Patents
Assignee / Organization

Se Corp

301Total Forward Citations
224Indexed Patents
1Avg Citations / Patent
11Portfolio H-Index
KR 100,876,074 B1#2978485 Most Cited · 25 citations1.4/yr · PR 5.48ActiveKR · Utility
Main towers of cable stayed girder bridge and the construction method
Inventors: Nam Hong KiAssignee: Korea Se Corp, Dm Engineering Co LtdFiled 2008-09-22 · Granted 2008-12-26

A main tower of a cable stayed bridge and a construction method of a cable stayed bridge using the same are provided to construct a cable of a cable-stayed bridge without using a tower crane and a temporary scaffold. In a main tower of a cable stayed bridge, the top of many…

JP 2007315035 A#3942511 Most Cited · 21 citations1.1/yr · PR 3.44ActiveJP · Utility
Installation method of stay cable
Inventors: Ohashi Wataru, Kibe HiroshiAssignee: Se CorpFiled 2006-05-25

<P>PROBLEM TO BE SOLVED: To provide an installation method of a stay cable for reducing cost and shortening the construction period of cable installation work. <P>SOLUTION: A cylindrical clamp material of bundling a strand 6 is divided into an upper clamp 8a and a…

KR 101,678,849 B1#5237537 Most Cited · 17 citations1.7/yr · PR 3.56ActiveKR · Utility
Cable Bridge and Constructing Method thereof
Inventors: Na Hyun Geun, Kim Se JongAssignee: Korea Se CorpFiled 2016-09-07 · Granted 2016-11-23

The present invention provides a cable bridge construction method and a cable bridge built by using the same. In the cable bridge construction method, multiple floor cables (1) as well as multiple horizontal beams (2) are installed. A pair of main cables (4) are installed above…

JP 2002081061 A#5618241 Most Cited · 16 citations0.7/yr · PR 4.01ExpiredJP · Utility
Load control method for ground anchor
Inventors: Kobori Katsuhiro, Takeya KojiAssignee: Se CorpFiled 2000-09-06

PROBLEM TO BE SOLVED: To provide a method for holding a long-time superior performance for detecting elongation of a ground anchor caused by a tensile force, for example, in a slope, a retaining wall, etc. SOLUTION: This detection method detects the extension/contraction of the…

JP 2012239956 A#6288250 Most Cited · 15 citations1.1/yr · PR 2.79ActiveJP · Utility
Desalination apparatus and method for producing fresh water
Inventors: Takizawa TsutomuAssignee: Se CorpFiled 2011-05-17

PROBLEM TO BE SOLVED: To provide a desalination apparatus high in energy efficiency, low in cost and miniaturizable, and a method for producing fresh water.SOLUTION: The desalination apparatus for producing fresh water by condensing after evaporating raw water includes a raw…

JP 2016216780 A#6172015 Most Cited · 15 citations1.5/yr · PR 3.36ActiveJP · Utility
Magnesium metal production method and production device thereof
Inventors: Takizawa Tsutomu, Sakamoto YuichiAssignee: Se CorpFiled 2015-05-20

PROBLEM TO BE SOLVED: To solve the problems of environmental destruction due to generation of a large amount of carbon dioxide and an increase in electric energy cost in a conventional magnesium metal production method.SOLUTION: In a magnesium metal production method, magnesium…

JP 2001200509 A#6769192 Most Cited · 14 citations0.6/yr · PR 3.10ExpiredJP · Utility
Method and structure for stretching cable at cable saddle portion, and the cable and bridge
Inventors: Suzuki Akiyoshi, Hirayama Akira, Oikawa KoichiAssignee: Se CorpFiled 2000-01-11

PROBLEM TO BE SOLVED: To facilitate confirmation of cable appearance and exchange of cables, in a method for stretch cables at a cable saddle portion for use in a diagonally strained bridge, for instance. SOLUTION: The method for stringing the cables at the cable saddle portion…

US 9,018,318 B2#7150135 Most Cited · 14 citations1.3/yr · PR 1.58ActiveUS · Utility
Catalysts for the preparation of carbonates from epoxides and CO2

A macrocycle based on β-diketimines, a process for preparing the inventive macrocycle, an uncharged macrocyclic dimetallic complex based on the inventive macrocycle, and a process for preparing the uncharged macrocyclic dimetallic complex, the use of the uncharged macrocyclic…

US 6,892,410 B2#7800802 Most Cited · 13 citations0.6/yr · PR 1.91ExpiredUS · Utility
Reinforcement structure of truss bridge or arch bridge
Inventors: Tokuno Mitsuhiro, Saito Fumihiro, Takeshima Seio, Nakai YoshiakiAssignee: Asahi Engineering, Eco Japan Co LtdFiled 2003-09-03 · Granted 2005-05-17

Through co-action between auxiliary triangular structural frames, which are each constructed at opposite ends of a truss girder or arch girder, and a cable stretched between the auxiliary triangular structural frames, an upwardly directed force is exerted to the truss girder or…

JP 2000282409 A#7943082 Most Cited · 12 citations0.5/yr · PR 5.13ExpiredJP · Utility
Method and device for bundling tendon

PROBLEM TO BE SOLVED: To closely and effectively bundle tendon members in a substantially hexagonal bundle shape by clamping a plurality of the tendon members under a state that an aligning plate and/or a dammy tensioning plate are interposed. SOLUTION: This is a bundle device…

JP 2007205125 A#8261499 Most Cited · 12 citations0.6/yr · PR 2.63ActiveJP · Utility
Basket, and connection method and structure of pile and pole member using the basket

<P>PROBLEM TO BE SOLVED: To provide a basket which can certainly transmit a sectional force even under a construction condition of a low and narrow space and is easily constructed, and to provide a connection method and the structure of piles and pole members, using the…

EP 1,396,582 A2#9979523 Most Cited · 10 citations0.5/yr · PR 2.93PendingEP · Application
Reinforcement structure of truss bridge or arch bridge

Through co-action between auxiliary triangular structural frames which are each constructed at opposite ends of a truss girder or arch girder and a cable stretched between the auxiliary triangular structural frames, an upward directing force is exerted to the truss girder or…

JP 2002356814 A#9809727 Most Cited · 10 citations0.4/yr · PR 4.30ExpiredJP · Utility
Construction method of bridge pc floor slab
Inventors: Suzuki Akiyoshi, Sato Hiroyuki, Kawada HiroshiAssignee: Se CorpFiled 2001-05-31

PROBLEM TO BE SOLVED: To provide a construction method of a bridge PC floor slab capable of carrying out split construction for reducing a construction period for the construction method providing bridge axial prestress on the bridge PC floor slab in e.g. expressway, motorway or…

JP 2007170164 A#10144512 Most Cited · 10 citations0.5/yr · PR 2.51ActiveJP · Utility
Movement restricting device of structure

<P>PROBLEM TO BE SOLVED: To install a tension material in a tension exhibitable state even in a state in which a bracket can not be fixed near an upper end part of, for example, a lower structure, when restricting the relative movement of an upper structure to the lower…

JP 2008007998 A#9868395 Most Cited · 10 citations0.6/yr · PR 3.55ActiveJP · Utility
Diagonal tensile cable erection method
Inventors: Ohashi Wataru, Kibe HiroshiAssignee: Se CorpFiled 2006-06-28

<P>PROBLEM TO BE SOLVED: To provide a diagonal tensile cable erection method which contributes to efficient execution of temporary erection works of the diagonal tensile cable. <P>SOLUTION: According to the diagonal tensile cable erection method, when a plurality of…

JP 2017043949 A#10476327 Most Cited · 10 citations1.1/yr · PR 2.06ActiveJP · Utility
Assessment device for remnant tensile force of anchorage body

PROBLEM TO BE SOLVED: To provide a device for assessing remnant tensile force of a large number of ground anchors readily at a low cost, for responding to a demand on a device and a method for assessing the remnant tensile force of a large number of ground anchors readily at a…

JP 2018203607 A#10609673 Most Cited · 10 citations1.2/yr · PR 1.91ActiveJP · Utility
Method for producing magnesium hydride and the like, power generating system using magnesium hydride and apparatus for producing magnesium hydride and the like
Inventors: Takizawa Tsutomu, Morimoto Mineo, Sakamoto YuichiAssignee: Se CorpFiled 2017-11-28

To provide a method for producing magnesium hydride that emits no carbon dioxide and has good production efficiency, to provide a generating system using magnesium hydride that emits no carbon dioxide nor radiation and to provide an apparatus for producing magnesium hydride as…

JP 2001064914 A#11225995 Most Cited · 9 citations0.4/yr · PR 2.68ExpiredJP · Utility
Displacement restriction device-cum-bridge fall prevention device

PROBLEM TO BE SOLVED: To provide a displace restriction device-cum-bridge fall prevention device installed in a bridge or the like, capable of coping with displacement in an ordinary earthquake. SOLUTION: A connection member 4 having a specified length is installed and stoppers…

JP 2007205113 A#11034023 Most Cited · 9 citations0.5/yr · PR 3.63ActiveJP · Utility
Connecting device for structure
Inventors: Kibe Hiroshi, Suemune Hiroyuki, Fujita NorikazuAssignee: Se CorpFiled 2006-02-06

<P>PROBLEM TO BE SOLVED: To freely adjust the erection angle of a tension member to a bracket and to allow the tension member to follow the change of the erection angle in spite of simple structure in a connecting device impeding the relative displacement, exceeding a…

JP 2013011064 A#12056023 Most Cited · 9 citations0.7/yr · PR 1.73ActiveJP · Utility
Structure for breakwater, method of constructing breakwater, and breakwater
Inventors: Morimoto Mineo, Takeya KojiAssignee: Se CorpFiled 2011-06-28

PROBLEM TO BE SOLVED: To provide a structure for breakwater which has substantially the same slid resistance and fall resistance with a conventional breakwater, and can be constructed in a short period of construction because of problems of a conventional structure for…

US 2015278931 A1#12241089 Most Cited · 9 citations0.8/yr · PR 1.49PendingUS · Application
Native e-commerce transactables for familiar user environments
Inventors: Wantz Ii John T, Zabel Rhen, Vandenberg Greg, Piatenko TimAssignee: Comr Se CorpFiled 2014-07-31

Native e-commerce transactables for social and other familiar and/or suitable user environments are enabled. A user of a network site may interact with a transactable to conduct a transaction with a 3 rd party without leaving a user environment of the network site. The…

JP 2007009526 A#12487145 Most Cited · 8 citations0.4/yr · PR 3.27ExpiredJP · Utility
Spacer for protective pipe

<P>PROBLEM TO BE SOLVED: To damp vibration, by preventing the resonance of a cable, while improving its arranging workability, in a spacer for a protective pipe in a cable stayed bridge. <P>SOLUTION: This spacer 1 for the protective pipe being a clearance member is…

JP 2010229769 A#12899093 Most Cited · 8 citations0.5/yr · PR 2.21ActiveJP · Utility
Subaqueous caisson and method of reinforcement repair work for the same

<P>PROBLEM TO BE SOLVED: To provide a subaqueous caisson and a method of reinforcement repair work for the subaqueous caisson, which is simple in structure and low in cost, and can effectively prevent the slippage, fall or the like of the subaqueous caisson due to ocean…

KR 101,048,237 B1#12905246 Most Cited · 8 citations0.5/yr · PR 2.21ActiveKR · Utility
Block for covering of corner portion of sea mound
Inventors: Nam Hong Ki, Yukimoto TakakiAssignee: Nikken Kogaku Co Ltd, Korea Se CorpFiled 2010-12-09 · Granted 2011-07-08

PURPOSE: A corner coated block of a sea mound is provided to prevent damage to coated concrete blocks due to waves. CONSTITUTION: An inclined part(101) and a top part(102) meet at an upper edge. An upper corner coated block is coated on the upper edge. The length of a flat part…

JP 2003161044 A#14707339 Most Cited · 7 citations0.3/yr · PR 2.09ExpiredJP · Utility
Method for installing base-isolation device in existing column

<P>PROBLEM TO BE SOLVED: To simplify temporary work by reducing the installation number of temporary brackets which temporarily bear a vertical load of an upper structure, when a base-isolation device is installed in a partial section of an existing column so as to make an…