PROBLEM TO BE SOLVED: To improve the cut-off performance of joint parts of inner and outer impervious wall constituent members applied to an impervious wall of a waste disposal plant or the like and thereby realize drying work in a space. SOLUTION: Inner and outer continuous…
World Engineering Kk
PROBLEM TO BE SOLVED: To provide a high-reliability protecting means capable of be easily constructed for protecting a structure at a site where the structure is hit by strong waves including stones or the like, large stones or the like are difficult to acquire, and the…
<P>PROBLEM TO BE SOLVED: To improve reliability for water sealability by constructing an impervious wall using steel sheet piles and impervious materials at a waste disposal plant against a breakwater of a caisson installed in the sea side when constructing the controlled…
<P>PROBLEM TO BE SOLVED: To reduce the construction cost of an impervious wall for the partition revetment of waste reclaimed land by inserting an auxiliary insertion into a layer of an asphalt mixture in an integrated form. <P>SOLUTION: The method comprises…
PROBLEM TO BE SOLVED: To easily form a water barrier sheet to which water barrier properties are provided so as to prevent water coming into contact with waste from penetrating in ground water in a waste landfill disposal plant and to enhance the reliability of a water barrier…
PROBLEM TO BE SOLVED: To stably hold an impervious layer against natural ground by fixing mat layer to be laid by using impervious connecting means on a face of slope by using fixing means such as anchor bolts. SOLUTION: An internal reinforcing layer 23 comprising woven cloth…
<P>PROBLEM TO BE SOLVED: To prevent the circulation of water inside and outside a partition in a partitioned revetment at a waste landfill by performing an improvement in impermeable treatment to an accumulation layer at a lower part of a caisson and to a base of the…
<P>PROBLEM TO BE SOLVED: To provide a rotary nozzle head which improves washing efficiency by always continuously jetting high-pressure water to the whole of curved surface of the outer periphery on one of the front side or back side of component pipes in a pipe-made…
PROBLEM TO BE SOLVED: To provide an impervious revetment structure capable of preventing and controlling the seepage of stored water in a sea area landfill site into the open sea, allowing the place where the seepage occurs to be rapidly located and repaired. SOLUTION: Steel…
PROBLEM TO BE SOLVED: To simplify the constitution of the connection part of a sheet material and improve workability in a cutoff treatment using the sheet material in a construction such as a partition revetment in a reclaimed land or the like. SOLUTION: When a water cutoff…
PROBLEM TO BE SOLVED: To enhance the reliability of an impervious layer for the surface of a filled revetment and the surface of the submarine ground and easily provide an impervious effect for sheet connections and damaged parts by stacking a plurality of impervious members for…
<P>PROBLEM TO BE SOLVED: To improve the reliability of a revetment by conducting a treatment, in which an impervious material is stuck fast on the walls of structures, among the structures installed on a partition revetment when a waste dumping place is partitioned by a…
<P>PROBLEM TO BE SOLVED: To increase the reliability of a water shielding structure constructed integrally with a bulkhead by constructing a water shielding layer at a connection part when a structure such as a caisson is constructed or a sheet pipe is driven in a…
<P>PROBLEM TO BE SOLVED: To provide a revetment for reclamation, and a caisson used for the revetment for reclamation that can exhibit sufficient impervious performance. <P>SOLUTION: The ground surface 10 is excavated down to bury a caisson lower part, or an…
PROBLEM TO BE SOLVED: To provide a caisson structure capable of receiving safely waste before the receiving zone is completely partitioned. SOLUTION: The caisson is provided with a bottom slab 11, external walls 12 erected from the vicinity of respective side edges of the bottom…
PROBLEM TO BE SOLVED: To facilitate the work of packing a water-impervious material such as an asphalt mixture into a space inside a joint part between pile members when steel sheet piles or the like are arranged in a line for the construction of a water-impervious wall.…
<P>PROBLEM TO BE SOLVED: To provide a torque wrench with a marking function which easily performs bolt fastening work and fastening condition confirmation. <P>SOLUTION: This torque wrench with marking function is provided with: a rotational piston part 67 fitted to…
<P>PROBLEM TO BE SOLVED: To enable a favorable exertion of impermeability at the joint part of an impervious sheet and facilitated construction of an impervious layer when an impervious wall is constructed for water shielding at a waste disposal site that is constructed…
PROBLEM TO BE SOLVED: To excellently maintain erosion controllability even when the leveling accuracy of a laying surface is lowered when the erosion control treatment of revetment for a reclaimed land is conducted by using an erosion-control sheet in which short-fiber nonwoven…
PROBLEM TO BE SOLVED: To improve the reliability of an impervious layer by constructing the layer for foundation ripraps and the ground surface of a sea bottom by overlapping plural layers of sealing members when a waste disposal plate is to be constructed in a sea area.…
PROBLEM TO BE SOLVED: To provide a water sealing treatment method for a revetment demarcating a site for landfilling waste that is capable of well establish water sealing performance between a caisson side of a water sealing work using an impervious sheet and the end part of a…
<P>PROBLEM TO BE SOLVED: To construct a wall with increased reliability by constructing a height increasing part on a water impervious wall to a bulkhead body constructed by placing concrete on caisson when height must be increased after constructing the partitioning…
<P>PROBLEM TO BE SOLVED: To favorably develop an impervious property by erecting a steel sheet pile in a continuous wall shape in a partitioning revetment and filling an impervious material in between the joint part between the steel sheet piles and the sheet pile body, in…
PROBLEM TO BE SOLVED: To construct a foundation rubble-mound on a superposing sheet member and arranging a deformable heavy mat member at the ends of the superposing sheet to prevent scouring of the bottom of the sea by the mat member and stably support a structure when the…
PROBLEM TO BE SOLVED: To provide the construction method for a submarine buried structure in which a pipe can be protected excellently and construction work is facilitated when a seabottom ground surface is excavated and a pipe is laid. SOLUTION: An excavated ditch 20 is built…