To provide a collision prevention assist device that can be easily retrofitted to any construction vehicle by changing a tilt angle of a control lever and controlling the travel by expanding and contracting an actuator.SOLUTION: A push-back transfer mechanism 20 includes: a…
Koshimura Sosuke
PROBLEM TO BE SOLVED: To accurately install a road ancillary continuous structure without using a finishing stake.SOLUTION: A road ancillary facility construction method includes: a data creation process of creating three-dimensional design data on various types of parts 1, 2, 3…
To provide a road surface cutting method and a road surface cutter capable of cutting a surface layer without shaving a foundation in an asphalt pavement.SOLUTION: A road surface cutting method comprises a previous measurement process of measuring a surface layer thickness from…
PROBLEM TO BE SOLVED: To provide a concrete layer removal method that can detach a concrete layer formed on a steel material through a thermosetting resin adhesive.SOLUTION: A concrete layer removal method for removing a concrete layer 3 laid on a steel material (steel plate…
To enable measurement data to be accurately acquired by using a scatter RI sensor at a site where it is difficult to use a transmissive RI sensor, and also to enable measurement data to be facially acquired.SOLUTION: An RI measurement device A mounted on a mobile object is…
To provide a concrete leveling apparatus that can finish a surface smoothly and a concrete paved body manufacturing method used with the same.SOLUTION: A concrete leveling apparatus 100 comprises: a movable carriage 1; a first screed 10 that is fixed at the carriage 1 so as to…
To provide a loading amount management system that is relatively inexpensive and has high measurement accuracy.SOLUTION: A loading amount management system includes: loading amount measurement means 10 that measures a loading amount of a cutting waste material 4 when the cutting…
PROBLEM TO BE SOLVED: To provide a construction machine which can support an energy-saved operation corresponding to an operation state of a vibrator.SOLUTION: A construction machine 1 has an engine 50, a hydraulic pump driven by the engine 50, and a motor driven by hydraulic…
To provide a joint cutting device capable of holding a slate without a gap and of accurately forming a straight joint.SOLUTION: A joint cutting device 1 for forming joints in a concrete pavement comprises: a pair of holding plates 10, 10 holding a slate 3 inserted into a road…
To provide a screed device that can satisfactorily finish the property of a pavement surface while suitably increasing the density of a pavement material.SOLUTION: A screed device 4 being a device mounted on an asphalt finisher A and used to spread and compact a paving material…
To provide a paving system suitable for roadbed improvement method using a new heated asphalt mixture as a stabilizer.SOLUTION: An asphalt finisher A comprises: a travelling vehicle body 1; a conveyor 3 that supplies new heated asphalt mixture as a stabilizer on existing roadbed…