Capacity management system and method
Abstract
A capacity management system and method. The system includes a demand management module and a planning engine. The demand management module receives a demand comprising a request for a quantity of a device and a corresponding required date. The planning engine converts original planning buckets with varying bucket lengths into target planning buckets that have substantially identical bucket lengths. The planning engine further retrieves a cycle time of the device, and selects one of the target planning buckets accordingly. The planning engine also plans a capacity in the selected target planning bucket according to the quantity of the device.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A manufacturing system comprising: a capacity management system, the capacity management system further comprising: a demand management module configured to receive at least one demand, the demand comprising a request for a quantity of a device and a required date corresponding to the request; and a planning engine configured to convert original planning buckets having varying bucket lengths into target planning buckets having substantially identical bucket lengths, retrieve a cycle time and a route of the device, select one of the target planning buckets according to the cycle time, the requi
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 8,326,447 B2 | Advanced planning system | 2012 | 6 |
| US 8,666,516 B2 | Advanced planning system | 2014 | 5 |