PROBLEM TO BE SOLVED: To enhance productivity by arranging upper and lower reinforcing bars in advance in a form, and folding connecting frames and the upper and lower main reinforcing bars between both side plates of the form. SOLUTION: In this form A comprising a plurality of…
Itokin Kk
PROBLEM TO BE SOLVED: To solve trouble, in which construction works in which a welded wire mesh is made to follow up flexibly to the irregularities and waviness or the like of a ground when there are these irregularities, waviness or the like can not be conducted because…
PROBLEM TO BE SOLVED: To prevent the leakage of a large amount of fresh concrete from net frame members during concrete placement in a free frame method in which the net frame members are arranged on two parallel lines and concrete is poured between the parallel net frame…
PROBLEM TO BE SOLVED: To easily attain filling-up at a low cost rapidly by pushing a return piece mounted to the outer circumference of a plug body formed in a tapered truncated come shape into a hole formed to a concrete surface such as a cone hole and preventing the return…
PROBLEM TO BE SOLVED: To provide a form for forming slope form in which a pair of net frame members is constituted of crimped nets and can follow the rugged surface of a slope without being caught on the rugged surface. SOLUTION: The form for forming slope form is constituted by…
PURPOSE: To make shape of folding-up compact and to improve efficiency in transportation and storage for a form for construction of slope protection that is made up of a pair of side boards arranged on the right and the left and a plurality of U-shaped inner frames that are…
PURPOSE:To improve workability while reducing cost by a method wherein the upper ends of vertical wires are bent in (n) shape along the longitudinal direction of horizontal wires and the front ends of the bent vertical wires are made to project below the horizontal wire on the…