Method for projecting build progression for a product in a manufacturing environment
Abstract
A computer implemented method is used for determining a product build schedule for sequential fabrication steps. The computer implemented method comprises: receiving a routing of the sequential fabrication steps; assigning a raw process time to a fabrication step in the routing; generating a cycle time for the fabrication step; receiving a start date for the sequential fabrication steps; and computing a projected shipping date for the product.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 18 · Forward citations: 1.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A computer implemented method for determining a product build schedule for sequential fabrication steps, said computer implemented method comprising: receiving a routing of said sequential fabrication steps; assigning a raw process time to a fabrication step in said routing; generating a cycle time for said fabrication step; assigning a cycle time multiplier to said fabrication step; receiving a start date for said sequential fabrication steps; and computing a projected shipping date for said product.
- Claim 2Depends on #1
The computer implemented method as recited in claim 1 , wherein said product comprises a production part.
- Claim 3Depends on #1
The computer implemented method as recited in claim 1 , wherein said product comprises a prototype part.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 8,666,529 B2 | Controlling non-process of record (POR) process limiting yield (PLY) inspection work | 2014 | 0 |
References Cited — Backward Prior Art (18)
Non-Patent Literature (4)
- "Kicking Semiconductor Production up a Notch" Invensys Hotlinks (Summer 2003) pp. 45ff.
- "Micrel Semiconductor Increases Productivity, Enhances Customer Service and Creates Smooth Production Flow with Wongerware's InTrack MES Software" Invensys Wonderware (2003).
- Detlef Pabst, et al. "Deterministic Scheduling of Wafer Fab Operations" Brooks Worldwide Automation Symposium (2003) pp. 1-10.
- Karen A. Pitts "Discrete-event simulation of wafer fabrication facility" Proceedings of the 188 Winter Simulation Conference (1988) pp. 712ff.