Patents
US 7,369,914 B2#61281389 Most CitedActiveUnited States (USPTO)Utility

Method for projecting build progression for a product in a manufacturing environment

1Forward Citations (#61281389 Global)
0.1/yrCitation Velocity (#53009971 Global)
0.75Citation PageRank (#61281389 Global)
18Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A computer implemented method is used for determining a product build schedule for sequential fabrication steps. The computer implemented method comprises: receiving a routing of the sequential fabrication steps; assigning a raw process time to a fabrication step in the routing; generating a cycle time for the fabrication step; receiving a start date for the sequential fabrication steps; and computing a projected shipping date for the product.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 18 · Forward citations: 1.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A computer implemented method for determining a product build schedule for sequential fabrication steps, said computer implemented method comprising: receiving a routing of said sequential fabrication steps; assigning a raw process time to a fabrication step in said routing; generating a cycle time for said fabrication step; assigning a cycle time multiplier to said fabrication step; receiving a start date for said sequential fabrication steps; and computing a projected shipping date for said product.

  2. Claim 2Depends on #1

    The computer implemented method as recited in claim 1 , wherein said product comprises a production part.

  3. Claim 3Depends on #1

    The computer implemented method as recited in claim 1 , wherein said product comprises a prototype part.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (1 of 1 total)

References Cited — Backward Prior Art (18)

PatentTitleYearCitations
JP H01109059 AProduction controller—4
JP H04347769 AProcess management device—7
JP H06203042 AProduction line plan generating method—19
JP H07153815 AManufacturing system of semiconductor device—6
US 5,444,632 AApparatus and method for controlling and scheduling processing machines1995128
US 5,521,828 AUnit and method for setup-change instruction and the production system199610
US 5,586,021 AMethod and system for production planning1996130
US 5,745,364 AMethod of producing semiconductor wafer199828
US 5,801,945 AScheduling method for robotic manufacturing processes199878
US 6,128,588 AIntegrated wafer fab time standard (machine tact) database2000119
US 6,134,482 AMethod and apparatus for controlling semiconductor wafer fabrication equipment based on a remaining process time applicable to the processors200074
JP 2001209421 AMethod to estimate lot processing completion time for semi-conductor manufacturing equipment—8
US 6,351,686 B1Semiconductor device manufacturing apparatus and control method thereof200241
US 6,463,350 B2Production system for manufacturing semiconductor devices by lot200214
US 6,496,747 B1Semiconductor device manufacturing apparatus and information processing system therefor200221
US 6,748,287 B1Adaptive real-time work-in-progress tracking, prediction, and optimization system for a semiconductor supply chain200487
US 6,839,601 B1Fabrication architecture including enterprise resource planning integration200535
US 6,856,848 B2Method and apparatus for controlling progress of product processing200511

Non-Patent Literature (4)

  • "Kicking Semiconductor Production up a Notch" Invensys Hotlinks (Summer 2003) pp. 45ff.
  • "Micrel Semiconductor Increases Productivity, Enhances Customer Service and Creates Smooth Production Flow with Wongerware's InTrack MES Software" Invensys Wonderware (2003).
  • Detlef Pabst, et al. "Deterministic Scheduling of Wafer Fab Operations" Brooks Worldwide Automation Symposium (2003) pp. 1-10.
  • Karen A. Pitts "Discrete-event simulation of wafer fabrication facility" Proceedings of the 188 Winter Simulation Conference (1988) pp. 712ff.