Method and system for setting rates and targets in a range management system
Abstract
A method and apparatus includes determining a number of planned starts of a product during a predetermined time period for future processing, averaging the number of planned starts for the predetermined time period, and setting a production rate for a first range based on the average number of planned starts.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method, comprising: determining a number of planned starts of a product during a predetermined time period for future processing; averaging the number of planned starts for the predetermined time period; setting a first production rate for a first range based on the average number of planned starts using a processor; setting a second production rate for a second range based on the average number of planned starts; and propagating the first production rate of the first range to the second production rate for the second range; wherein the averaging the number of planned starts comprises averag
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (15)
Non-Patent Literature (2)
- Notice of Allowance dated May 2, 2012 in U.S. Appl. No. 12/492,373.
- Shea et al., "Development and Implementation the Range Management System in a Multi-Flow Fabricator", IEEE/SEMI Advanced Semiconductor Manufacturing Conference 1997, pp. 398-404.