The arrangement for fastening a track component to a foundation (32) containing or consisting of conrete comprises a sleeve unit (40) consisting of an inner sleeve (42) with an internal structure, and an outer sleeve (44) anchored to the inner sleeve and to the concrete by force…
Schimpff Frithjof
The invention relates to a prestressed concrete sleeper, having at least two sleeper sections that can be coupled or are coupled rigidly by a connection device embedded in the sleeper heads, wherein the sleeper sections each comprise a concrete in the region adjacent to the…
The device has first and second guide plates (24,26) engaging on the side of a rail foot, and each with a non-central aperture for a screw bolt (32,34). Tension clamps are fixed to the plates via the bolts. At least one of the plates has a first and second edge (35,36,38,40) for…
A simple method for accurate fitting of a rails (12) onto a sleeper (10) has pairs of positioning plates (14, 16) rigidly linked and embedded into the sleeper. The rail bed is positioned between the plates, on a support cushion (23) and is secured by clamping profiles (18, 20)…
EN UN PROCESO PARA LA COLOCACION DE MEDIDA CONSTANTE DE POR LO MENOS TRES TRAYECTORIAS (2, 3, 4) COLOCADAS A POCA DISTANCIA UNA DE OTRA, SE PASAN UN PAR DE TRAVESAÑOS (9, 10), BAJO LAS TRAYECTORIAS MAS EXTERIORES (2, 4), Y BAJO CADA UNO DE LOS RAILES (3.1 O 3.2) DE LA…
PCT No. PCT/DE91/00103 Sec. 371 Date Jul. 25, 1991 Sec. 102(e) Date Jul. 25, 1991 PCT Filed Feb. 7, 1991 PCT Pub. No. WO91/12374 PCT Pub. Date Aug. 22, 1991.The railway crossover includes two main tracks and a third track running between the main tracks and having an axis…
The invention relates to a prestressed concrete sleeper, having at least two sleeper sections that can be coupled or are coupled rigidly by a connection device embedded in the sleeper heads, wherein the sleeper sections each comprise a concrete in the region adjacent to the…
In a process for constant-gauge laying of at least three tracks (2, 3, 4) laid a short distance apart, pairs of sleepers (9, 10) are passed under the outermost tracks (2, 4) and under each of the rails (3.1 or 3.2) of the central track (3) in contact with the latter into the…
Afin de poser des rails (2, 3, 4) séparés par un écart minime sans altérer la largeur de la voie, on introduit des paires de traverses (9, 10) sous les files extérieures de rails (2, 4) et sous les rails adjacents (3.1 et 3.2) de la file centrale de rails (3), dans l'espace…
1. Sposób ukladania ze stala szerokoscia co najmniej trzech torów kolejowych, umieszczonych w nieznacznym odstepie od siebie, zwlaszcza odcinków torów przylaczonych do rozjazdów i skrzyzowan, w których odstepy osiowe torów sa nieznacznie mniejsze od dlugosci normalnego pod-…
PCT No. PCT/DE91/00103 Sec. 371 Date Jul. 25, 1991 Sec. 102(e) Date Jul. 25, 1991 PCT Filed Feb. 7, 1991 PCT Pub. No. WO91/12374 PCT Pub. Date Aug. 22, 1991.The railway crossover includes two main tracks and a third track running between the main tracks and having an axis…