Patents
Assignee / Organization

Vico Software Kft

27Total Forward Citations
8Indexed Patents
3Avg Citations / Patent
3Portfolio H-Index
US 7,752,020 B2#6982889 Most Cited · 14 citations0.9/yr · PR 2.36ActiveUS · Utility
System and method for modeling construction risk using location-based construction planning models
Inventors: Seppanen Olli Pentti Petteri, Pelkonen Ilkka Pentti Samuli, Wessman Tim MarecAssignee: Vico Software KftFiled 2006-08-11 · Granted 2010-07-06

A method for modeling construction risk is provided. The method includes providing a statistical model for each of a plurality of location-based tasks of a construction project model. A model parameter is randomly selected for each of the plurality of statistical models to…

US 8,244,569 B2#13362466 Most Cited · 8 citations0.6/yr · PR 1.85ActiveUS · Utility
Non-destructive element splitting using location-based construction planning models
Inventors: Seppanen Olli P P, Freeman Clay J, Broekmaat MarcelAssignee: Seppanen Olli P P, Freeman Clay JFiled 2008-04-03 · Granted 2012-08-14

A system for location-based management of construction is provided. A plurality of location systems generate one or more locations where construction activities associated with one or more elements in each location can be performed. A construction activity location system…

WO 2008/021259 A2#26655074 Most Cited · 4 citations0.2/yr · PR 1.18PendingWO · Application
System and method for modeling construction risk using location-based construction planning models

A method for modeling construction risk is provided. The method includes providing a statistical model for each of a plurality of location-based tasks of a construction project model. A model parameter is randomly selected for each of the plurality of statistical models to…

WO 2008/021259 A3#60956600 Most Cited · 1 citations0.1/yr · PR 0.76ActiveWO · Utility
System and method for modeling construction risk using location-based construction planning models

A method for modeling construction risk is provided. The method includes providing a statistical model for each of a plurality of location-based tasks of a construction project model. A model parameter is randomly selected for each of the plurality of statistical models to…

EP 1,943,620 A2#148552617 Most Cited · 0 citations0.0/yr · PR 0.56PendingEP · Application
System and method for determining variance in building structures
Inventors: Freeman Clay J, Broekmaat MarcelAssignee: Vico Software KftFiled 2006-09-26

A system and method for designing and scheduling building construction is provided. The system includes a three dimensional design system that generates three dimensional design data using one or more elements in a spatial tree structure. One or more recipes are associated with…

EP 2,013,813 A2#76366985 Most Cited · 0 citations0.0/yr · PR 0.56PendingEP · Application
Location-based construction planning and scheduling system

An apparatus for location-based management of construction is provided. The apparatus includes a first layer locations system generating one or more first locations where construction activities can be performed in parallel, such as different buildings. A second layer locations…

WO 2007/035967 A3#96452851 Most Cited · 0 citations0.0/yr · PR 0.56ActiveWO · Utility
System and method for determining variance in building structures
Inventors: Freeman Clay, Broekmaat MarcelAssignee: Vico Software Kft, Freeman ClayFiled 2006-09-26

A system and method for designing and scheduling building construction is provided. The system includes a three dimensional design system that generates three dimensional design data using one or more elements in a spatial tree structure. One or more recipes are associated with…

WO 2007/109030 A3#129524666 Most Cited · 0 citations0.0/yr · PR 0.56ActiveWO · Utility
Location-based construction planning and scheduling system

An apparatus for location-based management of construction is provided. The apparatus includes a first layer locations system generating one or more first locations where construction activities can be performed in parallel, such as different buildings. A second layer locations…