Advanced planning system

5Forward Citations (#22469629 Global)
0.4/yrCitation Velocity (#19429794 Global)
1.09Citation PageRank (#37043581 Global)
29Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A production planning system for allocating production capacity to meet a demand includes an operational module and a simulating module. The operational module is for receiving demand inputs, calculating a consolidated demand based on the demand inputs, calculating and storing a production capacity, and creating a production plan. The simulating module includes a data retriever, a simulated data handler, and a simulating planner. The data retriever is for retrieving and storing consolidated demand and capacity data from the at least one operational processor. The simulated data handler is for receiving a simulated demand input and creating a simulated consolidated demand by adding the simulated demand input to the retrieved consolidated demand. The simulating planner is for creating a simulated production plan based on the simulated consolidated demand.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 29 · Forward citations: 5.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A production planning system for allocating production capacity to meet a demand, the production planning system comprising: an operational processor configured to receive demand inputs, calculate a consolidated demand based on the demand inputs, calculate and store a production capacity, and create an operational production plan by allocating production capacity to meet the consolidated demand based on the consolidated demand and the production capacity, wherein the demand inputs include temporal requirement data that sets a deadline by which the demand input must be produced; and a simulatin

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (29)

PatentTitleYearCitations
US 4,887,218 AAutomated production release system198989
JP H0964510 AProduction system and production scheduling method for printed circuit board—4
US 5,943,484 AAdvanced material requirements planning in microelectronics manufacturing1999114
US 6,141,598 AVehicle assembly line control system and method200063
US 2002082893 A1Delivery system and method for vehicles and the like—126
US 6,415,266 B1Dynamic instruction system for input of parts in vehicle production line200227
US 2003149608 A1Suite of configurable supply chain infrastructure modules for deploying collaborative e-manufacturing solutions—102
US 2003177050 A1System and method for order group planning with attribute based planning—42
US 2005052352 A1Method and system of classifying demand data—7
US 6,889,106 B2Master production scheduling management system and method200516
US 6,898,472 B2System and method for order group planning with attribute based planning200585
US 6,920,365 B2System and method for pull-in order planning and control20059
US 2006074778 A1Apparatus and method for process managing—23
US 7,035,704 B2Capacity management system and method20068
US 2006224263 A1Production system and production method—6
US 7,123,976 B2Capacity management system and method20062
US 7,130,707 B2System and method for manufacturing planning and control200614
US 7,142,937 B1Capacity management in a wafer fabrication plant20067
US 7,200,389 B2Dynamic interface software for wireless communication devices200712
US 2008033586 A1Planning production for complementary demands—4
US 2008154660 A1Generating Planning-Level Time and Capacity Requirement Formulas for Manufacturing Processes—42
US 7,406,359 B2Method for calculating a transition preference value between first and second manufacturing object attributes20084
US 7,409,356 B1Method and system for intelligent supply chain collaboration200844
US 7,499,766 B2Associated systems and methods for improving planning, scheduling, and supply chain management200965
US 2009157458 A1Supply chain evaluation system, method, and program—16

Non-Patent Literature (1)

  • Musselman et al., THe role simulation in advanced planning and scheduling, 2002, Winter simulation Conference, pp. 1825-1830.