PROBLEM TO BE SOLVED: To lengthen the length of an anchor skeleton for obtaining a greater tensile strength. SOLUTION: At the tip of a hollow excavation rod 1, a pair of right and left excavation bits 8, 8 are provided, which are able to rotate from the smallest position…
Nittoc Construction
PROBLEM TO BE SOLVED: To provide a method for producing water-permeable cellular mortar having excellent flowability, excellent early strength and excellent underwater non-separability by kneading an early strength underwater non-separable mortar material comprising a superquick…
<P>PROBLEM TO BE SOLVED: To mount an existing anchor having its head part being not threaded without requiring special jack and attachment and affecting already provided tension force greatly and to replace it easily. <P>SOLUTION: A joint sleeve is provided in an…
<P>PROBLEM TO BE SOLVED: To provide a construction method for a double tube digging small diameter pile using a hole excavating rod by simplifying a construction process of a root pile and a high yield strength micropile by an original technology using the hole excavating…
<P>PROBLEM TO BE SOLVED: To provide a method and an apparatus for measuring stress by an overcoring type stress analysis method allowing measurement of time-varying changes even during overcoring by using a lightweight, compact commercially available core drill apparatus.…
PROBLEM TO BE SOLVED: To enable cement to surely drive onto the inclined surface even when cement content is reduced and exhibit impervious performance over a long period even when crack occurs by mixing a fiber into an impervious structural material. SOLUTION: An impervious…
<P>PROBLEM TO BE SOLVED: To provide a reinforcing structure of a structure on the water, which causes no problem even if it is subjected to rescouring. <P>SOLUTION: In this reinforcing structure of the structure 10 on the water, an existing footing 11 is borne on…
<P>PROBLEM TO BE SOLVED: To realize the purpose of enhancing work efficiency at the time of load measurement, re-tensing thereafter, and re-fixation, and enhancing the reliability of the work, without being followed by structure complication, etc. <P>SOLUTION:…
<P>PROBLEM TO BE SOLVED: To provide a method and a device for determining a ground and cracking when boring is performed by a hydraulic down-the-hole hammer which can develop the advantages of the boring by using the hydraulic down-the-hole hammer in which a ground is…
<P>PROBLEM TO BE SOLVED: To provide an aseismatic reinforcement structure of a construction which enables cost reduction and shortening of a construction period and is easily executed even at a narrow work site. <P>SOLUTION: In the aseismatic reinforcement structure…
<P>PROBLEM TO BE SOLVED: To provide a ground grouting method and an injection pipe device capable of preventing the difficulty of injection by making a boring wall collapse to bury a columnar space when the injection pipe is slantly horizontal or curved to insert it into…
PROBLEM TO BE SOLVED: To easily insert and dispose a beam main reinforcement between the main reinforcements of a cage without moving the position of the beam main reinforcement or without bending or cutting the thick main reinforcement of the cage, and position the cage with…
PROBLEM TO BE SOLVED: To provide a cage capable of eliminating direct welding for installing a main reinforcement and a reinforcement or hoop reinforcement by using a welding machine and providing a specified strength without impairing the strength of the cage by integrating…
<P>PROBLEM TO BE SOLVED: To provide a construction method of a foundation structure capable of remarkably reducing a construction scale, a construction period of time and a manufacturing cost by supporting the foundation structure on a lime ground. <P>SOLUTION: A…
<P>PROBLEM TO BE SOLVED: To provide a large columnar penetration source for chemicals, ensure large discharge amount, make a large improved body at a time in a short time to improve construction property, and perform economically excellent construction. <P>SOLUTION:…
<P>PROBLEM TO BE SOLVED: To inject grout into a place, based on a plan, in ground through a permeable hole wall retaining material with an upper part, partially subjected to impermeable working, in such a manner that the more grout is injected into a lower part.…
PROBLEM TO BE SOLVED: To provide a reinforcement body and a reinforcement structure of a concrete structure, capable of efficiently reinforcing the concrete structure which is difficult to reconstruct.SOLUTION: A reinforcement body 2 of the concrete structure (dam body C of a…
PROBLEM TO BE SOLVED: To provide a grouting device which can inject a grouting material uniformly with respect to a horizontal direction in an area to be subjected to injection of the grouting material and which can continuously inject the grouting material in a vertical…
PURPOSE:To make it possible to observe a slime-moving state with the eye after the excavation of a bore hole bored in a horizontal direction or in a slant and downward direction or in a vertical and downward direction and, at the same time, to enable the measurement of a…
PURPOSE: To provide a low-cost test piece in which the same temperature history as that of an actual structure is received simply in a clear shape without using a large-scale machine. CONSTITUTION: The space 1 having the same sectional size as that of a concrete structure is…
PROBLEM TO BE SOLVED: To attain satisfactory greening, enhance stability by preventing a foundation material for vegetation from flow out with a water flow and a wave, and enhance a sight by making a nursery stock raising-seedling in a position separated from an objective…
PROBLEM TO BE SOLVED: To provide a straining method for a load-distributed anchor, which facilitates control of tension load, facilitates setting of a correcting quantity, and improves the flexibility of design of the anchor, and to provide a tensioning jig. SOLUTION:…
<P>PROBLEM TO BE SOLVED: To provide a revetment structure which can secure a landscape such as 'bank' with age by virtue of protection using an earth structure, in which plants can be well rooted, which can enhance corrosion resistance, which can be protected from…
<P>PROBLEM TO BE SOLVED: To provide a device for a high pressure jet ejection mixing treatment method capable of shortening overbreak at the time of guide hole drilling without increasing a hardener injection volume, realizing reducion of drilling time and cost, making use…
<P>PROBLEM TO BE SOLVED: To provide a cement composition having excellent bleeding resistance, which exhibits good flowability when it is applied with shearing force during pump pressure-feeding or the like, but has high thixotropic property (dripping preventing property)…