Method and system for setting rates and targets in a range management system
Abstract
A method and apparatus includes determining a number of planned starts of a product during a predetermined time period for future processing, averaging the number of planned starts for the predetermined time period, and setting a production rate for a first range based on the average number of planned starts.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method comprising: determining a number of planned starts for each part number of a product during a predetermined time period for future processing; averaging the number of planned starts for the predetermined time period; setting a production rate for a first range based on the average number of planned starts using a processor, wherein the production rate is a takt rate; setting a second production rate for a second range based on the average number of planned starts; mapping each part number to a corresponding range flow; determining a number of starts for each part number for each corre
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (15)
Non-Patent Literature (1)
- Stephen J. Shea, et al., "Development and Implementation the Range Management System in a Multi-Flow Fabricator", 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, p. 398-404.