PROBLEM TO BE SOLVED: To provide a monitoring system of a belt conveyor, which can automatically determine whether or not a detected damaged part requires maintenance.SOLUTION: A system for monitoring abnormality of a belt conveyer includes at least: a line laser for irradiating…
Aoki Hiroaki
PROBLEM TO BE SOLVED: To reduce algorithm development costs and computing time while ensuring the travelling accuracy.SOLUTION: A unmanned construction method comprises an approaching step of moving a construction machine 1 from a machine starting point to an area to be…
To provide a steering device for a construction machine, which is easily mounted on a steering part of the construction machine without modification of a rotary handle equipped in advance on the steering part and which can control steering of the rotary handle.SOLUTION: A…
To provide a concrete compaction and management device capable of easily and surely compacting casting concrete.SOLUTION: A concrete compaction and management device 2 is provided with position detecting means 4 for detecting the position of a vibrator 1 inserted into concrete,…
PROBLEM TO BE SOLVED: To provide autonomous travel whose travel is smooth while travel precision is maintained.SOLUTION: An autonomous travel controller controls a construction machine 1 that performs autonomous travel. When a distance from a travel reference line to the…
To provide a revolving control system for a work vehicle capable of properly restricting revolving operation of a work vehicle while preventing generation of a defect such as disorder of grounding balance.SOLUTION: A revolving control system 7 for a work vehicle comprises: a…
<P>PROBLEM TO BE SOLVED: To enhance certainty, stability and reliability, when judging the opened or closed state of an opening or closing valve, and further enhance an information-gathering ability in an irrigation portion. <P>SOLUTION: This irrigation system 1 for…
<P>PROBLEM TO BE SOLVED: To provide a mechanism of facilitating a user selecting print settings in instructing printing by using history of changes in print settings to extract print setting candidates to be displayed as a preview. <P>SOLUTION: An information…
PROBLEM TO BE SOLVED: To provide a device for correcting thermal displacement, which can correct thermal displacement of a workpiece itself more accurately, and to provide a method for correcting thermal displacement.SOLUTION: The device for correcting thermal displacement…
PROBLEM TO BE SOLVED: To provide a cubic volume measurement system capable of realizing a cubic volume measurement higher in accuracy than that by a conventional method.SOLUTION: A cubic volume measurement system for measuring a cubic volume of objects to be conveyed such as…
PROBLEM TO BE SOLVED: To efficiently perform a series of operations from cutting of a concrete surface up to collection of the cut concrete surface by improving mobility to a decontamination target portion.SOLUTION: A decontamination apparatus for concrete includes: a cutting…
PROBLEM TO BE SOLVED: To increase a data retrieving speed in retrieving telephone directory data from a remote controller connected to a portable telephone. SOLUTION: A remote control device 20 for portable telephone is constituted to automatically down-load a small quantity of…
To achieve flexible control of construction machinery.SOLUTION: A machine learning device 20 is provided as a machine learning device for a construction machine that learns a target value for an overlapping length along a rolling compaction route for rolling compaction work…
PROBLEM TO BE SOLVED: To enable a hot heat keeping or a cold heat keeping item to be transported together with other freights, enable a stocker to be used as a convenient storing stocker and further enable is repetitive use to be carried out by a method wherein some divided…
<P>PROBLEM TO BE SOLVED: To prevent fraudulent actions by managing individual numbers at the time of the transportation, at the time of installation, at the time of removal and at the time of discarding for the frame, plate and board of a pachinko stand respectively, to…
<P>PROBLEM TO BE SOLVED: To provide a method of constructing a mono-pile foundation capable of reducing a construction period and a construction cost, and also provide a joint pipe used for the method. <P>SOLUTION: This method of constructing a mono-pile foundation…
To flexibly and easily realize a rolling compaction work of a construction machine.SOLUTION: The present invention relates to a machine learning device 30 for a construction machine for learning a travel route of a construction machine in a rolling compaction work of a rolling…
To provide means which can accurately measure an amount of water in a material.SOLUTION: The system for measuring an amount of water in a material comprises a belt conveyor 10, a material supply device 20 for supplying material A on the belt conveyor 10, an RI moisture meter 30…
To provide a quality control method for a concrete structure capable of controlling a position where concrete is placed in a state associated with a three dimensional model.SOLUTION: In a quality control method for a concrete structure which controls a placing range of concrete…
<P>PROBLEM TO BE SOLVED: To provide a water spray system capable of surely and easily performing water spray to water spray areas of a designated height without performing troublesome work. <P>SOLUTION: This water spray system comprises a control device 11 which…
PROBLEM TO BE SOLVED: To provide a position measurement system which measures a position of a work object without using measurement instruments.SOLUTION: A position measurement system 10 which is mounted in a construction machine 1 including a stereo camera 6 includes: a gyro…
PROBLEM TO BE SOLVED: To provide a device and a method for measuring the size of a precast member that can reduce the cost and the load of measuring the size of a precast member.SOLUTION: A precast member size measurement device 1 includes: a measurement mounting 2; a…
To enable measurement data to be accurately acquired by using a scatter RI sensor at a site where it is difficult to use a transmissive RI sensor, and also to enable measurement data to be facially acquired.SOLUTION: An RI measurement device A mounted on a mobile object is…
PROBLEM TO BE SOLVED: To easily create a dose distribution map by using an inexpensive general-purpose dosimeter having no external communication output.SOLUTION: A mobile communication terminal 10 includes: an image processing section 21 for identifying a measured value…
PROBLEM TO BE SOLVED: To provide an imaging device capable of causing a material to smoothly flow down for a deflection plate having a pin.SOLUTION: An imaging device 2A for grain size distribution includes flow regulation plates 21, 22 having a surface to which a material 3…