Patents
US 9,922,305 B2#103571517 Most CitedActiveUnited States (USPTO)Utility

Compensating for reduced availability of a disrupted project resource

0Forward Citations (#103571517 Global)
0.0/yrCitation Velocity (#103571517 Global)
0.56Citation PageRank (#103571517 Global)
41Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method and associated systems for automatically identifying critical resources in an organization. An organization creates a model of the dependencies between pairs of resource types, wherein that model describes how the organization's projects and services are affected when a resource type becomes unavailable. This model may include a system of directed graphs. This model may be used to automatically identify a resource type as critical if unacceptable cost is incurred by resuming projects and services rendered infeasible when the resource type is disrupted. The model may also be used to automatically identify a first resource type as critical for a second resource type when disruption of the first resource type forces the available capacity of the second resource type to fall below a threshold value.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 41 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for compensating for reduced availability of a disrupted project resource, where a first resource comprises a set of instances of the first resource that are each associated with a corresponding available amount of the first resource that is made available by that instance, where a total available capacity of the first resource is a sum of available amounts of the first resource that are made available by all instances of the set of instances, where the project requires a first instance of the set of instances, a second instance of the set of instances, and a third instance of the set

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (41)

PatentTitleYearCitations
US 5,276,876 ARegistration of resources for commit procedures199479
US 6,078,912 AComputer-based system and method for resource determination and management200078
US 6,094,680 ASystem and method for managing distributed resources on networks2000151
US 6,219,654 B1Method, system and program product for performing cost analysis of an information technology implementation2001187
US 6,292,905 B1Method for providing a fault tolerant network using distributed server processes to remap clustered network resources to other servers during server failure2001339
US 2003191678 A1Disruption handling for scheduling system—64
US 2004064436 A1System and method for managing business continuity—97
US 2005144062 A1Business continuity information management system—56
US 2005165633 A1Method for reducing adverse effects of a disaster or other similar event upon the continuity of a business—30
US 2005240795 A1Resource management system and method—17
US 6,965,867 B1Methods and apparatus for allocating, costing, and pricing organizational resources200546
US 7,146,353 B2Resource allocation for multiple applications2006120
US 7,171,668 B2Automatic data interpretation and implementation using performance capacity management framework over many servers200746
US 2007208799 A1Systems and methods for business continuity—29
US 7,313,531 B2Method and system for quantitatively assessing project risk and effectiveness200739
US 7,330,822 B1Methods and systems for managing hierarchically organized and interdependent tasks and issues200893
US 2008091806 A1Dynamic On-Demand Clustering—90
US 7,444,635 B2Multi-task system for controlling execution of application sessions and reservation of resources200829
US 7,469,216 B2Method and system for manipulation of cost information in a distributed virtual enterprise20085
US 2009063234 A1Method and apparatus for capacity management and incident management system—42
US 7,516,455 B2Probabilistic scheduling200937
US 2009327012 A1Cooling resource capacity allocation using lagrange multipliers—18
US 7,827,557 B2Method and apparatus for allocating resources to applications using a linearized objective function201020
US 2010318846 A1System and method for incident management enhanced with problem classification for technical support services—72
US 2010333002 A1Method and tool for information security assessment that integrates enterprise objectives with vulnerabilities—27
US 7,979,298 B2Method and apparatus for operational risk assessment and mitigation201115
US 8,078,664 B2Evaluation of current capacity levels of resources in a distributed computing system201118
US 8,117,505 B2Resource exhaustion prediction, detection, diagnosis and correction201217
US 8,185,905 B2Resource allocation in computing systems according to permissible flexibilities in the recommended resource requirements201210
US 8,249,906 B2Interactive graphics-based planning systems201238

Non-Patent Literature (5)

  • Amendment (dated Jun. 28, 2016) for U.S. Appl. No. 14/250,684, filed Apr. 11, 2014.
  • Anonymous; A System and Method for Efficient and Effective Resumption of Organizational Operations during Disruptions; IP.com Prior Art Database Technical Disclosure; Jun. 21, 2011; 5 pages.
  • Business Continuity Plan Solutions; EverGreen Data Continuity, Inc.; Retrieved from the Internet: <URL: http://www.evergreen-data.com/>; retrieved on Feb. 16, 2012; 2 pages.
  • Business Continuity Planning for Small to Medium-Sized Businesses and the Voluntary Organisations; Shropshire County Council, Emergency Planning Unit; 2008; 24 pages.
  • Business Continuity Planning Procedures and Guidelines; United States Agency International Development; Jun. 1, 2006; 5 pages.