Apparatus and method for operating a data processing system (10) having a data processor (12), a disk data storage subsystem (14), and a disk manager (16). The method includes the steps of (a) partitioning the disk data storage system into multiple partitions including a first…
Engelmann Thomas
Embodiments of the invention include a system for scheduling the shipment of a set of products. The shipment may be loaded into a set of vehicles and further configured to fit a set of compartments on those vehicles. The system may include attempts to fill each vehicle and the…
A system and method are described for performing bucket-oriented capacity checks on resources to determine whether activities can be processed prior to a desired delivery date. For example, a method according to one embodiment of the invention comprises: subdividing a supply…
Methods, systems and computer program products are provided for allocating resources in a plannable process, wherein a number of resources is used for executing an order comprising a chain of related activities to be executed on the number of resources. In one implementation, a…
Apparatus and method for operating a data processing system (10) having a data processor (12), a disk data storage subsystem (14), and a disk manager (16). The method includes the steps of (a) partitioning the disk data storage system into multiple partitions including a first…
According to one general aspect, a method of transportation management may include receiving a request to transport a current freight unit from a current source location to a current destination location. The method may include selecting a prior shipment path based upon a…
Embodiments of the invention include a system for scheduling the shipment of a set of products. The shipment may be loaded into a set of vehicles and further configured to fit a set of compartments on those vehicles. The system may include attempts to fill each vehicle and the…
Identifying an operation that is critical to meeting a due date of a production order includes identifying operations associated with the production order, obtaining schedules for the operations using infinite production planning, obtaining start intervals for the operations…
Identifying an operation that is critical to meeting a due date of a production order includes identifying operations associated with the production order, obtaining schedules for the operations using infinite production planning, obtaining start intervals for the operations…
Abschlagsmatte (1) für einen Golfball (2), aufweisend mindestens eine Dämpfungsschicht mit einer Abschlagsoberfläche, insbesondere Kunstrasenoberfläche, auf der mindestens ein Abschlagspunkt für den Golfball (2) markiert ist, dadurch gekennzeichnet, dass in, auf oder an der…
A method of allocating resources in a plannable process, wherein a number of resources is used for executing an order comprising a chain of related activities to be executed on said number of resources; the method comprising, for each order: identifying a first activity…
The invention relates to a tee-off mat for a golf ball. Said tee-off mat comprises at least one attenuating layer with a tee-off top surface, especially an artificial turf surface, whereon at least one tee-off point is marked for the golf ball. According to the invention, means…
The lock assembly (1) has a baseplate (2) with a closing device (3) and a locking bolt (4). There is a keyhole-shaped aperture with an outer contour (6) which is larger then the European standard cylinder lock. There is an adapter sleeve (7) which fills the gap between the lock…
The present invention relates to a device for generating a high frequency clock 303 comprising a controller 311, a first FLL or PLL regulation loop 323, a fixed frequency reference clock oscillator 1101, an input signal 308, a divider c-ratio calculator 1110 and a measuring…
The present invention relates to a device for generating a high frequency clock 303 comprising a controller 311, a first FLL or PLL regulation loop 323, a fixed frequency reference clock oscillator 1101, an input signal 308, a divider ratio calculator 1110 and a measuring device…
The present invention relates to a device for generating a high frequency clock 303 comprising a controller 311, a first FLL or PLL regulation loop 323, a fixed frequency reference clock oscillator 1101, an input signal 308, a divider ratio calculator 1110 and a measuring device…
The arrangement (10) has a microcontroller (2) connected with several transceivers (11,19,20,21) through an interface (3). A quartz oscillator (12) is connected with output line (9) and input line (28) of the transceiver (11) designed as a clock, and associated with the internal…
Anordnung (10) zur Multi-Kanal-Synchronisierung, bei der ein Mikrocontroller (2) zumindest über eine Schnittstelle (3) mit mehreren Transceiver (11, 19, 20, 21) in Verbindung steht, von denen aus jeweils mehrere Kommunikationsleitungen (8) als Kommunikationskanäle weitergeführt…
Die Erfindung betrifft ein Vorrichtung 300 zur Erzeugung eines Hochfrequenztakts 303. Die Vorrichtung 300 umfasst eine Steuerung 311, einen ersten FLL- oder PLL-Regelkreis 323, einen zweiten FLL- oder PLL-Regelkreis 324 und ein Eingangssignal 308, das sporadisch ein…
Die Erfindung betrifft eine Vorrichtung zur Erzeugung eines Hochfrequenztakts 303 mit einer Steuerung 311, einem ersten FLL- oder PLL-Regelkreis 323, einem festfrequenten Referenztaktoszillator 1101, einem Eingangssignal 308, einer Teilerverhältnisberechnung 1110 und einer…
Die Erfindung betrifft ein Verfahren zur Erzeugung eines Hochfrequenztakts mit den Schritten Erzeugen eines Referenztakts in Abhängigkeit von einem Referenzsignal, wenn ein zweiter FLL- oder PLL-Regelkreis aktiv ist und in Abhängigkeit von dem Zustand des Referenzsignals zum…
Identifying an operation that is critical to meeting a due date of a production order includes identifying operations associated with the production order, obtaining schedules for the operations using infinite production planning, obtaining start intervals for the operations…
Bereitgestellt wird ein Verfahren (300) zur Auswahl eines Ansteuerparametersatzes für ein in einer Leistungsbaugruppe (100) verbautes Schaltelement (104). Das Verfahren (300) umfasst ein Bereitstellen (302) von mehreren vorbestimmten Ansteuerparametersätzen und Kennwerten für…
Methods, systems and computer program products are provided for allocating resources in a plannable process, wherein a number of resources is used for executing an order comprising a chain of related activities to be executed on the number of resources. In one implementation, a…