To provide a composition design method of sprayed concrete that can improve a rebound ratio in concrete spraying and a pumping efficiency of a sliding pump, that is, that can reduce a time for spraying concrete (in other word, a cycle time), and a concrete spray method.SOLUTION:…
Nishio T
PROBLEM TO BE SOLVED: To provide a work device capable of efficiently shaving and molding a natural ground, when interference occurs between a steel timbering and the natural ground while erecting the steel timbering in tunnel construction work.SOLUTION: In a first solution, a…
To solve such a problem that a work for loading a support on working equipment used for conventional tunnel construction has been poor work efficiency because it is executed by a lifting machine or a wrecker crane and so on as a carrier.SOLUTION: At first a telescopic erector…
ERICAMYCIN, NEW ANTIBIOTIC HAING EMPRICIAL FORMULA C31H23O8N, PRODUCED FROM A STRAIN OF STREPTOMYCES VARIUS, THE ANTIBIOTIC BEING USEFUL TO INHIBIT THE GROWTH OF GRAM-POSITIVE BACTERIA AND ALSO USEFUL TO INCREASE SYNERGETICALLY THE ACTION OF KANAMYCIN, STREPTOMYCIN,…
To provide a tunnel supporting installation device capable of finely adjusting the position of the supporting along the peripheral wall of the excavation pit (tunnel) without changing the position of the supporting in the front-rear direction of the tunnel.SOLUTION: A tunnel…
To provide a rotary type concrete spray machine improving drawbacks such that a discharge rate of the rotary type concrete spray machine used in concrete spraying for a tunnel construction is unstable because of a poor filling rate as material introduced from a hopper is not…
PROBLEM TO BE SOLVED: To provide a hydraulic circuit device capable of improving a processing capacity to an unexpected foreign matter generated in a drilling work of a tunnel construction or in a finishing operation after blast drilling.SOLUTION: Two-circuit branched oil…
PROBLEM TO BE SOLVED: To solve the problems of difficult driving caused by a narrow rear view angle through the window of a vessel front plate and difficult confirmation of fields of view on both sides of a vehicle body due to a special structure when an articulated dump truck…
To provide a spraying method capable of further improving working efficiency of spraying work.SOLUTION: In a spraying method of spraying a lining spray material on an inner hollow surface 92 of a tunnel cavity portion 90 being excavated, a spraying device having three or more…
To provide a tunnel supporting installation device capable easily installing the supporting.SOLUTION: The tunnel supporting installation device includes: a carriage 2; and a pair of erectors 3, 3 for installation of supporting, each of which can swing in the width direction and…
To solve a problem in which: in the past, dust generated during tunnel construction using a NATM construction method has been a problem, and countermeasures against dust inside a tunnel, where large equipment cannot be brought in, have become an issue; in particular, there has…
To solve the problem that there are many cases of causing portions that cannot be measured by three-dimensional measurement using measuring equipment installed on heavy machine used in conventional construction work.SOLUTION: A three-dimensional information processing device…
To provide a spray construction device that can perform efficient spraying work without interference between multiple spray nozzles.SOLUTION: A spraying construction device 1 for spraying a hardening material onto a tunnel excavation face includes a base machine 2 with traveling…
To solve the problem in which an installation of wire mesh for a tunnel construction has a high risk of disaster because operators get in a basket and approach a pit face to work.SOLUTION: For the first solution, in a work device for a tunnel construction, a rail is provided on…
To prevent a work loss generated by occurrence of a lateral displacement of a supporting due to traveling of an erector truck in erection of the supporting or vibration in work.SOLUTION: A holding part is provided at a supporting catcher, and the holding part has a pair of…