Automatic variable zooming system for a project plan timeline
Abstract
A system is provided that performs automatic variable zooming. The system displays a project plan timeline within a user interface, where a project plan timeline includes one or more tasks and a timeline includes one or more time units. The system further receives an instruction to invoke automatic variable zooming on the displayed project plan timeline. The system further receives a criteria. The system further calculates one or more scores for the one or more time units of the project plan timeline based on the criteria. The system further adjusts a zoom level for one or more portions of the project plan timeline based on the one or more calculated scores.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A non-transitory computer-readable medium having instructions stored thereon that, when executed by a processor, cause the processor to provide automatic variable zooming, the zooming comprising: displaying a project plan timeline within a user interface, wherein a project plan timeline comprises one or more tasks and a timeline comprising one or more time units; receiving an instruction to invoke automatic variable zooming on the displayed project plan timeline; receiving a criteria; calculating one or more scores for the one or more time units of the project plan timeline based on the criter
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 10,902,364 B2 | Automatic zoom control system for workforce timeline | 2021 | 0 |
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Agata Czarnigowska, "Earned value method as a tool for project control", Budownictwo i Architektura 3 (2008) 15-32, http://yadda.icm.edu.pl/baztech/element/bwmeta1.element.baztech-article-BPL6-0014-0070/c/httpwibis-pollub-plfilesplikikonferencje32.pdf, last downloaded Mar. 5, 2014.
- Anant Shree Agrawal, "Task Prioritization Rules for Project Execution", (IJERA) ISSN: 2248-9622, vol. 2, Issue 4, Jul.-Aug. 2012, pp. 1208-1212, http://www.ijera.com/papers/Vol2-issue4/GT2412081212.pdf, last downloaded Mar. 5, 2014.
- Andy Carmichael, Ph.D.,CEng, FBCS, "Planning by Priority, How to prioritize project tasks to maximize delivered business benefits", Ivis Technologies, Issue 2.0, Scheduling Projects Reference 3, http://www.openxprocess.com/whitepapers/Planning%20By%20Priority%20-04-.pdf, last downloaded Mar. 5, 2014
- Asana Guide, The path to doing great things, "Sorting & Filtering", https://asana.com/guide/projects/sorting, last downloaded Mar. 5, 2014.
- Bonnie Biafore, "Fast-track tasks to shorten your project schedule-Project-Office.com", http://office.microsoft.com/en-in/project-help/fast-track-tasks-to-shorten-your-project-schedule-HA010036399.aspx, last downloaded Mar. 5, 2014.