PCT No. PCT/DE91/00103 Sec. 371 Date Jul. 25, 1991 Sec. 102(e) Date Jul. 25, 1991 PCT Filed Feb. 7, 1991 PCT Pub. No. WO91/12374 PCT Pub. Date Aug. 22, 1991.The railway crossover includes two main tracks and a third track running between the main tracks and having an axis…
Floeter Friedhelm
The railway crossover includes two main tracks and a third track running between the main tracks and having an axis inclined to respective parallel axes of the main tracks, a plurality of ties each having a relatively long tie and a relatively short tie forming a respective pair…
In a process for constant-gauge laying of at least three tracks (2, 3, 4) laid a short distance apart, pairs of sleepers (9, 10) are passed under the outermost tracks (2, 4) and under each of the rails (3.1 or 3.2) of the central track (3) in contact with the latter into the…
PCT No. PCT/DE91/00103 Sec. 371 Date Jul. 25, 1991 Sec. 102(e) Date Jul. 25, 1991 PCT Filed Feb. 7, 1991 PCT Pub. No. WO91/12374 PCT Pub. Date Aug. 22, 1991.The railway crossover includes two main tracks and a third track running between the main tracks and having an axis…
PCT No. PCT/DE91/00103 Sec. 371 Date Jul. 25, 1991 Sec. 102(e) Date Jul. 25, 1991 PCT Filed Feb. 7, 1991 PCT Pub. No. WO91/12374 PCT Pub. Date Aug. 22, 1991.The railway crossover includes two main tracks and a third track running between the main tracks and having an axis…
Afin de poser des rails (2, 3, 4) séparés par un écart minime sans altérer la largeur de la voie, on introduit des paires de traverses (9, 10) sous les files extérieures de rails (2, 4) et sous les rails adjacents (3.1 et 3.2) de la file centrale de rails (3), dans l'espace…
PCT No. PCT/DE91/00103 Sec. 371 Date Jul. 25, 1991 Sec. 102(e) Date Jul. 25, 1991 PCT Filed Feb. 7, 1991 PCT Pub. No. WO91/12374 PCT Pub. Date Aug. 22, 1991.The railway crossover includes two main tracks and a third track running between the main tracks and having an axis…
1. Sposób ukladania ze stala szerokoscia co najmniej trzech torów kolejowych, umieszczonych w nieznacznym odstepie od siebie, zwlaszcza odcinków torów przylaczonych do rozjazdów i skrzyzowan, w których odstepy osiowe torów sa nieznacznie mniejsze od dlugosci normalnego pod-…
PCT No. PCT/DE91/00103 Sec. 371 Date Jul. 25, 1991 Sec. 102(e) Date Jul. 25, 1991 PCT Filed Feb. 7, 1991 PCT Pub. No. WO91/12374 PCT Pub. Date Aug. 22, 1991.The railway crossover includes two main tracks and a third track running between the main tracks and having an axis…