Controlling resource allocation with automated consumption against a work breakdown structure
Abstract
A computer system displays a user interface display with a user input mechanism that can be actuated in order to identify a set of resources, and corresponding capacities. A team configuration is stored in memory and reflects the configuration of the resources and corresponding capacities that were identified. A task dependency structure is obtained, and is indicative of an underlying project. Resources from the stored team configuration, and corresponding capacities, are assigned to the tasks in the task dependency structure and the team configuration is updated, in memory, to reflect the assignments. A display is generated that shows the state of the underlying memory, and that is indicative of a remaining capacity and a consumed capacity.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 30 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computing system, comprising: a processor; and memory storing instructions executable by the processor, wherein the instructions configure the computing system to: access a resource pool record in memory based on a user request; based on an indication of a resource capacity allocation user input, automatically select a resource allocation criterion; generate a resource capacity allocation in the resource pool record based on the selected resource allocation criterion; modify the resource pool record to include the resource capacity allocation; and generate a representation of a user interfac
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 11,068,812 B2 | Work instruction system | 2021 | 1 |
| US 2017308842 A1 | Work instruction system | — | 5 |
References Cited — Backward Prior Art (30)
Non-Patent Literature (5)
- "How to Allocate Resources in Microsoft Project", Published on: Nov. 6, 2011 Available at www.wikihow.com/Allocate-Resources-in-Microsoft-Project.
- "Managing Resources", Retrieved at >gantto.com/support/documentation/managing-resources>>, Retrieved Date: Mar. 28, 2012, pp. 5.
- "Oracle Primavera P6 Project Management", Retrieved at <docs.oracle.com/cd/E16281-01/Product-Manuals/PMRefMan.pdf>>, Feb. 13, 2013, pp. 560.
- "Worker resource scheduling in Microsoft Dynamics AX 2012 R3", May 28, 2014, Retrieved from the Internet: URL: microsoft.com/en-us/download/details.aspx?id=43112, retrieved on Jan. 26, 2016, 12 pages.
- “Oracle Primavera P6 Project Management”, Retrieved at <docs.oracle.com/cd/E16281—01/Product—Manuals/PMRefMan.pdf>>, Feb. 13, 2013, pp. 560.