Patents
US 7,130,707 B2#7135035 Most CitedExpiredUnited States (USPTO)Utility

System and method for manufacturing planning and control

14Forward Citations (#7135035 Global)
0.7/yrCitation Velocity (#10960374 Global)
1.71Citation PageRank (#18699816 Global)
4Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

A customer-orientated manufacturing planning and controlling system. An order management module is programmed to receive an order for a product and reserve a capacity for the order based on a capacity model that considers a plurality of capacity vectors in a production system. A plan engine generates a fixed production schedule for the order based on the capacity model. A priority management engine provides a priority for the order. A production schedule monitor and evaluation module determines whether the order in process conforms to the fixed production schedule by statistical process control (SPC) and whether to adjust the fixed production schedule and to adjust the priority based on a dynamic achievement model of historical fixed production schedules, based on historical production information in a production database storing production information of the production system.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 14.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A computer implemented system for manufacturing planning in a production system, comprising: a capacity model, considering a plurality of capacity vectors in the production system; an order management module to receive an order for a product and reserve a capacity for the order based on the capacity model; a plan engine to generate a fixed production schedule for the order based on the capacity model; and a production schedule monitor and evaluation module to determine whether the order in process conforms to the fixed production schedule and whether to adjust the fixed production schedule whe

  2. Claim 2Depends on #1

    The system as claimed in claim 1 , wherein the production system is an integrated circuit (IC) fo

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗