A main tower of a cable stayed bridge and a construction method of a cable stayed bridge using the same are provided to construct a cable of a cable-stayed bridge without using a tower crane and a temporary scaffold. In a main tower of a cable stayed bridge, the top of many…
Se Corp
<P>PROBLEM TO BE SOLVED: To provide an installation method of a stay cable for reducing cost and shortening the construction period of cable installation work. <P>SOLUTION: A cylindrical clamp material of bundling a strand 6 is divided into an upper clamp 8a and a…
The present invention provides a cable bridge construction method and a cable bridge built by using the same. In the cable bridge construction method, multiple floor cables (1) as well as multiple horizontal beams (2) are installed. A pair of main cables (4) are installed above…
PROBLEM TO BE SOLVED: To provide a method for holding a long-time superior performance for detecting elongation of a ground anchor caused by a tensile force, for example, in a slope, a retaining wall, etc. SOLUTION: This detection method detects the extension/contraction of the…
PROBLEM TO BE SOLVED: To provide a desalination apparatus high in energy efficiency, low in cost and miniaturizable, and a method for producing fresh water.SOLUTION: The desalination apparatus for producing fresh water by condensing after evaporating raw water includes a raw…
PROBLEM TO BE SOLVED: To solve the problems of environmental destruction due to generation of a large amount of carbon dioxide and an increase in electric energy cost in a conventional magnesium metal production method.SOLUTION: In a magnesium metal production method, magnesium…
PROBLEM TO BE SOLVED: To facilitate confirmation of cable appearance and exchange of cables, in a method for stretch cables at a cable saddle portion for use in a diagonally strained bridge, for instance. SOLUTION: The method for stringing the cables at the cable saddle portion…
A macrocycle based on β-diketimines, a process for preparing the inventive macrocycle, an uncharged macrocyclic dimetallic complex based on the inventive macrocycle, and a process for preparing the uncharged macrocyclic dimetallic complex, the use of the uncharged macrocyclic…
Through co-action between auxiliary triangular structural frames, which are each constructed at opposite ends of a truss girder or arch girder, and a cable stretched between the auxiliary triangular structural frames, an upwardly directed force is exerted to the truss girder or…
PROBLEM TO BE SOLVED: To closely and effectively bundle tendon members in a substantially hexagonal bundle shape by clamping a plurality of the tendon members under a state that an aligning plate and/or a dammy tensioning plate are interposed. SOLUTION: This is a bundle device…
<P>PROBLEM TO BE SOLVED: To provide a basket which can certainly transmit a sectional force even under a construction condition of a low and narrow space and is easily constructed, and to provide a connection method and the structure of piles and pole members, using the…
Through co-action between auxiliary triangular structural frames which are each constructed at opposite ends of a truss girder or arch girder and a cable stretched between the auxiliary triangular structural frames, an upward directing force is exerted to the truss girder or…
PROBLEM TO BE SOLVED: To provide a construction method of a bridge PC floor slab capable of carrying out split construction for reducing a construction period for the construction method providing bridge axial prestress on the bridge PC floor slab in e.g. expressway, motorway or…
<P>PROBLEM TO BE SOLVED: To install a tension material in a tension exhibitable state even in a state in which a bracket can not be fixed near an upper end part of, for example, a lower structure, when restricting the relative movement of an upper structure to the lower…
<P>PROBLEM TO BE SOLVED: To provide a diagonal tensile cable erection method which contributes to efficient execution of temporary erection works of the diagonal tensile cable. <P>SOLUTION: According to the diagonal tensile cable erection method, when a plurality of…
PROBLEM TO BE SOLVED: To provide a device for assessing remnant tensile force of a large number of ground anchors readily at a low cost, for responding to a demand on a device and a method for assessing the remnant tensile force of a large number of ground anchors readily at a…
To provide a method for producing magnesium hydride that emits no carbon dioxide and has good production efficiency, to provide a generating system using magnesium hydride that emits no carbon dioxide nor radiation and to provide an apparatus for producing magnesium hydride as…
PROBLEM TO BE SOLVED: To provide a displace restriction device-cum-bridge fall prevention device installed in a bridge or the like, capable of coping with displacement in an ordinary earthquake. SOLUTION: A connection member 4 having a specified length is installed and stoppers…
<P>PROBLEM TO BE SOLVED: To freely adjust the erection angle of a tension member to a bracket and to allow the tension member to follow the change of the erection angle in spite of simple structure in a connecting device impeding the relative displacement, exceeding a…
PROBLEM TO BE SOLVED: To provide a structure for breakwater which has substantially the same slid resistance and fall resistance with a conventional breakwater, and can be constructed in a short period of construction because of problems of a conventional structure for…
Native e-commerce transactables for social and other familiar and/or suitable user environments are enabled. A user of a network site may interact with a transactable to conduct a transaction with a 3 rd party without leaving a user environment of the network site. The…
<P>PROBLEM TO BE SOLVED: To damp vibration, by preventing the resonance of a cable, while improving its arranging workability, in a spacer for a protective pipe in a cable stayed bridge. <P>SOLUTION: This spacer 1 for the protective pipe being a clearance member is…
<P>PROBLEM TO BE SOLVED: To provide a subaqueous caisson and a method of reinforcement repair work for the subaqueous caisson, which is simple in structure and low in cost, and can effectively prevent the slippage, fall or the like of the subaqueous caisson due to ocean…
PURPOSE: A corner coated block of a sea mound is provided to prevent damage to coated concrete blocks due to waves. CONSTITUTION: An inclined part(101) and a top part(102) meet at an upper edge. An upper corner coated block is coated on the upper edge. The length of a flat part…
<P>PROBLEM TO BE SOLVED: To simplify temporary work by reducing the installation number of temporary brackets which temporarily bear a vertical load of an upper structure, when a base-isolation device is installed in a partial section of an existing column so as to make an…