<P>PROBLEM TO BE SOLVED: To obtain a method for mounting a sensor element to a concrete structure and a method for properly inspecting quality of a concrete structure for existing concrete structures. <P>SOLUTION: A rodlike reinforcement 7 with sensor elements 10A,…
Arakane Naoki
PROBLEM TO BE SOLVED: To simply and highly accurately perform health monitoring of a concrete structure.SOLUTION: Stress applied to a concrete structure 12 can be directly measured from a voltage value generated in accordance with a distortion change transmitted to a…
PROBLEM TO BE SOLVED: To provide a construction method for a precast concrete skeleton, which can be easily designed without giving consideration to an influence of secondary stress brought about by prestress.SOLUTION: In a construction method for a precast concrete skeleton in…
PROBLEM TO BE SOLVED: To provide a construction method for a reinforced concrete building, in which much time for the execution of works is not required and which has high heat-insulation properties and high strength, can display high waterproofing performance and has an outside…
<P>PROBLEM TO BE SOLVED: To efficiently transmit ultrasonic waves through the inside of a structure without necessities of a cleaning and removing operation of a liquid contact medium, an attaching operation of a solid gel sheet, and an applying operation of a polymer…
<P>PROBLEM TO BE SOLVED: To increase working efficiency and reduce construction cost in an aseismatic reinforcing construction for an existing skeleton. <P>SOLUTION: This after-construction anchor 10 includes a plate 11, flanges 12, 13 provided so as to project from…
PROBLEM TO BE SOLVED: To provide a method of manufacturing a curtain wall which enables execution of manufacture in a narrow place and by one similar form even for several kinds of dimensions. SOLUTION: A form is equipped with a flat base board 51 and the peripheral form 2 that…
PROBLEM TO BE SOLVED: To easily perform construction without obstructing passing of a shared external corridor, a balcony or the like present outside an existing building when reinforcing the exiting building, and to shorten a construction period further.SOLUTION: A…
PROBLEM TO BE SOLVED: To provide an external heat insulating construction method for a building having the advantages of obtaining high external heat insulation in the periphery of a building, overcoming the problems in design and water proof respects due to excessive joints,…
PROBLEM TO BE SOLVED: To provide a seismic strengthening structure of an existing building, which can increase strength of the existing building, shorten a natural period thereof and increase a vibrational energy attenuation effect thereof.SOLUTION: A plurality of reinforcement…
To reduce cost and period of a construction using a hole-in anchor even when an additional structure to which tensile force is applied is fixed to an existing structure.SOLUTION: A joint method of the present invention comprises steps of: placing a joint member 18 closely…
To provide an RCS junction structure capable of correcting a settlement of streaks, restricting an enlargement of a cross section of a column and also distributing a load applied to the column.SOLUTION: An RCS junction structure 1 comprises: a pair of outer diaphragms 13 each…