Patents
US 7,516,455 B2#1578981 Most CitedExpiredUnited States (USPTO)Utility

Probabilistic scheduling

37Forward Citations (#1578981 Global)
2.2/yrCitation Velocity (#1728509 Global)
8.17Citation PageRank (#1483055 Global)
17Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method includes generating a cost associated with each of a plurality of tasks to be scheduled, and scheduling the minimum cost task if the minimum cost task successfully executes. Generating may include determining a pair-wise probability representing a probability that two tasks in the plurality of tasks conflict with each other. A system includes a cost generator generating costs associated with a plurality of tasks, the costs based on probabilities that each of the tasks influence the other tasks, and a scheduling engine operable to schedule the task with the least cost.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 17 · Forward citations: 37.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer-implemented method comprising: receiving a plurality of task containers, each said task container representing a task to be scheduled at a computer, where each said task container includes a grouping of a plurality of resources containers, wherein each said resource container includes resource information that specifies one or more resources required for the represented task and selection criteria to select from the one or more resources, and wherein each said task container further includes an interface function that, when called, determines a pair-wise probability that the task re

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • An algorithm for optimal project scheduling under multiple resource constraints, 1971, Management science, pp. B803-B816.
  • Barberet al., "Conflict detection during plan integration for multi-agent systems", 2001, IEEE, pp. 616-628.
  • CPU reservations and time constraints: Efficient, predictable scheduling of independent activites, Jones et al, 1997, ACM, pp. 198-211.
  • Druschel et al., "The icecube approach to the reconciliation of divergent replicas", 2001, ACM, pp. 210-218.
  • Preguica, Nuno; Shapiro, Marc; Matheson, Caroline; "Efficient Semantics-Aware Reconciliation for Optimistic Write Sharing"; Microsoft Corporation, May 2002; title + pp. 1-30.