Automatic variable zooming system for a project plan timeline

1Forward Citations (#61280273 Global)
0.1/yrCitation Velocity (#46375991 Global)
0.75Citation PageRank (#61280273 Global)
50Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A system is provided that performs automatic variable zooming. The system displays a project plan timeline within a user interface, where a project plan timeline includes one or more tasks and a timeline includes one or more time units. The system further receives an instruction to invoke automatic variable zooming on the displayed project plan timeline. The system further receives a criteria. The system further calculates one or more scores for the one or more time units of the project plan timeline based on the criteria. The system further adjusts a zoom level for one or more portions of the project plan timeline based on the one or more calculated scores.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 1.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A non-transitory computer-readable medium having instructions stored thereon that, when executed by a processor, cause the processor to provide automatic variable zooming, the zooming comprising: displaying a project plan timeline within a user interface, wherein a project plan timeline comprises one or more tasks and a timeline comprising one or more time units; receiving an instruction to invoke automatic variable zooming on the displayed project plan timeline; receiving a criteria; calculating one or more scores for the one or more time units of the project plan timeline based on the criter

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (1 of 1 total)

References Cited — Backward Prior Art (50)

PatentTitleYearCitations
WO 9,416,397 A2Method of enterprise-wide to do list scheduling—12
US 5,737,728 ASystem for resource assignment and scheduling1998271
US 5,745,110 AMethod and apparatus for arranging and displaying task schedule information in a calendar view format1998221
EP 1,026,609 A2Method of and apparatus for displaying a schedule on a computer display—9
WO 0,118,683 A2Resource-based task scheduling system and method—13
US 6,211,856 B1Graphical user interface touch screen with an auto zoom feature2001414
US 2003038831 A1Timeline display apparatus—92
US 2003061266 A1Project workflow system—134
US 6,707,903 B2Automated workflow method for assigning work items to resources200468
WO 2004/102431 A1A system for scheduling at least one task having a plurality of activities to be performed by one or more users of the system—51
US 2005149370 A1Project mapping—25
US 6,920,632 B2Dynamic multilevel task management method and apparatus200534
US 2005165631 A1Time management representations and automation for allocating time to projects and meetings within an online calendaring system—127
US 2005198103 A1System and method of commitment management—73
US 2006004618 A1Explaining task scheduling for a project—55
US 2006085322 A1Internet-based method for construction bid and contract management—84
US 7,092,929 B1Method and apparatus for planning analysis2006314
US 2007073575 A1Progress management system—52
US 2007150327 A1Project management method and system—112
US 2007233534 A1Project management system and method—57
US 2007245300 A1Apparatus, system, and method for presenting project scheduling information in combination with workflow information—156
US 2008103871 A1Company project management system—33
US 2008126114 A1System and method for project management of land development—7
US 2008155433 A1Zooming task management—11
US 7,406,432 B1Project management over a network with automated task schedule update200850
US 2008221946 A1Method and system for evaluating and summarizing weekly project progress—52
US 2009006156 A1Associating a granting matrix with an analytic platform—313
US 2009018996 A1Cross-category view of a dataset using an analytic platform—813
WO 2009/055425 A1Method for automatically developing suggested optimal work schedules from unsorted group and individual task lists—8

Non-Patent Literature (5)

  • Agata Czarnigowska, "Earned value method as a tool for project control", Budownictwo i Architektura 3 (2008) 15-32, http://yadda.icm.edu.pl/baztech/element/bwmeta1.element.baztech-article-BPL6-0014-0070/c/httpwibis-pollub-plfilesplikikonferencje32.pdf, last downloaded Mar. 5, 2014.
  • Anant Shree Agrawal, "Task Prioritization Rules for Project Execution", (IJERA) ISSN: 2248-9622, vol. 2, Issue 4, Jul.-Aug. 2012, pp. 1208-1212, http://www.ijera.com/papers/Vol2-issue4/GT2412081212.pdf, last downloaded Mar. 5, 2014.
  • Andy Carmichael, Ph.D.,CEng, FBCS, "Planning by Priority, How to prioritize project tasks to maximize delivered business benefits", Ivis Technologies, Issue 2.0, Scheduling Projects Reference 3, http://www.openxprocess.com/whitepapers/Planning%20By%20Priority%20-04-.pdf, last downloaded Mar. 5, 2014
  • Asana Guide, The path to doing great things, "Sorting & Filtering", https://asana.com/guide/projects/sorting, last downloaded Mar. 5, 2014.
  • Bonnie Biafore, "Fast-track tasks to shorten your project schedule-Project-Office.com", http://office.microsoft.com/en-in/project-help/fast-track-tasks-to-shorten-your-project-schedule-HA010036399.aspx, last downloaded Mar. 5, 2014.