Efficient paving operation requires that the levelling operation of asphalt be carried out accurately along a reference line which follows a given direction along a roadside. A simple and effective automatic control device for controlling the steering direction in conjunction…
Nippon Road
<P>PROBLEM TO BE SOLVED: To provide a cleaning vehicle capable of cleaning the whole wall surface of a tunnel while traveling in the same direction as general vehicles without interfering with the following vehicle in cleaning the wall surface right beside the vehicle, and…
Efficient paving operation requires that the levelling operation of asphalt be carried out accurately along a reference line (A) which follows a given direction along a roadside. A simple and effective automatic control device for controlling the steering direction in…
PROBLEM TO BE SOLVED: To provide a high-reliability protecting means capable of be easily constructed for protecting a structure at a site where the structure is hit by strong waves including stones or the like, large stones or the like are difficult to acquire, and the…
<P>PROBLEM TO BE SOLVED: To provide a paving material excellent in draining performance and durability, and capable of being paved in a short time and its pavement work method. <P>SOLUTION: A semi-flexural paving asphalt mix is laid on roadbed, cement milk is…
<P>PROBLEM TO BE SOLVED: To solve the problem of the absorption loss of a polymer binder at a time when the crushed piece of the tile waste material having a porosity and water absorption properties is used for a surface covering aggregate and the insufficient curing of…
A pavement member (1) and a method of forming pavement on the automobile test road by using this pavement member (1), for improving the efficiency in the construction of the pavement and the precision for the road surface finish. A plurality of pavement members (1) are…
<P>PROBLEM TO BE SOLVED: To improve reliability for water sealability by constructing an impervious wall using steel sheet piles and impervious materials at a waste disposal plant against a breakwater of a caisson installed in the sea side when constructing the controlled…
<P>PROBLEM TO BE SOLVED: To reduce the construction cost of an impervious wall for the partition revetment of waste reclaimed land by inserting an auxiliary insertion into a layer of an asphalt mixture in an integrated form. <P>SOLUTION: The method comprises…
To provide a collision prevention system that can achieve speed reduction by limiting an operable range of an operation part for adjusting a travel speed, can be provided on an existing industrial vehicle even by post-installation, and also can have functions easily added to…
PROBLEM TO BE SOLVED: To easily form a water barrier sheet to which water barrier properties are provided so as to prevent water coming into contact with waste from penetrating in ground water in a waste landfill disposal plant and to enhance the reliability of a water barrier…
PROBLEM TO BE SOLVED: To save the trouble in installation construction by facilitating supplying of electric power to a transmission device for information that a pavement block is provided with. SOLUTION: An information-providing system has a high-frequency power source 116, a…
<P>PROBLEM TO BE SOLVED: To provide a method for manufacturing recycled concrete which develops sufficient strength even if waste concrete is completely used as aggregate and by which neutralization is suppressed and durability is sufficient even if a reinforced concrete…
A concrete block has a first and a second hole passing through the concrete block in a vertically direction. An internal thread is formed in the first and the second hole. A plurality of tiles have a slipping resistivity. The tiles are arranged in order on an upper surface of…
PROBLEM TO BE SOLVED: To stably hold an impervious layer against natural ground by fixing mat layer to be laid by using impervious connecting means on a face of slope by using fixing means such as anchor bolts. SOLUTION: An internal reinforcing layer 23 comprising woven cloth…
<P>PROBLEM TO BE SOLVED: To prevent the circulation of water inside and outside a partition in a partitioned revetment at a waste landfill by performing an improvement in impermeable treatment to an accumulation layer at a lower part of a caisson and to a base of the…
<P>PROBLEM TO BE SOLVED: To provide a simple-structured method for joining concrete pavement slabs, which is also excellent in workability on the job. <P>SOLUTION: A joining reinforcement 6 is housed in a horizontal hole 5 in one pavement slab and after joining joint…
PROBLEM TO BE SOLVED: To provide a paste or mortar which is disposed between an existing concrete cured article and water-permeable concrete to improve the adhesion strength, when the water-permeable concrete is newly built on the existing concrete cured article. SOLUTION: This…
PURPOSE:To control a screed to smoothly follow along a basic line. CONSTITUTION:A couple of front and rear detectors 14, 15 checking a basic line A, are equipped at the outside ends or a screed 6 which is extensible by a screed extension device 8. A controller 23 judges whether…
PROBLEM TO BE SOLVED: To provide form construction of concrete pavement excellent in work efficiency and, at the same time, to make it possible to stably install the form consturction of concrete pavement in an approximately horizontal state to the uneven surface. SOLUTION: A…
PROBLEM TO BE SOLVED: To enhance the reliability of an impervious layer for the surface of a filled revetment and the surface of the submarine ground and easily provide an impervious effect for sheet connections and damaged parts by stacking a plurality of impervious members for…
<P>PROBLEM TO BE SOLVED: To lower the road surface temperature of the ground surface by rainwater. <P>SOLUTION: The rainwater stored in a rainwater storage facility 15 is supplied in a water retentive pavement layer 11 by a water supply means 17 to lower the road…
<P>PROBLEM TO BE SOLVED: To improve the reliability of a revetment by conducting a treatment, in which an impervious material is stuck fast on the walls of structures, among the structures installed on a partition revetment when a waste dumping place is partitioned by a…
<P>PROBLEM TO BE SOLVED: To increase the reliability of a water shielding structure constructed integrally with a bulkhead by constructing a water shielding layer at a connection part when a structure such as a caisson is constructed or a sheet pipe is driven in a…
PURPOSE:To pave and level highly dense steel fiber concrete by providing a screed having a vibrating slope plane and two sets of dampers alternately moving up and down on the rear part of a hopper provided with a screw spreader, in order. CONSTITUTION:A paving and levelling…