US 7,647,130 B2#21805911 Most CitedActiveUnited States (USPTO)Utility

Real-time predictive time-to-completion for variable configure-to-order manufacturing

5Forward Citations (#21805911 Global)
0.3/yrCitation Velocity (#25269075 Global)
1.32Citation PageRank (#27872810 Global)
25Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Predicting a completion time for the manufacturing of an ordered configuration of a product based on actual completion times and self adjusting prediction completion times. An order is received to manufacture a particular configuration of a product. Multiple activities are identified that need to be finished in order to complete the manufacturing of the configuration. A completion time that the configuration will be manufactured is predicted based on actual completion times and self-adjusting predicted completion times for the activities.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 25 · Forward citations: 5.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method in a computer system for predicting a completion time for manufacturing a particular configuration of a product, the method comprising: receiving, at a data processing system, an order to manufacture the configuration of the product; identifying, by a processing unit of the data processing system, a plurality of activities that must be finished in order to completely manufacture the configuration, wherein each activity in the plurality of activities has one or more associated rules for calculating a predicted cycle time for an activity; calculating, by the processing unit, an initial

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (25)

PatentTitleYearCitations
US 5,231,567 AManufacturing planning system1993131
US 5,307,260 AOrder entry apparatus for automatic estimation and its method199439
US 5,479,343 AProduction planning system199589
US 5,586,021 AMethod and system for production planning1996130
US 6,434,443 B1Method for performing dynamic re-scheduling of fabrication plant200256
US 6,564,113 B1Lot start agent that calculates virtual WIP time in a multi-product and multi-bottleneck manufacturing environment200368
US 6,611,727 B2Method and system for simulating production within a manufacturing environment200328
US 2004019398 A1Manufacturing optimization and synchronization process—4
US 6,731,990 B1Predicting values of a series of data200458
US 6,748,287 B1Adaptive real-time work-in-progress tracking, prediction, and optimization system for a semiconductor supply chain200487
US 2004230479 A1Display system—6
US 2004243457 A1Project estimating system and method—36
US 2005107902 A1Method and system for efficient order processing in a manufacturing environment—8
US 2005159828 A1Generic framework for porting legacy process automation assets to a new control system—25
US 2005234758 A1Task progress management method, task progress management device and program—37
US 2005246043 A1Manufacturing optimization and synchronization process—4
US 2006004618 A1Explaining task scheduling for a project—55
US 2006031840 A1Real time monitoring manufacturing scheduling and control—31
US 7,035,815 B1Method and apparatus for computer system online lead time advisor200649
US 7,054,704 B2Method, system and facility for controlling resource allocation within a manufacturing environment200618
US 2006116778 A1On-line statistical process control information system and method—12
US 2006167736 A1Schedule chart for project management—39
US 7,113,915 B1System for scheduling and monitoring a project200633
US 7,139,720 B1Project planning system and method for accommodating AD HOC requests within a fixed core development cycle200642
US 7,218,980 B1Prediction based optimization of a semiconductor supply chain using an adaptive real time work-in-progress tracking system200761