US 7,212,987 B2#620972 Most CitedExpiredUnited States (USPTO)Utility

System and method for planning a design project, coordinating project resources and tools and monitoring project progress

62Forward Citations (#620972 Global)
3.3/yrCitation Velocity (#741350 Global)
9.72Citation PageRank (#1112766 Global)
27Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method and structure for coordinating resources to complete a design project prioritizes tasks to create a project plan, automatically notifies resources of task responsibilities and associated due dates based on the project plan through the use of encryption keys, controls access to the design data through the use of the encryption keys assigned to the resources, automatically monitors work being performed on tasks through a computerized network, and automatically notifies a project team leader of task completion status, overdue tasks, and tasks being ignored, based on the monitoring.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 27 · Forward citations: 62.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of coordinating resources to complete a design project, said method comprising: identifying tasks, comprising at least a first task and a second task, that must be finished to complete said design project based on design data; receiving information about said tasks that must be finished in order to complete said design project, wherein said information comprises, for each one of said tasks, an appropriate resource, a data source, at least one design tool and a duration; prioritizing said tasks based on dependency between said tasks to create a design project plan, wherein said first t

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • Automated Project Management Application Brings Exciting New Technology to CRE Managers Business Wire, Mar. 3, 1999.
  • Bertino E. et al., A Flexible Model Supporting the Specification and Enforcement of Role-based Authorizations in Workflow Management Systems, ACM Workshop of Role Based Access Control, 1997.
  • Decmyn, Dominique, Novell unveils products in e-commerce push Computerworld, Feb. 14, 2000, vol. 34, No. 7.
  • Eloranta, Eero et al., Improved project management through improved document management Computers in Industry, 2001, vol. 45, pp. 231-243.
  • GoProject Web Site Jun. 2000, notes.pmla.com, Retrieved from Archive.org Jul. 28, 2006.