Enterprise project management system and method therefor

30Forward Citations (#2321685 Global)
2.1/yrCitation Velocity (#1801300 Global)
2.50Citation PageRank (#10156679 Global)
48Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A project management system uses a work breakdown structure to define the project tasks. The work breakdown structure is organized as set of hierarchical related project tasks. The work breakdown structure can be loaded in part from a template. A calendar breakdown structure defines events associated with project resources. The calendar breakdown structure is defined on departmental basis. A resource breakdown structure defines available resources. The resource breakdown structure includes personnel and tools. The allocation of available resources to the project tasks is optimized within the constraints of the work breakdown structure and calendar breakdown structure. A histogram of project demand versus available resources is generated. The histogram of project demand versus available resources is used to optimize resource allocation.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 48 · Forward citations: 30.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer implemented method of project management, comprising: retrieving project tasks from a database using a distributed computer network, each project task having a cost center, account number, job identification (ID), description, type, work duration, start time, and priority, each project task describing an activity to be performed by available resources, the available resources including personnel, equipment, parts and tools; displaying the project tasks using a user interface, the user interface allowing a user to create a work breakdown structure of dependencies between the project

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • Carbno, Collin. "Optimal Resource Allocation for Projects." Project Management Journal 30.2 (1999): 22. Business Source Complete.
  • L Douglas Smith, Robert M Nauss, Ashok Subramanian, & Ron Beck. (2004). Decision Support for Staffing, Outsourcing and Project Scheduling in MIS Strategic Plans. Infor, 42(1), 79-100.
  • Nesi, P.. (1998). Managing OO projects better. IEEE Software, 15(4), 50-60.
  • Phillips, Patricia G. (2004). A framework for staffing e-commerce projects in a dynamic business environment. D.Sc. dissertation, Robert Morris University, United States-Pennsylvania.
  • Phillips, Patricia G. (2004). A framework for staffing e-commerce projects in a dynamic business environment. D.Sc. dissertation, Robert Morris University, United States—Pennsylvania.