A three-dimensional (3D) chip is fabricated from components that have been cut out of a two-dimensional (2D) chip. The components from the 2D chip are layered and coupled to create the layers of the 3D chip. By testing the 2D chip first, the layers of the 3D chip have been…
Varekamp Patrick R
A method of forming CMOS semiconductor (10) materials with PFET (16) and NFET (14) areas formed on a semiconductor substrate (12), covered respectively with a PFET (16) and NFET (14) gate dielectric layers composed of silicon oxide and different degrees of nitridation (18D and…
An oxynitride material is used to form shallow trench isolation regions in an integrated circuit structure. The oxynitride may be used for both the trench liner and trench fill material. The oxynitride liner is formed by nitriding an initially formed oxide trench liner. The…
A method and apparatus comprises determining a number of planned starts of a product during a predetermined time period for future processing, averaging the number of planned starts for the predetermined time period, and setting a production rate for a first range based on the…
A system and method are disclosed for prioritizing a plurality of lots in a manufacturing process. Portions of a priority for each lot are created. The portions are combined to form a unique range priority for each lot. The range priorities may be used to equitable compare all…
A system and method for driving new technology WIP at a controlled speed side-by-side with production WIP using a common range management infrastructure. The system and method allow new technology WIP and production WIP to be driven together in the same fabricator with the same…
A method and device comprises assigning process routings to the flows, applying range break rules to the flows based on the input data regarding operations and toolsets, and outputting the results of the applying step to provide range break boundaries.
A method and apparatus includes determining a number of planned starts of a product during a predetermined time period for future processing, averaging the number of planned starts for the predetermined time period, and setting a production rate for a first range based on the…
A method and apparatus includes determining a number of planned starts of a product during a predetermined time period for future processing, averaging the number of planned starts for the predetermined time period, and setting a production rate for a first range based on the…
A method and apparatus includes determining a number of planned starts of a product during a predetermined time period for future processing, averaging the number of planned starts for the predetermined time period, and setting a production rate for a first range based on the…