Graphical top-down planning system

0Forward Citations (#106425552 Global)
0.0/yrCitation Velocity (#106425552 Global)
0.56Citation PageRank (#106425552 Global)
50Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A system is provided that visually represents a planning structure. The system displays a node that represents an element of the planning structure and a value associated with the element within a user interface. The system further receives a first user interaction that is a movement of a cursor over the node in a direction. The system further generates child elements within the planning structure in response to the first user interaction, where the child elements are children of the element. The system further generates values associated with the child elements, where a combination of the values is equal to the original value. The system further displays child nodes that represent the child elements and the values within the user interface. The system further displays lines between the node and the child nodes, where each line represents a parent-child relationship.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A non-transitory computer-readable medium having instructions stored thereon that, when executed by a processor, cause the processor to visually represent a planning structure, the representing comprising: displaying a first node that represents a first element of the planning structure and a first value associated with the first element within a user interface, wherein the first node comprises a first outline; receiving a first user interaction that comprises a movement of a cursor over the first node in a first direction; generating a second element and a third element within the planning st

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (50)

PatentTitleYearCitations
WO 9,416,397 A2Method of enterprise-wide to do list scheduling—12
US 5,737,728 ASystem for resource assignment and scheduling1998271
US 5,745,110 AMethod and apparatus for arranging and displaying task schedule information in a calendar view format1998221
EP 1,026,609 A2Method of and apparatus for displaying a schedule on a computer display—9
WO 0,118,683 A2Resource-based task scheduling system and method—13
US 6,211,856 B1Graphical user interface touch screen with an auto zoom feature2001414
US 2003038831 A1Timeline display apparatus—92
US 2003061266 A1Project workflow system—134
US 6,707,903 B2Automated workflow method for assigning work items to resources200468
WO 2004/102431 A1A system for scheduling at least one task having a plurality of activities to be performed by one or more users of the system—51
US 2005149370 A1Project mapping—25
US 6,920,632 B2Dynamic multilevel task management method and apparatus200534
US 2005165631 A1Time management representations and automation for allocating time to projects and meetings within an online calendaring system—127
US 2005198103 A1System and method of commitment management—73
US 2006004618 A1Explaining task scheduling for a project—55
US 7,092,929 B1Method and apparatus for planning analysis2006314
US 2007073575 A1Progress management system—52
US 2007150327 A1Project management method and system—112
US 2007233534 A1Project management system and method—57
US 2007245300 A1Apparatus, system, and method for presenting project scheduling information in combination with workflow information—156
US 2008103871 A1Company project management system—33
US 2008126114 A1System and method for project management of land development—7
US 2008155433 A1Zooming task management—11
US 7,406,432 B1Project management over a network with automated task schedule update200850
US 2008221946 A1Method and system for evaluating and summarizing weekly project progress—52
WO 2009/055425 A1Method for automatically developing suggested optimal work schedules from unsorted group and individual task lists—8
US 7,536,313 B2Automated management of development project files over a network20097
US 2009133027 A1Systems and Methods for Project Management Task Prioritization—48
US 2009198540 A1Method and system for determining an execution sequence of a set of sales orders—11
US 2009234699 A1User Interface For Scheduling Resource Assignments—56

Non-Patent Literature (5)

  • Agata Czarnigowska, "Earned value method as a tool for project control", Budownictwo i Architektura 3 (2008) 15-32, http://yadda.icm.edu.pl/baztech/element/bwmeta1.element.baztech-article-BPL6-0014-0070/c/httpwibis-pollub-plfilesplikikonferencje32.pdf, last downloaded Mar. 5, 2014.
  • Agata Czarnigowska, “Earned value method as a tool for project control”, Budownictwo i Architektura 3 (2008) 15-32, http://yadda.icm.edu.pl/baztech/element/bwmeta1.element.baztech-article-BPL6-0014-0070/c/httpwibis—pollub—plfilesplikikonferencje32.pdf, last downloaded Mar. 5, 2014.
  • Anant Shree Agrawal, "Task Prioritization Rules for Project Execution", (IJERA) ISSN: 2248-9622, vol. 2, Issue 4, Jul.-Aug. 2012, pp. 1208-1212, http://www.ijera.com/papers/Vol2-issue4/GT2412081212.pdf, last downloaded Mar. 5, 2014.
  • Anant Shree Agrawal, “Task Prioritization Rules for Project Execution”, (IJERA) ISSN: 2248-9622, vol. 2, Issue 4, Jul.-Aug. 2012, pp. 1208-1212, http://www.ijera.com/papers/Vol2—issue4/GT2412081212.pdf, last downloaded Mar. 5, 2014.
  • Andy Carmichael, Ph.D.,CEng, FBCS, "Planning by Priority, How to prioritize project tasks to maximize delivered business benefits", Ivis Technologies, Issue 2.0, Scheduling Projects Reference 3, http://www.openxprocess.com/whitepapers/Planning%20By%20Priority%20-04-.pdf, last downloaded Mar. 5, 2014