Real-time predictive time-to-completion for variable configure-to-order manufacturing
Abstract
Predicting a completion time for the manufacturing of an ordered configuration of a product based on actual completion times and self adjusting prediction completion times. An order is received to manufacture a particular configuration of a product. Multiple activities are identified that need to be finished in order to complete the manufacturing of the configuration. A completion time that the configuration will be manufactured is predicted based on actual completion times and self-adjusting predicted completion times for the activities.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 25 · Forward citations: 5.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method in a computer system for predicting a completion time for manufacturing a particular configuration of a product, the method comprising: receiving, at a data processing system, an order to manufacture the configuration of the product; identifying, by a processing unit of the data processing system, a plurality of activities that must be finished in order to completely manufacture the configuration, wherein each activity in the plurality of activities has one or more associated rules for calculating a predicted cycle time for an activity; calculating, by the processing unit, an initial
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗