Automated management of development project files over a network
Abstract
A technique is provided for managing a project schedule for a development project based on the aggregation of individual task schedules, where the individual task schedules are updated based on inspection results from two or more inspectors specified to inspect a project task product. The schedules, and consequently the updates thereof, are governed by a policy specifying that a task cannot be partially completed. The inspection results are linked to the individual task schedules, which are linked to the associated project schedule. Another technique is provided for managing project files over a network. Acceptance of a project proposal triggers the creation of individual sites for each individual specified to contribute to the project, where individual task schedules and draft project files can be linked to the individual site. The individual sites are linked to a project site and associated file directories are created and also linked to the project site.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 31 · Forward citations: 7.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computer-implemented method for managing project files over a network comprising the steps of: receiving project initiation information that comprises a description of a project and of one or more individuals performing a project task; and upon approval of the project, a computer performing the steps of: storing in a database the initiation information to indicate that the project is approved, wherein the initiation information is accessible over the network from a project site; automatically creating a directory of project files that are associated with the project; storing the directory of
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (7 of 7 total)
References Cited — Backward Prior Art (31)
Non-Patent Literature (5)
- Angermeier, George, "Cooperative Project Management with RPLAN", XP-002345614, Copyright Projekt Magazin, Oct. 2002 edition, 6 pages.
- Buchbinder et al., "Oracle Project Management, Release 11i", XP-002345049, Oracle, User guide, part No. B10895-02, May 2004, 354 pages.
- Christenberry, J. Reid, et al., "Project and Employee Time Tracking-For Information Systems and Technology", dated Nov. 14, 1996, Georgia University, 17 pages.
- Claims, Foreign application No. 07109677.0-1238, 3 pages.
- Edwards "Project Management With the PC", Oct. 1984, PC Magazine, v3, n21, pp. 109-117, Dialog file 275, Accession No. 01103603.