Controlling non-process of record (POR) process limiting yield (PLY) inspection work
Abstract
A method of controlling a quantity of non-process of record (POR) process limiting yield (PLY) inspections in wafer processing includes setting aside planned capacity for non-POR work, upon receipt of a request for non-POR work, estimating a time required for completion of the request and comparing the estimated time against a remainder of the set aside planned capacity, approving the request in an event the comparison indicates that the estimated time is available in the set aside planned capacity and rejecting the request in an event the comparison indicates that the estimated time is not available in the set aside planned capacity.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 21 · Forward citations: 0.
Claims (2 — 2 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of controlling a quantity of non-process of record (POR) process limiting yield (PLY) inspections in wafer processing, the method comprising: in an event that POR work is scheduled as wafer starts for inspection by inspection tools, setting aside planned capacity of the inspection tools for non-POR work characterized as having no wafer start schedule; upon receipt of a request for non-POR work, estimating a time required for completion of the request and comparing the estimated time against a remainder of the set aside planned capacity; approving the request in an event the comparison
- Claim 2Independent Claim
The metho
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗