Demand-driven scheduling system and method
Abstract
A process is scheduled based on one or more tasks identified as control tasks from a set of tasks comprising part of a job. A desired work-in-progress load time level is set for each of the identified control tasks, and a time load on each of the identified control tasks is determined for each new job, each new job comprising one or more tasks. New jobs are released based on the desired work-in-progress load time level for one or more control tasks to approximately maintain the set desired work-in-progress load time level.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 22.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method of scheduling a process, comprising: identifying one or more control tasks from a set of tasks comprising part of a job; setting a desired work-in-progress load time level for each of the identified control tasks; determining a time load on each of the identified control tasks for each new job, each new job comprising one or more tasks; and releasing new jobs based on the desired work-in-progress load time level for one or more control tasks to approximately maintain the set desired work-in-progress load time level.
- Claim 2Depends on #1
The method of claim 1 , wherein control tasks comprise tasks in a manufacturing process.
- Claim 3Depends on #1
The method of claim 1 , wherein control tasks comprise tasks identified as potential bottleneck tasks.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗