<P>PROBLEM TO BE SOLVED: To provide a demolishing work execution method for an outer wall of a building capable of securing safety by inhibiting a pillar from falling down inadvertently during demolishing work. <P>SOLUTION: Jack holding brackets 3 are set vertically…
Samejima Toshimi
<P>PROBLEM TO BE SOLVED: To provide a slinging work wire device capable of fastening and hanging by freely adjusting the length of the slinging work wire corresponding to the size and the length of the baggage when hanging the baggage such as building materials or the like…
<P>PROBLEM TO BE SOLVED: To provide a method for installing a simple efficient base plate for a seismic isolator. <P>SOLUTION: In the important points of the method for installing the base plate for the seismic isolator, the base plate 1 in which at least three…
<P>PROBLEM TO BE SOLVED: To provide a foundation for a crane working platform, which can be reused by saving construction costs and giving consideration to the surrounding environment, when ground is soft. <P>SOLUTION: The foundation 1 for the crane working platform…
<P>PROBLEM TO BE SOLVED: To provide a method for accurately and efficiently designing a foundation when a gantry is supported on a direct foundation without installing piles in the soft ground, in a foundation design method for a crane gantry. <P>SOLUTION: This…
<P>PROBLEM TO BE SOLVED: To provide a joint method of a reinforced concrete column and a beam connecting member capable of being easily connected with high degree of accuracy without being required for a curing period of concrete to be placed. <P>SOLUTION: The joint…
<P>PROBLEM TO BE SOLVED: To provide a wall connecting anchor that can be easily installed in an existing building without using a wall connecting anchor used in new building construction, and its installation method. <P>SOLUTION: The wall connecting anchor 1 is…
<P>PROBLEM TO BE SOLVED: To provide a sheathing board simply installed in an opening between the sheathing board and a cantilever slab accurately and a method for building a seismically isolated structure. <P>SOLUTION: In the sheathing board 1, a beltlike sealing…
<P>PROBLEM TO BE SOLVED: To provide a joining method for a column and beam capable of installing a highly strong closed type hoop reinforcement in a panel zone where a reverse beam is installed. <P>SOLUTION: In this joining method for the column and the beam, a…
To improve efficiency of a replacement work of steel columns that support a net, in an anti-scattering net system that covers an upper part of a demolition floor with the net when dismantling a multi-story building.SOLUTION: An anti-scattering net system comprises multiple steel…