabled area. SOLUTION: In this moving body positioning method and device…
<P>PROBLEM TO BE SOLVED: To provide a decontamination method of contaminated soil at the original position which enhances the decontamination efficiency of contaminated soil in cooperation with a soil washing system in decontamination equipment. <P>SOLUTION: A…
<P>PROBLEM TO BE SOLVED: To provide a ground improvement construction method by injection of chemicals, capable of further effectively preventing liquefaction, even by the quantity of chemical to be used smaller than an inter-soil void, in the ground improvement…
<P>PROBLEM TO BE SOLVED: To obtain a cutter-bit loading gate mechanism of a shield machine, which can reduce costs because it is structurally simple, and which has no problem associated with a space. <P>SOLUTION: This cutter-bit loading gate mechanism comprises a…
<P>PROBLEM TO BE SOLVED: To provide a method capable of efficiently performing the working at lower cost than before when dismantling an underwater concrete structure. <P>SOLUTION: An elevating/lowering stage 2 which is elevated from the level below the water surface…
<P>PROBLEM TO BE SOLVED: To provide a portable cone penetration test device usable as simply as a portable cone penetration test device on the ground and enabling easy ground investigation when investigating the sea bottom ground. <P>SOLUTION: The portable cone…
PROBLEM TO BE SOLVED: To provide a method of injecting grout which can prevent the quality of the grout from being lowered due to the injection thereof, in water, into the gap between a foundation pile and a part to be mounted, which can reduce a construction period, and which…
PROBLEM TO BE SOLVED: To solve the problem that a conventional ship for separating dredged sediment makes working efficiency low due to much labor spent for work of separation of a mixture.SOLUTION: The ship 1 for separating the dredged sediment includes a barge which has a part…
PROBLEM TO BE SOLVED: To provide a simplified earth-retaining fence capable of preventing sediment outflow and muddy water outflow from a soil dump yard, and of being inexpensively constructed in a short period.SOLUTION: A simplified earth-retaining fence 1 which is installed on…
PROBLEM TO BE SOLVED: To provide a gravity type pier structure capable of obtaining large slide resistance force in an earthquake even when weight applied onto a bottom slab is light.SOLUTION: The gravity type pier structure comprises a gravity type revetment structure A…
PROBLEM TO BE SOLVED: To provide fluidization treatment soil without requiring a large-scale exclusive plant, by indicating a proper flow value, without becoming excessively strong in strength after hardening while having separation resistance performance.SOLUTION: Fluidization…
PROBLEM TO BE SOLVED: To detect an object left on a road surface.SOLUTION: An object detection system (100) comprises: a sensor (903) that is attached to a vehicle (900) and repeatedly measures a distance from an attaching position to a road surface with a predetermined width as…
PROBLEM TO BE SOLVED: To provide a water leak measuring device that can accurately detect water leaks occurring not only through a horizontal face but even through a curved or upright face and moreover measure the quantities of leaking water, and a water leak measuring method…
PROBLEM TO BE SOLVED: To provide a wooden rigid-frame structure which achieves rigid junction of a column-beam framework as a junction structure, and eliminates looseness of a junction and facilitates recovery of deformation even when the framework is distorted by earthquake or…
To provide a pile head treatment method capable of reliably performing horizontal breaking and small-piece crushing of a pile head extra-fill part by kinetic crushing almost at the same time.SOLUTION: In a pile head treatment method for head treating a cast-in-place concrete…
To provide an underwater sound generating system that can generate a louder underwater sound and efficiently control actions of fishes, and to provide a method for generating an underwater sound and a method for controlling actions of fishes using the underwater sound generating…
PURPOSE:To improve the charge rate of fill sand by providing a drain port larger than the diameter of a return pipe and a flared portion having the diameter larger than the return pipe on the end thereof to connect the flared side end to the drain port. CONSTITUTION:A caisson…
PURPOSE:To improve the excavating efficiency by providing a driving means for giving the angular reciprocating movement around an axial line to an excavating means so that an excavating part draws a circular locus around of an axial line extending to the direction of the…
PURPOSE:To enable the use of a sludge fixed bed and to achieve the shortening of a treatment time and the enhancement of efficiency in a batchwise sewage treatment method using an activated sludge. CONSTITUTION:A sludge fixed bed 7 is provided in a batchwise biological reaction…
PURPOSE:To construct an earth retaining wall by breaking the sheet of a steel pipe sheet pile, extracting an inside filler, exposing the inside of a connection section, connecting the connecting section of the next sheet pile, and erecting it in a pit. CONSTITUTION:The angle 5…
PURPOSE: To place floor board efficiently by lifting floor board as inclined in longitudinal direction, then passing it between beams for board placement from under to over, and then returning it to horizontal position and lowering it onto beams. CONSTITUTION: Floor board 10 is…
PURPOSE: To improve productivity by inserting reinforcing bars into hollow portion disposed in longitudinal direction in a cement extrusion forming place and then filling filler material. CONSTITUTION: A cement extrusion forming plate 10 having rectangular, plural hollow…
PROBLEM TO BE SOLVED: To enable the joining with high precision by obtaining lap width of waterproof sheet accurately. SOLUTION: According to this join method of waterproof sheet, open ends of a plurality of waterproof sheet which are provided and spread like a cylinder on outer…